Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PC 2-27-2024 Searchable Packet
CITY OF CUPERTINO PLANNING COMMISSION AGENDA 10350 Torre Avenue, Council Chamber and via teleconference Tuesday, February 27, 2024 6:45 PM IN-PERSON AND TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION Members of the public wishing to observe the meeting may do so in one of the following ways: 1) Attend in person at Cupertino Community Hall, 10350 Torre Avenue. 2) Tune to Comcast Channel 26 and AT&T U-Verse Channel 99 on your TV. 3) The meeting will also be streamed live at www.Cupertino.org/youtube and www.Cupertino.org/webcast Members of the public wishing to comment on an item on the agenda may do so in the following ways: 1) Appear in person at Cupertino Community Hall. Members of the audience who address the Commission must come to the lectern/microphone, and are requested to complete a Speaker Card and identify themselves. Completion of Speaker Cards and identifying yourself is voluntary and not required to attend the meeting or provide comments. 2) E-mail comments by 5:00 p.m. on Tuesday, February 27 to the Commission at planningcommission@cupertino.org. These e-mail comments will be received by the commission members before the meeting and posted to the City’s website after the meeting. Members of the public may provide oral public comments during the meeting as follows: Oral public comments will be accepted during the meeting. Comments may be made during “oral communications” for matters not on the agenda, and during the public comment period for each agenda item. Teleconferencing Instructions To address the Commission, click on the link below to register in advance and access the meeting: Online Page 1 1 PC 2-27-2024 1 of 163 Planning Commission Agenda February 27, 2024 Register in advance for this webinar: https://cityofcupertino.zoom.us/webinar/register/WN_avF9s9QnQCCpCXDKW85nQw Phone Dial: 669-900-6833 and enter WEBINAR ID: 982 7304 3975 (Type *9 to raise hand to speak, *6 to unmute yourself). Unregistered participants will be called on by the last four digits of their phone number. Or an H.323/SIP room system: H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 213.19.144.110 (Amsterdam Netherlands) 213.244.140.110 (Germany) 103.122.166.55 (Australia Sydney) 103.122.167.55 (Australia Melbourne) 69.174.57.160 (Canada Toronto) 65.39.152.160 (Canada Vancouver) Meeting ID: 982 7304 3975 SIP: 98273043975@zoomcrc.com After registering, you will receive a confirmation email containing information about joining the webinar. Please read the following instructions carefully: 1. You can directly download the teleconference software or connect to the meeting in your internet browser. If you are using your browser, make sure you are using a current and up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers, including Internet Explorer. 2. You will be asked to enter an email address and a name, followed by an email with instructions on how to connect to the meeting. Your email address will not be disclosed to the public. If you wish to make an oral public comment but do not wish to provide your name, you may enter “Cupertino Resident” or similar designation. 3. When the Chair calls for the item on which you wish to speak, click on “raise hand,” or, if you are calling in, press *9. Speakers will be notified shortly before they are called to speak. 4. When called, please limit your remarks to the time allotted and the specific agenda topic. PLEDGE OF ALLEGIANCE Page 2 2 PC 2-27-2024 2 of 163 Planning Commission Agenda February 27, 2024 ROLL CALL APPROVAL OF MINUTES 1.Subject: Approve the February 13 Planning Commission minutes. Recommended Action: Approve the February 13 Planning Commission minutes. 1 - Draft Minutes POSTPONEMENTS ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Commission on any matter within the jurisdiction of the Commission and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. WRITTEN COMMUNICATIONS CONSENT CALENDAR - NONE Unless there are separate discussions and/or actions requested by council, staff or a member of the public, it is requested that items under the Consent Calendar be acted on simultaneously. PUBLIC HEARINGS Effective January 1, 2023, Government Code Section 65103.5 (SB 1214) limits the distribution of copyrighted material associated with the review of development projects. Members of the public wishing to view plans that cannot otherwise be distributed under SB 1214 may make an appointment with the Planning Division to view them at City Hall by sending an email to planning@cupertino.org. Plans will also be made available digitally during the hearing to consider the proposal. 2.Subject: Hillside Exception to add a porch and roof deck, as well as landscape modifications at an existing hillside property on a prominent ridgeline and associated CEQA actions. (Application No(s).: EXC-2023-006; Applicant(s): Chris Pomodoro; Location: 22777 San Juan Rd.; APN(s): 342-22-104 Recommended Action: That the Planning Commission adopt the proposed draft resolution to: 1. Find the project exempt from CEQA; and 2. Approve the Hillside Exception (EXC-2023-006) (Attachment 1) Staff Report 1 – Draft Resolution for EXC-2023-006 2 – Site Plan and Renderings 3 – Vantage Point Visual Analysis Page 3 3 PC 2-27-2024 3 of 163 Planning Commission Agenda February 27, 2024 OLD BUSINESS - NONE NEW BUSINESS 3.Subject: 2023 General Plan and Housing Element Annual Progress Reports (APR). Recommended Action: Receive the General Plan and Housing Element APRs. Staff Report 1 - Draft General Plan Annual Progress Report 2 - Draft Housing Element Annual Progress Report STAFF AND COMMISSION REPORTS FUTURE AGENDA SETTING ADJOURNMENT If you challenge the action of the Planning Commission in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this agenda, or in written correspondence delivered to the City of Cupertino at, or prior to, the public hearing. In the event an action taken by the Planning Commission is deemed objectionable, the matter may be officially appealed to the City Council in writing within fourteen (14) days of the date of the Commission’s decision. Said appeal is filed with the City Clerk (Ordinance 632). In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Any writings or documents provided to a majority of the Planning Commission after publication of the packet will be made available for public inspection in the Community Development Department located at City Hall, 10300 Torre Avenue, Cupertino, California 95014, during normal business hours; and in Planning packet archives linked from the agenda/minutes page on the Cupertino web site. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website. Page 4 4 PC 2-27-2024 4 of 163 Planning Commission Agenda February 27, 2024 Members of the public are entitled to address the Planning Commission concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the Planning Commission on any issue that is on this agenda, please complete a speaker request card located in front of the Commission, and deliver it to the City Staff prior to discussion of the item. When you are called, proceed to the podium and the Chair will recognize you. If you wish to address the Planning Commission on any other item not on the agenda, you may do so by during the public comment portion of the meeting following the same procedure described above. Please limit your comments to three (3) minutes or less. For questions on any items in the agenda, or for documents related to any of the items on the agenda, contact the Planning Department at (408) 777 3308 or planning@cupertino.org. Page 5 5 PC 2-27-2024 5 of 163 CITY OF CUPERTINO Agenda Item 24-12975 Agenda Date: 2/27/2024 Agenda #: 1. Subject: Approve the February 13 Planning Commission minutes. Approve the February 13 Planning Commission minutes. CITY OF CUPERTINO Printed on 2/21/2024Page 1 of 1 powered by Legistar™6 PC 2-27-2024 6 of 163 DRAFT MINUTES CUPERTINO PLANNING COMMISSION Tuesday, February 13, 2024 At 6:45 p.m. Chair Steven Scharf called the Regular Planning Commission meeting to order and led the Pledge of Allegiance in the Cupertino Community Hall Council Chamber, 10350 Torre Avenue and via teleconference. ROLL CALL Present: Chair Steven Scharf, Vice Chair Muni Madhdhipatla, and Commissioners David Fung, Seema Lindskog and Tejesh Mistry. Absent: None APPROVAL OF MINUTES 1. Subject: Approve the December 12 Planning Commission minutes. Recommended Action: Approve the December 12 Planning Commission minutes. MOTION: Madhdhipatla moved and Fung seconded to approve the December 12 Planning Commission minutes. The motion carried with the following vote: Ayes: Scharf, Madhdhipatla, Fung, Mistry and Lindskog. Noes: None. Abstain: None. Absent: None. POSTPONEMENTS - None ORAL COMMUNICATIONS Jennifer Griffin discussed her concern that the HCD RHNA numbers were incorrect, and the Housing Element be stopped to reassess. San R discussed light weight Planning Commission agendas and the lack of housing element discussions and updates. WRITTEN COMMUNICATIONS - None CONSENT CALENDAR - None PUBLIC HEARINGS - None 7 PC 2-27-2024 7 of 163 Planning Commission February 13, 2024 Minutes Page 2 OLD BUSINESS - None NEW BUSINESS 2. Subject: Election of Planning Commission Chair and Vice Chair, and Committee representatives and 2024 meeting schedule Recommended Action: Elect Planning Commission Chair and Vice Chair and approve the meeting schedule for 2024 (see Attachment 1). Chair Scharf opened the public hearing and the following people spoke. Jennifer Griffin Jennifer Shearin, Parks and Recreation Commissioner (representing self) Herve’ Marcy, Bicycle Pedestrian Commissioner (representing self) Helen Davis San R Chair Scharf closed the public hearing. Assistant Director of Community Development Luke Connolly delivered the staff report. Chair Scharf asked for nominations for Planning Commission Chair. MOTION: Commissioner Mistry moved and Commissioner Lindskog seconded to nominate Commissioner Lindskog for Planning Commissioner Chair. MOTION: Vice Chair Madhdhipatla made a substitute motion and Chair Scharf seconded to nominate Commissioner Fung for Planning Commissioner Chair. The substitute motion carried with the following vote: Ayes: Scharf, Madhdhipatla, Fung Noes: Lindskog, Mistry Abstain: None Absent: None Chair Scharf asked for nominations for Planning Commission Vice Chair. MOTION: Chair Scharf moved and no one seconded to nominate Vice Chair Madhdhipatla for Planning Commissioner Vice Chair. MOTION: Commissioner Mistry moved and Chair Fung seconded to nominate Commissioner Lindskog for Planning Commissioner Vice Chair. 8 PC 2-27-2024 8 of 163 Planning Commission February 13, 2024 Minutes Page 3 The motion carries with the following vote: Ayes: Scharf, Mistry, Lindskog, Fung Noes: Madhdhipatla Abstain: None Absent: None Chair Scharf asked for nominations for the Housing Commission representative. MOTION: Chair Scharf moved and Vice Chair Madhdhipatla seconded for himself to act as the Housing Commission representative. The motion was not voted on. MOTION: Commissioner Mistry made a substitute motion and Commissioner Fung seconded for Commissioner Lindskog to act as the Housing Commission representative. The motion carried with the following vote: Ayes: Mistry, Lindskog, Fung, Mistry. Noes: Scharf, Madhdhipatla. Abstain: None Absent: None Commissioners and staff discussed the 2024 Planning Commission schedule. MOTION: Commissioner Mistry moved and Commissioner Lindskog seconded to cancel the fourth Tuesday meetings for November and December of the 2024 Planning Commission meeting schedule. The motion carried with the following vote: Ayes: Scharf, Mistry, Madhdhipatla, Lindskog, Fung. Noes: None. Abstain: None Absent: None 3. Subject: Discuss City Council Work Program Items for 2024 Recommended Action: Recommend City Council Work Program Items for 2024 Assistant Director of Community Development Luke Connolly introduced the item and delivered the staff report. Written Communications for this item included staff and emails to the Commission. Chair Fung opened the public hearing and the following people spoke. Jennifer Griffin San R Babu Srinivasan Chair Fung closed the public hearing. Commissioners asked questions, discussed, made comments and suggestions. 9 PC 2-27-2024 9 of 163 Planning Commission February 13, 2024 Minutes Page 4 MOTION: Vice Chair Lindskog moved and Commissioner Mistry seconded to recommend that the following three projects be added to the City Work Program: • Expedited permits for climate positive home improvements. • A Complete Streets Ordinance; and • A small business revitalization ordinance. FRIENDY AMMENDMENT: Scharf made a friendly amendment to rank the Complete Streets Ordinance as a higher priority than the other two recommendations. (Lindskog accepted the friendly amendment) The motion as amended carried with the following vote: Ayes: Fung, Lindskog, Madhdhipatla, Mistry and Scharf. Noes: None. Abstain: None. Absent: None. STAFF AND COMMISSION REPORTS None. FUTURE AGENDA SETTING Commissioners added the following future agenda items: - An update on housing element (Mistry) - An update on status for major projects already approved and in progress (Mistry, Fung) - An update on ADU and SB9 application numbers (Scharf, Madhdhipatla) - A discussion of items to be included in a possible small repairs ordinance (Lindskog) - A staff report that breaks down the number, size and time taken for different permits (Madhdhipatla, Fung, Lindskog) ADJOURNMENT At 8:32p.m., Chair Fung adjourned the Regular Planning Commission Meeting. Minutes prepared by: _______________________________ Jon de Ridder, Administrative Assistant 10 PC 2-27-2024 10 of 163 CITY OF CUPERTINO Agenda Item 24-12979 Agenda Date: 2/27/2024 Agenda #: 2. Subject: Hillside Exception to add a porch and roof deck, as well as landscape modifications at an existing hillside property on a prominent ridgeline and associated CEQA actions. (Application No (s).: EXC-2023-006; Applicant(s): Chris Pomodoro; Location: 22777 San Juan Rd.; APN(s): 342-22-104 That the Planning Commission adopt the proposed draft resolution to: 1. Find the project exempt from CEQA; and 2. Approve the Hillside Exception (EXC-2023-006) (Attachment 1) CITY OF CUPERTINO Printed on 2/23/2024Page 1 of 1 powered by Legistar™11 PC 2-27-2024 11 of 163 PLANNING COMMISSION STAFF REPORT Meeting: February 27, 2024 SUBJECT Hillside Exception to add a porch and roof deck, as well as landscape modifications at an existing hillside property on a prominent ridgeline and associated CEQA actions. (Application No(s).: EXC-2023-006; Applicant(s): Chris Pomodoro; Location: 22777 San Juan Rd.; APN(s): 342-22-104) RECOMMENDED ACTIONS That the Planning Commission adopt the proposed draft resolution to: 1. Find the project exempt from CEQA; and 2. Approve the Hillside Exception (EXC-2023-006) (Attachment 1) DISCUSSION Project Data: General Plan Designation: Very Low Density (1/2 Acre Slope Density Formula) Zoning Designation: RHS-21 (Residential Hillside with minimum net lot area of 21,000 sq.ft.) Net Lot Area 26,283 sq. ft. (.60 acres)1 Project Data Allowed Existing Proposed Total Flat Yard Area (square feet) 2,500 max., exclude driveways 0 2,481 2,481 Site Grading (in cubic yards) 2,500 1,280 130 1,410 Floor Area (square feet) 5,302 5,010 25 5,035 Second Story Setback – Deck Required Existing Proposed South Right-Side Setback 15-feet 32-feet 7- inches 31-feet 10-inches North Left-Side Setback NA 17 feet- 6-inches 1 The neighboring parcel to the west, located at 22801San Juan Road (342 -22-105) is owned by the applicant as well and is partially utilized for parking and access. No changes to this parc el are proposed except for a small portion of driveway material, as well as a decomposed granite pathway, both of which do not require a Hillside Exception. Net Lot Area only accounts for parcel (342 -22-104). 12 PC 2-27-2024 12 of 163 Rear Setback 20 feet 102-feet 79-feet 4-inches Project Consistency with: General Plan: Yes Zoning: Yes, with approved Hillside Exception Environmental Assessment: Categorically Exempt per Section 15303 (Class 3) of the California Environmental Quality Act (CEQA) construction or conversion of small facilities or structures. Background: The project site (Figure 1) is located within the Inspiration Heights neighborhood in a Residential Hillside (RHS) zoning district and is surrounded by hillside single-family residences. The RHS district is intended to balance residential uses with preserving natural settings and protecting life and property from natural hazards. The property is accessed off San Juan Road. The site contains a 5,302 sf two story home developed in 1995. Application Request The applicant, Chris Pomodoro of Pomodoro Architects, is proposing to add approximately 2,481 sf rear yard paved terrace area, with a spa, outdoor kitchen, fire pits, and planters. A portion of the terrace area will be covered by a new trellis and a 568-sf roof deck, accessed via the second floor of the existing residence and an exterior staircase. The principal dwelling area will have some minor façade changes that include several new windows, an extended bay window in the living room, and an extended 46-sf side balcony. Five trees will be removed as part of landscape modifications; however, none are considered protected per the City of Cupertino’s Municipal Code Chapter 14.18: Protected Trees. Please refer to Attachment 2 for site plans and renderings. Analysis: Hillside Exception The RHS Ordinance, Chapter 19.40 of the Cupertino Municipal Code, prohibits any additions to existing structures within the 15% site line of prominent ridgeline unless an Figure 1 Site Aerial with the prominent ridge line in yellow. 13 PC 2-27-2024 13 of 163 exception is granted. These additions shall not further encroach into the site line and add height or bulk which may increase the disruption to the 15% ridgeline site line. The intent of the requirement is to minimize and discourage unnecessary visual disturbances. However, if the project/ property presents unique circumstances or hardships (typically physical/topographic challenges), then the RHS ordinance allows a process by which the City may consider an exception, provided that the project is designed to minimize the extent of the exception and impacts to the surrounding hillside. The City has historically granted exceptions to allow reasonable development of steeper hillside properties planned for residential use. As demonstrated in Figure 1, the prominent ridge line runs through the middle of the property, dissecting the existing home and rear yard area. Further, much of the property near the property line has slopes greater than 30%. Therefore, almost any development on the property, outside of the existing building footprint and the adjacent rear yard area, cannot be constructed without disturbing steep slope sides. Accordingly, the only feasible location to construct a terraced area would be on the flatter portion of the parcel on the prominent ridge line as is proposed here. The siting and design of the proposed roof deck and terraced area minimizes the need for excessive grading as it is adjacent to the house. A visual analysis has been conducted from established vantage points on the valley floor which establishes that the proposed development, even with the removal of the proposed trees, does not substantially affect the views of the hills from the valley floor (see Attachment 3). Therefore, except that the proposed development occurs on a prominent ridgeline, the proposed roof deck and terraced area complies with all other aspects of the RHS zone’s Figure 2 Landscape Plan showing area of work (circled in red) and slope areas over 30% grade hashed. See Attachment 2 for site plan. 14 PC 2-27-2024 14 of 163 site development regulations. The development will be constructed with appropriate geotechnical review and inspections as described below. Cupertino Municipal Code Findings The Cupertino Municipal Code includes ‘findings’ for approval of various permits necessary to approve the proposed project. These provide a framework for making decisions and facilitating an orderly analysis of the review of a project. Listed below are the findings for the Hillside Exception sought by the applicant that the City must make in rendering a decision whether to grant an exception on this project. Hillside Exception (CMC 19.40.080) 1. The proposed development will not be injurious to property or improvements in the area nor be detrimental to public health and safety; The proposed site is surrounded by existing hillside single-family residences. A geotechnical study has been conducted for the proposed project and a peer review will be conducted for the development prior to issuance of Building Permits. In addition, the development is required to meet the Best Management Practices (BMPs), as required by the State Water Resources Control Board and the Bay Area Air Quality Management District’s (BAAQMD) air quality standards for construction activities. The project is also required to adhere to the City’s C.3 Municipal Permit for storm water runoff management. Therefore, the development will not be injurious to property or improvements in the area nor be detrimental to the public health and safety. 2. The proposed development will not create a hazardous condition for pedestrian or vehicular traffic; The project will not create any new traffic impacts and/or driveways to San Juan Road. Therefore, the development will not create a hazardous condition for pedestrian or vehicular traffic. 3. The proposed development has legal access to public streets and public services are available to serve the development; The property is accessed by San Juan Road. In addition, water and utilities are available in the street. The proposed project does not propose any changes to such access or services. Therefore, the development has legal access to public streets and public services to serve the development. 4. The proposed development requires an exception which involves the least modification of, or deviation from, the development regulations prescribed in this chapter necessary to accomplish a reasonable use of the parcel; 15 PC 2-27-2024 15 of 163 Any onsite development that disrupts the 15% sight line of the prominent ridgeline requires a Hillside Exception per the Municipal Code. Development cannot feasibly occur on the property without a Hillside Exception request, as the site is constrained by a prominent ridgeline that runs through the middle of the property. The roof deck and other modifications to the principal dwelling unit do not add height and bulk to the structure, and are being made consistent with the regulations in the Residential Hillside (RHS) Ordinance. 5. All alternative locations for development on the parcel have been considered and have been found to create greater environmental impacts than the location of the proposed development; The paved terraced area is proposed in a relatively flat portion of the property in order to avoid excessive grading of the site. Further, the site is constrained by steep slopes that limit areas on the parcel where development may occur. The siting and design of the terraced area will minimize grading and minimize the removal of landscaping necessary to develop the property in a manner consistent with the purpose of the Residential Hillside Ordinance. Other alternative locations for development on the parcel would result in greater grading on the site, removal of additional landscaping and/or native trees, and possibly increase disruption of the 15% sight line of the prominent ridgeline. The proposed development will be located to minimize environmental and grading impacts on the site. 6. The proposed development does not consist of structures on or near known geological or environmental hazards which have been determined by expert testimony to be unsafe or hazardous to structures or persons residing therein (See General Plan Policy 2-49); The geotechnical report did not indicate any significant conflicts with geological or environmental hazards. Further, a peer review of the Geologic/fault investigation and geotechnical report will be peer reviewed by the City’s consultant prior to issuance of Building Permits. Therefore, the proposed development does not consist of structures that have been determined by expert testimony to be unsafe or hazardous to structures or persons residing therein. 7. The proposed development includes grading and drainage plans which will ensure that erosion and scarring of the hillsides caused by necessary construction of roads, housing sites, and improvements will be minimized (See General Plan Policies 2 -53, 2-54 and 2-57); The proposed development follows, as closely as possible, the primary natural contours of the lot to minimize erosion and scarring of the hillsides caused by necessary construction of the housing site and improvements. Drainage and grading plans have been reviewed and will 16 PC 2-27-2024 16 of 163 continue to be reviewed by the City Engineer and the City’s consultant geotechnical engineers to ensure the safety of the development and neighboring residences. 8. The proposed development does not consist of structures which would disrupt the natural silhouette of ridgelines as viewed from established vantage points on the valley floor unless either: a. The location of a structure on a ridgeline is necessary to avoid greater negative environmental impacts; or b. The structure could not otherwise be physically located on the parcel and the size of the structure is the minimum which is necessary to allow for a reasonable use of the parcel (See General Plan Policies 2-46, 2-47 and 2-48); The proposed roof deck and terrace area will be largely located in an area that previously encompassed a deck to avoid excessive grading of the site. Additionally, the visual study from established vantage points on the valley floor do not indicate that the proposed development is more visually intrusive than earlier. Development cannot feasibly occur on the property without a Hillside Exception request as the site is constrained by a prominent ridgeline that runs through the middle of the property. Further, the site is constrained by steep slopes that limit areas on the parcel where development may occur. The siting and design minimizes grading and removal of landscaping necessary to develop the property in a manner consistent with the Residential Hillside Ordinance. Other alternative locations for development on the parcel would result in greater grading on the site, removal of additional landscaping and/or native trees, and possibly increase disruption of the 15% sight line of the prominent ridgeline. The proposed development will be located to minimize environmental and grading impacts on the site. 9. The proposed development consists of structures incorporating designs, colors, materials, and outdoor lighting which blend with the natural hillside environment and which are designed in such a manner as to reduce the effective visible mass, including building height, as much as possible without creating other negative environmental impacts (See General Plan Policies 2-46, 2-50, 2-51 and 2-52); The applicant is required to use natural earth tone and/or vegetation colors, which blend with the natural hillside environment (as a condition of approval) and has designed the project in such a manner as to reduce the effective visible mass to surrounding neighbors as much as possible. 10. The proposed development is located on the parcel as far as possible from public open space preserves or parks (if visible there from), riparian corridors, and wildlife habitats unless such location will create other, more negative environmental impacts (See General Plan Policies 2-55, 5-14 and 5-28); 17 PC 2-27-2024 17 of 163 The parcel is not located adjacent to public open space preserves, parks, a riparian corridor, or wildlife habitats. The project site is adjacent to other developed properties with similar zoning. 11. The proposed development includes a landscape plan, which retains as many specimen trees as possible, which utilizes drought-tolerant native plants and ground covers consistent with nearby vegetation, and which minimizes lawn areas (See 1993 General Plan Policies 2-54, 5-15 and 5-16); The project is conditioned to provide a landscape plan to be reviewed and approved prior to Building Permit issuance. The project shall also comply with Chapter 14.15: Landscape Ordinance of the City of Cupertino Municipal Code (CMC). Additionally, since the site is located in an area designated as Wildland Urban Interface by CMC Chapter 16.74, fire-prone plant materials and highly flammable mulches are strongly discouraged. In conformance with California Public Resources Code Section 4291, plants shall be selected, arranged, and maintained to provide defensible space for wildfire protection. The installation of invasive plant species and noxious weeds are also prohibited. Further, Residential Hillside homes are required to minimize turf areas on hillsides and turf may not be planted on slopes greater than 25%. Through the proposed site design and conditions of approval, which limit invasive species of plants and turf areas, a balance between the residential development and preservation of the natural hillside setting will be maintained. 12. The proposed development confines solid fencing to the areas near a structure rather than around the entire site (See General Plan Policy 5-17); and No fencing is proposed or approved as part of this project. 13. The proposed development is otherwise consistent with the City's General Plan and with the purposes of this chapter as described in Section 19.40.010. The development meets all the development standards for RHS zoned properties and is consistent with the City's General Plan and with the purposes of Chapter 19.40 as described in Section 19.40.010. These have been described in detail in each of the findings above. Geological Review: The property is in a hillside and fault rupture hazard zone. The City’s Geotechnical Consultant is conditioned to peer-review the applicant’s geotechnical reports prior to the issuance of Building Permits. Environmental Assessment: The project is categorically exempt from the requirements of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), pursuant to CEQA 18 PC 2-27-2024 18 of 163 Guidelines section 15303. The exemption applies to new construction or conversion of small facilities or structures, including single-family residences (see CEQA Guidelines § 15303(a)) and accessory structures, such as patios and swimming pools (see CEQA Guidelines § 15303(e)), and none of the exceptions to the categorical exemptions in CEQA Guidelines section 15300.2 apply. Other Department/Agency Review: The City’s Building Division, Public Works Department, and the Santa Clara County Fire Department have reviewed and conditionally approved the project. Their pre-hearing comments/conditions have been incorporated as conditions of approval in the draft resolution (Attachment 1). PUBLIC NOTICING & OUTREACH The following table is a brief summary of the noticing done for this project: Public Notice Agenda Site Signage (14 days prior to the hearing) Legal ad placed in newspaper (at least 10 days prior to the hearing) 70 public hearing notices mailed to property owners within 300 feet of the project site (10 days prior to the hearing) Posted on the City’s official notice bulletin board (one week prior to the hearing) Posted on the City of Cupertino’s website (one week prior to the hearing) No public comments have been received as of the date of production of this staff report (February 22, 2024). NEXT STEPS Should the project be approved, the Planning Commission’s decision on this proposal is final unless an appeal is filed within 14-calendar days of the date of the mailing of the decision on February 27, 2024. The applicant may apply for building and other permits at the end of the appeal period. This approval expires on February 27, 2026, at which time the applicant may apply for a one-year extension. Prepared by: Gian Paolo Martire, Senior Planner Reviewed by: Piu Ghosh, Planning Manager Approved by: Luke Connolly, Assistant Director of Community Development 19 PC 2-27-2024 19 of 163 ATTACHMENTS: 1 – Draft Resolution for EXC-2023-006 2 – Site Plan and Renderings 3 – Vantage Point Visual Analysis 20 PC 2-27-2024 20 of 163 DRAFT RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING A HILLSIDE EXCEPTION TO ADD A PORCH AND ROOF DECK, AS WELL AS LANDSCAPE MODIFICATIONS AT AN EXISTING HILLSIDE PROPERTY ON A PROMINENT RIDGELINE LOCATED AT 22777 SAN JUAN ROAD SECTION I: PROJECT DESCRIPTION Application No.: EXC-2023-006 Applicant: Chris Pomodoro, Pomodoro Architects Property Owner: Venktesh and Abha Shukla Location: 22777 San Juan Road (APN 342-22-104) SECTION II: FINDINGS FOR A HILLSIDE EXCEPTION: WHEREAS, the Planning Commission of the City of Cupertino received an application for a Hillside Exception as described in Section I of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held at least one public hearing in regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15303 for the reasons set forth in the staff report dated February 23, 2021 and incorporated herein; and WHEREAS, on February 27, 2024, the Planning Commission held a duly noticed public hearing to receive public testimony on the Project, including the categorical CEQA exemption in CEQA Guidelines section 15303, and reviewed and considered the information contained in the staff report pertaining to the Project, all other pertinent documents, and all written and oral statements received by the Planning Commission at or prior to the public hearing; and 21 PC 2-27-2024 21 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 2 WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Planning Commission finds as follows with regard to this application: 1. The proposed development will not be injurious to property or improvement s in the area nor be detrimental to public health and safety; The proposed site is surrounded by existing hillside single-family residences. A geotechnical study has been conducted for the proposed project and a peer review will be conducted for the development prior to issuance of Building Permits. In addition, the development is required to meet the Best Management Practices (BMPs), as required by the State Water Resources Control Board and the Bay Area Air Quality Management District’s (BAAQMD) air quality standards for construction activities. The project is also required to adhere to the City’s C.3 Municipal Permit for storm water runoff management. Therefore, the development will not be injurious to property or improvements in the area nor be detrimental to the public health and safety. 2. The proposed development will not create a hazardous condition for pedest rian or vehicular traffic; The project will not create any new traffic impacts and/or driveways to San Juan Road. Therefore, the development will not create a hazardous condition for pedestrian or vehicular traffic. 3. The proposed development has legal access to public streets and public services are available to serve the development; The property is accessed by San Juan Road. In addition, water and utilities are available in the street. The proposed project does not propose any changes to such access or services. Therefore, the development has legal access to public streets and public services to serve the development. 4. The proposed development requires an exception which involves the least modification of, or deviation from, the development regulations prescribed in this chapter necessary to accomplish a reasonable use of the parcel; Any onsite development that disrupts the 15% sight line of the prominent ridgeline requires a Hillside Exception per the Municipal Code. Development cannot feasibly occur on the property without a Hillside Exception request, as the site is constrained by a prominent ridgeline that runs through the middle of the property. The roof deck and other modifications to the principal dwelling unit do not add height and bulk to the structure, and are being made consistent with the regulations in the Residential Hillside (RHS) Ordinance. 22 PC 2-27-2024 22 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 3 5. All alternative locations for development on the parcel have been considered and have been found to create greater environmental impacts than the location of the proposed development; The paved terraced area is proposed in a relatively flat portion of the property in order to avoid excessive grading of the site. Further, the site is constrained by steep slopes that limit areas on the parcel where development may occur. The siting and design of the terraced area will minimize grading and minimize the removal of landscaping necessary to develop the property in a manner consistent with the purpose of the Residential Hillside Ordinance. Other alternative locations for development on the parcel would result in greater grading on the site, removal of additional landscaping and/or native trees, and possibly increase disruption of the 15% sight line of the prominent ridgeline. The proposed development will be located to minimize environmental and grading impacts on the site. 6. The proposed development does not consist of structures on or near known geological or environmental hazards which have been determined by expert testimony to be unsafe or hazardous to structures or persons residing therein (See General Plan Policy 2-49); The geotechnical report did not indicate any significant conflicts with geological or environmental hazards. Further, a peer review of the Geologic/fault investigation and geotechnical report will be peer reviewed by the City’s consultant prior to issuance of Building Permits. Therefore, the proposed development does not consist of structures that have been determined by expert testimony to be unsafe or hazardous to structures or persons residing therein. 7. The proposed development includes grading and drainage plans which will ensure that erosion and scarring of the hillsides caused by necessary construction of roads, housing sites, and improvements will be minimized (See General Plan Policies 2-53, 2-54 and 2-57); The proposed development follows, as closely as possible, the primary natural contours of the lot to minimize erosion and scarring of the hillsides caused by necessary construction of the housing site and improvements. Drainage and grading plans have been reviewe d and will continue to be reviewed by the City Engineer and the City’s consultant geotechnical engineers to ensure the safety of the development and neighboring residences. 8. The proposed development does not consist of structures which would disrupt the natural silhouette of ridgelines as viewed from established vantage points on the valley floor unless either: a. The location of a structure on a ridgeline is necessary to avoid greater negative environmental impacts; or 23 PC 2-27-2024 23 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 4 b. The structure could not otherwise be physically located on the parcel and the size of the structure is the minimum which is necessary to allow for a reasonable use of the parcel (See General Plan Policies 2-46, 2-47 and 2-48); The proposed roof deck and terrace area will be largely located in an area that previously encompassed a deck to avoid excessive grading of the site. Additionally, the visual study from established vantage points on the valley floor do not indicate that the proposed development is more visually intrusive than earlier. Development cannot feasibly occur on the property without a Hillside Exception request as the site is constrained by a prominent ridgeline that runs through the middle of the property. Further, the site is constrained by steep slopes that limit areas on the parcel where development may occur. The siting and design minimizes grading and removal of landscaping necessary to develop the property in a manner consistent with the Residential Hillside Ordinance. Other alternative locations for development on the parcel would result in greater grading on the site, removal of additional landscaping and/or native trees, and possibly increase disruption of the 15% sight line of the prominent ridgeline. The proposed development will be located to minimize environmental and grading impacts on the site. 9. The proposed development consists of structures incorporating designs, colors, materials, and outdoor lighting which blend with the natural hillside environment and which are designed in such a manner as to reduce the effective visible mass, including building height, as much as possible without creating other negative environmental impacts (See General Plan Policies 2-46, 2-50, 2-51 and 2-52); The applicant is required to use natural earth tone and/or vegetation colors, which blend with the natural hillside environment (as a condition of approval) and has designed the project in such a manner as to reduce the effective visible mass to surrounding neighbors as much as possible. 10. The proposed development is located on the parcel as far as possible from public open space preserves or parks (if visible there from), riparia n corridors, and wildlife habitats unless such location will create other, more negative environmental impacts (See General Plan Policies 2-55, 5-14 and 5-28); The parcel is not located adjacent to public open space preserves, parks, a riparian corridor, or wildlife habitats. The project site is adjacent to other developed properties with a similar zoning. 11. The proposed development includes a landscape plan, which retains as many specimen trees as possible, which utilizes drought-tolerant native plants and ground covers consistent with nearby vegetation, and which minimizes lawn areas (See General Plan Policies 2-54, 5-15 and 5-16); 24 PC 2-27-2024 24 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 5 The project is conditioned to provide a landscape plan to be reviewed and approved prior to Building Permit issuance. The project shall also comply with Chapter 14.15: Landscape Ordinance of the City of Cupertino Municipal Code (CMC). Additionally, since the site is located in an area designated as Wildland Urban Interface by CMC Chapter 16.74, fire-prone plant materials and highly flammable mulches are strongly discouraged. In conformance with California Public Resources Code Section 4291, plants shall be selected, arranged, and maintained to provide defensible space for wildfire protection. The installation of invasive plant species and noxious weeds are also prohibited. Further, Residential Hillside homes are required to minimize turf areas on hillsides and turf may not be planted on slopes greater than 25%. Through the proposed site design and conditions of approval, which limit invasive species of plants and turf areas, a balance between the residential development and preservation of the natural hillside setting will be maintained. 12. The proposed development confines solid fencing to the areas near a structure rather than around the entire site (See General Plan Policy 5-17); and No fencing is proposed or approved as part of this project. 13. The proposed development is otherwise consistent with the City's General Plan and with the purposes of this chapter as described in Section 19.40.010. The development meets all the development standards for RHS zoned properties and is consistent with the City's General Plan and with the purposes of Chapter 19.40 as described in Section 19.40.010. These have been described in detail in each of the findings above. WHEREAS, the Planning Commission has independently reviewed and considered the Project and the basis for the exemption prior to taking any approval actions on the Project, and exercising its independent judgment, based upon the entire record before it, has determined that the Project is exempt from CEQA pursuant to CEQA Guidelines section 15303, which applies to new construction or conversion of single-family residences and accessory structures; and NOW, THEREFORE, BE IT RESOLVED that the Planning Commission takes the following actions: 1. Exercises its independent judgment and determines that the Project is exempt from CEQA pursuant to CEQA Guidelines section 15303. The exemption in CEQA Guidelines section 15303 applies to new construction or conversion of single-family residences and accessory structures. The proposed project is accessory to the existing single-family residence. 25 PC 2-27-2024 25 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 6 2. Approves the application for a Hillside Exception, Application no. EXC-2023-006 subject to the conditions which are enumerated in this Resolution beginning on PAGE 6 thereof. The conclusions and subconclusions upon which the findings and conditions specified in this resolution are based, including those contained in the Public Hearing record concerning Application no. EXC-2023-006 as set forth in the Minutes of Planning Commission Meeting of February 27, 2024, are hereby incorporated by reference as though fully set forth herein. NOW, THEREFORE, BE IT FURTHER RESOLVED that the foregoing recitals are true and correct and are included herein by reference as findings. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set consisting of forty (40) sheets, labled Sheets A0.0 – A4.0, C1.0 – C5.0, E2.0, E2.1, ER1, ER2, EX1.0-EX3.2, L0.0 – L5.2, SU1 and SW1, entitled, “22777 San Juan Road,” drawn and submitted by Chris Pomodoro of Pomodoro Architects. 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 3. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible for verifying all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The exterior colors and materials shall be natural earth tones and have low light reflectivity values of 60 or less. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. 26 PC 2-27-2024 26 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 7 5. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demo lition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall annotate all permit plans with the above requirements and shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 6. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. 27 PC 2-27-2024 27 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 8 d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations. The applicant shall incorporate the City’s construction best management practices into the building permit plan set prior to any grading, excavation, foundation or building permit issuance. 7. CONSTRUCTION MANAGEMENT PLAN Final map improvement plans shall include a construction management plan detailing how construction activities will be conducted. The plan shall address, but not be limited to the following activities: a. Construction staging area (shall not occur within 15 feet of neighboring residential property lines) b. Construction schedule and hours c. Construction phasing plan, if any d. Contractor parking area e. Tree preservation/protection plan f. Site dust, noise and storm run-off management plan g. Emergency/complaint and construction site manager contacts 8. DEMOLITION OF STRUCTURES All demolished buildings and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials will be recycled prior to issuance of demolition permit. 28 PC 2-27-2024 28 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 9 9. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 10. NESTING BIRDS Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. a. Construction and tree removal/pruning activities shall be scheduled to avoid the nesting season to the extent feasible. If feasible, tree removal and/or pruning shall be completed before the start of the nesting season to help preclude nesting. The nesting season for most birds and raptors in the San Francisco Bay area extends from February 1 through August 31. Preconstruction surveys (described below) are not required for tree removal or construction activities outside the nesting period. b. If construction activities and any required tree removal occur during the nesting season (February 1 and August 31), a qualified ornithologist shall be required to conduct surveys prior to tree removal or construction activities. Preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal, pruning or construction. Preconstruction surveys shall be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. During this survey, the ornithologist shall inspect all trees and other possible nesting habitats in and immediately adjacent to the construction areas for nests. c. If the survey does not identify any nesting birds that would be affected by construction activities, no further mitigation is required. If an active nest containing viable eggs or young birds is found sufficiently close to work areas to be disturbed by these activities, their locations shall be documented and protective measures implemented under the direction of the qualified ornithologist until the nests no longer contain eggs or young birds. d. Protective measures shall include establishment of clearly delineated exclusion zones (i.e. demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified 29 PC 2-27-2024 29 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 10 ornithologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist, if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. e. A final report on nesting birds and raptors, including survey methodology, survey date(s), map of identified active nests (if any), and protection measures (if required), shall be submitted to the Planning Manager, through the building permit review process, and be completed to the satisfaction of the Community Development Director prior to the start of grading. 11. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 12. ENGINEERED PLANS, CALCULATIONS, AND DETAILS Engineered plans, calculations, and details of the deck, and deck foundation shall be prepared that incorporate the geotechnical design recommendations. 13. GEOTECHNICAL PLAN REVIEW AND SUPPLEMENTAL GEOTECHNICAL CONSIDERATIONS The City Geotechnical Consultant shall review the development plans to assure that they are in conformance with the geotechnical design recommendations prior to building permit issuance. The Engineered Plans, Calculations, and Details, and Geotechnical Plan Review and Supplemental Geotechnical Considerations shall be submitted to the City for review by City Staff and the City Geotechnical Consultant prior to issuance of building permits. 14. GEOTECHNICAL CONSTRUCTION INSPECTIONS Prior to final inspections, the City Geotechnical Consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspections shall include, but not necessarily be limited to: site preparation and 30 PC 2-27-2024 30 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 11 grading, site surface and subsurface drainage improvements, and excavations for foundations prior to placement of steel and concrete. The results of these inspections and the as-built conditions of the project shall be described by the City Geotechnical Consultant in a letter and submitted to the City Engineer for review and approval prior to final inspections. 15. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 31 PC 2-27-2024 31 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 12 16. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. BUILDING PERMIT APPLICATION The geotechnical 3rd party review will be deferred to the building permit application stage. Additional comments will be provided during the Building Permit stage. 2. ACCEPTANCE OF PROPERTY RIGHTS The Public Works Director, or his/her designee, shall have the authority to accept all offers of dedications, easements, quitclaims and other property rights and interests on behalf of the City. 3. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the Director of Public Works. All improvements must be completed and accepted by the City prior to Building Final Occupancy or Street Improvement Encroachment Permit acceptance whichever comes first. 4. GRADING A Grading permit and an engineer's cost estimate for grading work will be required during the Building review stage. Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 5. DRAINAGE Drainage shall be provided to the satisfaction of the Director of Public Works and satisfy any requirements from the environmental analysis. Hydrology and pre- and 32 PC 2-27-2024 32 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 13 post-development hydraulic calculations have been provided. The storm drain system may include, but is not limited to, subsurface storage of peak stormwater flows (as needed), bioretention basins, vegetated swales, and hydrodynamic separators to reduce the amount of runoff from the site and improve water quality. The storm drain system shall be designed to detain water on-site (e.g., via buried pipes, retention systems or other approved systems and improvements) as necessary to avoid an increase of the ten percent flood water surface elevation to the satisfaction of the Director of Public Works. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. All storm drain inlets shall be clearly marked with the words “No Dumping – Flows to Creek” using permanently affixed metal medallions or equivalent, as approved by the Environmental Programs Division. Additional comments will be provided and shall be incorporated prior to Building Permit approval. 6. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, transportation impact fees, park dedication fees and fees for under grounding of utilities. Said agreement and fees shall be executed and paid prior to issuance of Building permit. Fees: a. Checking & Inspection Fees: Per current fee schedule ($1,218) b. Grading Permit: Per current fee schedule ($3,683 or 6% of improvement costs) c. Storm Drainage Fee: Per current fee schedule ($4,361 per DU) d. 3rd Party Geotech: Based on actual cost plus 15% admin fee Bonds: On-site Grading Bond: 100% of site improvements. The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 7. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of 33 PC 2-27-2024 33 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 14 Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 8. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 9. NPDES CONSTRUCTION GENERAL PERMIT When and where it is required by the State Water Resources Control Board (SWRCB), the developer must obtain a Notice of Intent (NOI) from the SWRCB, which encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction Best Management Practices (BMPs) to control storm water runoff quality, and BMP inspection and maintenance. 10. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 11. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100’ of a Fire Hydrant). 12. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 13. SAN JOSE WATER SERVICE COMPANY CLEARANCE Provide San Jose Water Service Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 34 PC 2-27-2024 34 of 163 Resolution No. DRAFT EXC-2023-006 February 27, 2024 Page 15 14. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 15. CUPERTINO SANITARY DISTRICT A letter of clearance or sign off of street improvement plans for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 16. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and San Jose Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. PASSED AND ADOPTED this 27th day of February 2024, Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: ATTEST: APPROVED: Piu Ghosh David Fung Planning Manager Chair, Planning Commission 35 PC 2-27-2024 35 of 163 3 A-0.0 Existing Rear Perspective 4 A-0.0 Proposed Rear Perspective 1 A-0.0 Existing Front Perspective 2 A-0.0 Proposed Front Perspective 22777 San Juan RoadCupertino, CA 95014-393 APN: 342-22-104 DRAWING INDEX A-0.0 COVER SHEET + (E) & PROPOSED PERSPECTIVES A-1.0 SITE PLAN, SITE DATA & VICINITY MAP A-2.0 FIRST FLOOR PLAN A-2.1 SECOND FLOOR PLAN A-3.0 ELEVATIONS, EAST & WEST A-3.1 ELEVATIONS, NORTH & SOUTH A-3.2 ELEVATIONS, ENTRY AREA A-3.3 BIRD SAFE GLASS CALCULATION A-4.0 BUILDING SECTIONS E-2.0 1ST FLOOR ELECTRICAL PLAN E-2.1 2ND FLOOR ELECTRICAL PLAN EX-1.0 (E) SITE PLAN EX-2.0 (E) FIRST FLOOR PLAN EX-2.1 (E) SECOND FLOOR PLAN EX-3.0 (E) ELEVATIONS, EAST & WEST EX-3.1 (E) ELEVATIONS, NORTH & SOUTH EX-3.2 (E) ELEVATIONS, ENTRY AREA ArchitectPomodoro Architects, Attn: Christian Pomodoro 6646 Pine Needle Drive, Oakland, CA 94611 Email: chris@pomodoroarchitects.com Phone: 650-691-8345 Web: www.pomodoroarchitects.com Structural EngineerTBD General ContractorTBD Project Team Contact Information Property Owner Venktesh and Abha Shukla 22777 San Juan Road Cupertino, CA, 95014-393 Email: abha@shukla.net Landscape Architect Terra Ferma, Attn: Kate Cannon 139 Mitchell Avenue # 220 So. San Francisco, CA 94080 Email: kate@tflandscapes.com Phone: 650-952-5659 x114 Surveyor & Geotechnical Engineer Lea & Braze Engineering, INC. 2495 Industrial Parkway West Hayward, CA 94545 Phone: 510-887-4086 Web: www.leabraze.com SCOPE OF WORK ● REPLACE (E) PORCH ROOF WITH (N) PORCH ROOF AND DECK ● REPLACE (E) PATIO HARDSCAPE AND TERRACE WITH (N), SEE LANDSCAPE ● REPLACE (E) CONCRETE PORTION OF DRIVEWAY WITH (N), SEE LANDSCAPE ● CHANGE COLOR OF STUCCO EXTERIOR ● REPLACE SOME WINDOWS AND DOORS ● EXTEND BAY WINDOW AND BALCONY ABOVE ● EXTEND MASTER BEDROOM BALCONY ● REMODEL ENTRY AREA WITH (N) STONE FACADE AND (N) TRELLIS ● REPLACE (E) CHIMNEY CAPS WITH (N) ● REMODEL INTERIOR OF FOYER, LIVING, DINING L-0.0 LANDSCAPE COVER L-0.1 GENERAL NOTES L-1.0 TREE PROTECTION PLAN L-1.1 LANDSCPAE PLAN L-1.2 SITE ELEVATIONS L-5.0 LIGHTING PLAN L-5.1 LIGHTING FIXTURES L-5.2 LIGHTING FIXTURES C-1.0 COVER & NOTES C-1.1 TITLE SHEET C-2.0 SITE PLAN & HORZ CTRL PLAN C-2.1 GRADING & DRAINAGE PLAN C-2.2 GRADING & DRAINAGE PLAN C-2.3 SITE SECTION C-3.1 UTILITY PLAN C-3.2 UTILTIY PLAN C-4.0 DETAILS C-4.1 DETAILS C-5.0 GRADING SPECIFICATIONS ER-1 EROSION CONTROL PLAN ER-2 EROSION CONTROL DETAILS SW-1 STORMWATER POLLUTION PREVENTION SU1 SURVEY 2 A-0.0 Cover Sheet, Existing & Proposed Perspectives CAP CAP NOTED AR C H I T E C T U R A L CI V I L Feb 1st, 2023 LA N D S C A P E REVISIONS REMARKSMM/DD/YY POMODORO ARCHITECTS 6646 PINE NEEDLE DRIVE OAKLAND, CA 94611 PHONE: 650-691-8345 WWW.POMODOROARCHITECTS.COM DRAWN BY:CHECKED BY: SCALE: TITLE: DATE: CO P Y R I G H T © P O M O D O R O A R C H I T E C T S - T H I S D O C U M E N T A S A N I N S T R U M E N T O F S E R V I C E I S T H E S O L E P R O P E R T Y O F P O M O D O R O A R C H I T E C T S A N D S H A L L R E M A I N S O W H E T H E R T H E P R O J E C T F O R W H I C H I T I S I N T E N D E D I S O R I S N O T E X E C U T E D . T H I S D O C U M E N T S H A L L N O T B E U S E D I N W H O L E O R I N P A R T O N O T H E R P R O J E C T S O R E X T E N S I O N S O F T H I S P R O J E C T E X C E P T B Y W R I T T E N C O N S E N T O F P O M O D O R O A R C H I T E C T S . REV#REV# Re m o d e l f o r S h u k l a R e s i d e n c e : 22 7 7 7 S a n J u a n R o a d Cu p e r t i n o , C A , 9 5 0 1 4 - 3 9 3 A P N : 3 4 2 - 2 2 - 1 0 4 L I CENSEDATEC T C-34145 H RISTIANA STATEOFCALIFO C 05/31/2025 RCHITEC T CHIIELPOMOD O R R ORNIATERENEWAL DATE 06/06/23 PRELIM CHK UPDATE1 12/15/23 PRELIM CHK UPDATE2 36 PC 2-27-2024 36 of 163 31'-10" (N) D E C K S E T B A C K 1 0 2 ' - 0 " ( E ) D E C K R E A R S E T B A C K 32'-7" (E) D E C K S E T B A C K 32'-7" (E) D E C K S E T B A C K 7 9 ' - 4 " ( N ) D E C K R E A R S E T B A C K 1 0 7 . 1 0 ' 2 A-1.0 Vicinity Map NO SCALE North 124' 30' 2 3 0 ' 87.52' 1 1 7 . 4 0 ' SAN JUAN R O A D (E) ASPHALT DRIVEWAY REPLACE (E) CONCRETE PORTION OF DRIVEWAY WITH (N), SEE LANDSCAPE PLANS (E) ASPHALT DRIVEWAY W/ 4 PARKING SPOTS (E) HOUSE (N) HOT TUB (N) PLANTER (N) ENTERTAINING TERRACE REPLACE (E) PORCH ROOF W/ (N) PORCH ROOF/DECK (N) TERRACE (N) EXT STAIRS REPLACE (E) CONCRETE PORTION OF DRIVEWAY WITH (N), SEE LANDSCAPE PLANS (N) TRELLIS (E) SOLAR (E) SOLAR EXPAND (E) DECK EXPAND (E) DECK LANDS OF SHUKLA APN: 342-22-104 LANDS OF SHUKLA APN: 342-22-105 19 6 . 1 0 ' 153' 21.5' REPLACE (E) ASPHALT SHINGLE ROOF WITH METAL SEAM REMOVE (E) TREES, SEE LANDSCAPE REMOVE (E) TREES, SEE LANDSCAPE SEE LANDSCAPE PLANS 1 0 ' 0 " 1 S T F L R F R N T S E T B A C K 2 5 ' 0 " 2 N D F L R F R O N T S E T B A C K 15' 9" 1ST FLRSETBACK 10'-0" 1ST FLR SIDE SETBACK 15'-0" 2ND FLR SIDE SETBACK 8 0 ' - 2 " S E C O N D F L O O R F R O N T S E T B A C K 44'-4" SEC O N D F L O O R S I D E S E T B A C K 9 " S E C O N D F L O O R R E A R S E T B A C K 16'-0" 2ND FLR S E T B A C K P R O P E R T Y L I N E ROOF DECK TRELLISOPEN OPEN 9 7 ' - 2 " S E C O N D F L O O R R E A R S E T B A C K 1 A-1.0 North Proposed Site Plan Scale: 3/32" = 1'-0" Project North SHADE INDICATES AREAS OF PROPOSED HARDSCAPE AND STRUCTURE IMPROVEMENTS SITE DATA ZONED: RHS-21 LAND USE: Very Low Density (1/2 Acre Slope Density Formula)Allowed/ MIN/MAX EXISTING PROPOSED ADDRESS 22777 San Juan Rd.No Change APN 342 22 104 No Change ZONING RHS-21 No Change LANDUSE Very Low Density (1/2 Acre Slope Density Formula) No Change WATER SERVICE San Jose Water No Change SANITATION SERVICE Cupertino Sanitary District No Change OCCUPANCY CLASSIFICATION - R-3/U No Change TYPE OF CONSTRUCTION - V-B No Change NUMBER OF STORIES -2 No Change NET LOT AREA 20,000 SF MIN 26,817 SF No Change LOT COVERAGE AREA 4,315 SF 4,724 SF LOT COVERAGE BUILDING FOOTPRINT 3,902 SF 3,928 SF LOT COVERAGE ROOF OVERHANGS 360 SF 42 SF LOT COVERAGE BALCONY/DECKS 53 SF 754 SF LOT COVERAGE %16.0%17.6% AVERAGE SLOPE 0.23 No Change SLOPE FACTOR 0.80 No Change BUILDING FLOOR AREA, MAX 5,302 SF MAX 5,010 SF 5,035 SF F.A.R. (MAX)19.7% MAX 18.6%18.7% HEIGHT LIMIT (MAX)30' MAX 29'-3"No Change WALL SETBACKS FRONT SETBACK 1ST FLOOR 10' MIN 40'-9"No Change FRONT SETBACK 2ND FLOOR 25' MIN 81'-6"No Change SOUTH RIGHT SIDE SETBACK 1ST FLOOR 10' MIN 10'-0"No Change SOUTH RIGHT SIDE SETBACK 2ND FLOOR 15' MIN 44'-0"No Change NORTH LEFT SIDE SETBACK 1ST FLOOR 10' MIN 15'-9"No Change NORTH LEFT SIDE SETBACK 2ND FLOOR 15' MIN 17'-2"No Change REAR SETBACK 1ST FLOOR 20' MIN 91'-6"No Change REAR SETBACK 2ND FLOOR 25' MIN 98'-3"No Change 2ND STORY DECK SETBACKS FRONT DECK SETBACK 17' MIN NA No Change SOUTH RIGHT SIDE DECK SETBACK 15' MIN 32'-7"31'-10" NORTH LEFT SIDE DECK SETBACK 15' MIN NA 17'-6" REAR DECK SETBACK 20' MIN 102'-0"79'-4" 3 9 ' - 3 " F I R S T F L O O R F R O N T S E T B A C K 10'-0" 1ST FLR SETBACK 9 2 ' 3 " F I R S T F L O O R R E A R S E T B A C K 2 0 ' - 0 " 1 S T F L R R E A R S E T B A C K 2 5 ' - 0 " 2 N D F L R R E A R S E T B A C K 20'-0" 1 S T FLR R E A R S E T B A C K 2 3/8 " 2 N D FLR R E A R S E T B A C K 10' 0" 1ST F L R SIDE SETB A C K 1 3/8" 2N D FLR SIDE S E T B A C K 2 0 ' - 0 " 1 S T F L R R E A R S E T B A C K 2 5 ' - 0 " 2 N D F L R R E A R S E T B A C K 20'-0" 1 S T FLR R E A R S E T B A C K 25'-0 " 2 N D FLR R E A R S E T B A C K 15' 0" 2ND FLR SIDE S E T B A C K 2 A-1.0 Proposed Site Plan CAP CAP NOTED Feb 1st, 2023 REVISIONS REMARKSMM/DD/YY POMODORO ARCHITECTS 6646 PINE NEEDLE DRIVE OAKLAND, CA 94611 PHONE: 650-691-8345 WWW.POMODOROARCHITECTS.COM DRAWN BY:CHECKED BY: SCALE: TITLE: DATE: CO P Y R I G H T © P O M O D O R O A R C H I T E C T S - T H I S D O C U M E N T A S A N I N S T R U M E N T O F S E R V I C E I S T H E S O L E P R O P E R T Y O F P O M O D O R O A R C H I T E C T S A N D S H A L L R E M A I N S O W H E T H E R T H E P R O J E C T F O R W H I C H I T I S I N T E N D E D I S O R I S N O T E X E C U T E D . T H I S D O C U M E N T S H A L L N O T B E U S E D I N W H O L E O R I N P A R T O N O T H E R P R O J E C T S O R E X T E N S I O N S O F T H I S P R O J E C T E X C E P T B Y W R I T T E N C O N S E N T O F P O M O D O R O A R C H I T E C T S . REV#REV# Re m o d e l f o r S h u k l a R e s i d e n c e : 22 7 7 7 S a n J u a n R o a d Cu p e r t i n o , C A , 9 5 0 1 4 - 3 9 3 A P N : 3 4 2 - 2 2 - 1 0 4 L I CENSEDATEC T C-34145 H RISTIANA STATEOFCALIFO C 05/31/2025 RCHITEC T CHIIELPOMOD O R R ORNIATERENEWAL DATE 06/06/23 PRELIM CHK UPDATE1 12/15/23 PRELIM CHK UPDATE2 37 PC 2-27-2024 37 of 163 38 PC 2-27-2024 38 of 163 600 590 580 570 570 57 0 5 6 0 56 0 58 0 58 0 600 590 59 0 PA PA PA PA PA PA PA PA PA PA PA PA PA PA PAPA PA PA PA PA P R O P E R T Y L I N E RESIDENCE ENTERTAINING TERRACE DINING TERRACE LOUNGE TERRACE LOWER TERRACE ENTRY DRIVEWAY DRIVEWAY PARKING EXISTING LAWN 1 0 ' - 0 " S I D E S E T B A C K PROPER T Y L I N E 20'-0" R E A R S E T B A C K 1 0 ' - 0 " S I D E S E T B A C K P R O P E R T Y L I N E 1 0 ' - 0 " S I D E S E T B A C K PR O P E R T Y L I N E 10 ' - 0 " S I D E S E T B A C K SPA RETAINING WALL (SEE CIVIL PLANS FOR HEIGHT) SPA OVERFLOW BASIN RETAINING WALL (SEE CIVIL PLANS FOR HEIGHT) RETAINING WALL (SEE CIVIL PLANS FOR HEIGHT) DRYSTACK STONE RETAINING WALL (SEE CIVIL PLANS FOR HEIGHT) GRAVEL PATHWAY POOL EQUIPMENT SCULPTURE FIRE TABLE WITH SEATING DRYSTACK STONE RETAINING WALL (SEE CIVIL PLANS FOR HEIGHT) GRAVEL PAVING RETAINING WALL (SEE CIVIL PLANS FOR HEIGHT) FREESTANDING HAMMOCK FLAGSTONE PAVING STONE PAVING GRAVEL PATHWAY WITH STONE STAIRS CONCRETE WITH SYNTHETIC GRASS JOINT EXISTING DRIVEWAY WALL WATER FEATURE OUTDOOR KITCHEN WITH GRILL, SINK AND BAR SEATING GRAVEL PAVING EXISTING TREE TO REMAIN PA PA FIRE TABLE WITH SEATING 20'-0" FR O N T S E T B A C K / 4 0 ' - 0 " R A O D W A Y E A S E M E N T (E) HEDGE TO REMAIN SCULPTURE PA STONE STAIRS WITH HANDRAIL STONE BANDING FOR GRAVEL PAVING DATE: 06/06/23 DRAWN BY: JA/KC CHECKED BY: EB SCALE: PROJECT #: 2114 22 7 7 7 S A N J U A N R O A D CU P E R T I N O , C A 9 5 0 1 4 Renewal Date Signature 06/30/24 L S L A N D CAPE A RC H I T E C TICENSED Date W. B R I A N K O C H N o. L A 5 5 1 6 S T A T E OF CA L I F O R N I A06/06/23 DATE: TITLE SHEET NO. 139 Mitchell Avenue, Suite 220 So. San Francisco, CA 94080 p: 650.952.5659 f : 650.952.0667 e: info@tflandscapes.com Landscape Architecture Landscape Construction Fine Gardening SH U K L A R E S I D E N C E Th e l i m i t o f p r o f e s s i o n a l l i a b i l i t y f o r t h i s p r o j e c t s h a l l b e l i m i t e d t o a n a m o u n t eq u a l t o t h e f e e p a i d o r a l l w o r k p e r f o r m e d b y T e r r a F e r m a L a n d s c a p e s , I n c . REVISIONS: AP N : 3 4 2 - 2 2 - 1 0 4 ISSUED FOR:#: PERMIT SET 1"=10'-0" LANDSCAPE PLAN L1.1 NORTH SCALE: 0 5 10 20 1"=10'-0" 39 PC 2-27-2024 39 of 163 40 PC 2-27-2024 40 of 163 41 PC 2-27-2024 41 of 163 42 PC 2-27-2024 42 of 163 43 PC 2-27-2024 43 of 163 44 PC 2-27-2024 44 of 163 45 PC 2-27-2024 45 of 163 CITY OF CUPERTINO Agenda Item 24-12985 Agenda Date: 2/27/2024 Agenda #: 3. Subject: 2023 General Plan and Housing Element Annual Progress Reports (APR). Receive the General Plan and Housing Element APRs. CITY OF CUPERTINO Printed on 2/23/2024Page 1 of 1 powered by Legistar™46 PC 2-27-2024 46 of 163 PLANNING COMMISSION STAFF REPORT Meeting: February 27, 2024 Subject 2023 General Plan and Housing Element Annual Progress Report (APR) Recommended Action Receive the General Plan and Housing Element APRs. Discussion Background: State law (Government Code Section 65400) requires that the City provide an annual report, on or before April 1 of each year, to the legislative body (the City Council in the case of Cupertino) regarding the status of the General Plan and progress in its implementation, including meeting its share of regional housing needs, and local efforts to remove governmental constraints to the maintenance, improvement, and development of housing. The report must also be sent to the Office of Planning and Research and Department of Housing and Community Development (HCD). See Government Code § 65400(a)(2)(A)-(J). In March 2023, the General Plan and Housing Element APRs were presented to the City Council in compliance with State law and past practice. Councilmembers did not have any substantial comments on the report. Analysis: General Plan Annual Report The current General Plan APR format has been used for the past several years. The Policies and Strategies that support the General Plan Goals in each Element are arranged in tabular form as the APR (See Attachment 1). Most Strategies and Policies are implemented on an ongoing process through the Municipal Code and through development project review and are identified in the APR. The purpose of this meeting is to allow the Planning Commission to receive the General Plan APR. Edits have been made to all sections of the report to reflect the work done by City staff in COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 47 PC 2-27-2024 47 of 163 implementing General Plan policies and strategies. These edits are reflected in the attached document in bold and underlined text. In addition to the review of Planning Permits and building permits, Planning staff has responded to over 1,300 public counter inquiries in person, over 150 virtual appointments inquiries and over 1,000 email inquiries from members of the public, the City’s Planning staff also worked on Municipal Code amendments in 2023, which were adopted by Council in February 2024, related to Accessory Dwelling Units (ADUs) and clarifying the process to allow certain uses in the BA zoning district. Staff has also continued to tackle preparation of the Housing Element and associated amendments to implementing documents. Housing Element APR The Housing Element APR must be completed on forms provided by HCD. Pursuant to Government Code Section 65400, local governments must provide, each year, an annual report for the previous calendar year to the legislative body (City Council), OPR, and HCD. HCD prepares the form template that cities must submit to comply with these statutory requirements in advance of the April 1, 2024, deadline. In past years, the report focused on building permits issued for new housing units by affordability. Since 2018, and every year after that, various state laws have expanded reporting requirements related to housing development projects, e.g. SB 35, state density bonus law and SB 330. In recent years, in addition to data that has historically been requested, additional data is requested including but not limited to: address and APN of projects, date application is deemed complete, date of entitlement approval, date of issuance of permits, date certificate of occupancies were granted, use of density bonus law, which portions of the density bonus law are being utilized and what standards are being requested to be waived, incentives that are being requested, and use of other state law provisions (such as SB35, AB2011, SB330, SB9 etc.). All required data and progress in implementing existing Housing Element policies and strategies has been reported on the requisite forms and will be submitted to HCD prior to April 1 as required by state law (See Attachment 2). The tables on the following page summarize the Regional Housing Needs Analysis (RHNA) Generation by Developers (i.e. Building Permits issued in 2023) (see Table 1) and the Project Entitlements by City in 2023 (see Table 2). 48 PC 2-27-2024 48 of 163 TABLE 1: BUILDING PERMITS ISSUED BY INCOME CATEGORY BETWEEN 2023 AND 2031 Extremely Low/ Very Low (0-50% of AMI) Low (51-80% of AMI) Moderate (81-120% of AMI) Above Moderate (over 120% AMI) Total Units Projected Need (RHNA) 1,193 687 755 1,953 4,588 Net New Units Entitled by City (Not Produced) 271 624 46 2,127 3,062 Building Permits Applied for By Developers and Issued by City 2023 10 10 29 128 177 Total RHNA Production 10 10 29 128 177 Balance 1,183 677 726 1,869 4,455 TABLE 2: PROJECT ENTITLEMENTS APPROVED BY INCOME CATEGORY BETWEEN 2023 AND 2031 Extremely Low/ Very Low (0-50% of AMI) Low (51-80% of AMI) Moderate (81-120% of AMI) Above Moderate (over 120% AMI) Total Net New Units Projected Need (RHNA) 1,193 687 755 1,953 4,588 Total Building Permits Issued 10 10 29 128 177 RHNA balance 1,183 677 726 1,869 4,455 Projects Entitled by City * (Not Yet Produced) Westport (The Oaks) – BP under review - - - 123 123 The Rise (Vallco) 267 623 - 1,779 2,669 Canyon Crossing 1 - 2 15 18 McClellan subdivision – BP under review - - 6 5** 5 Marina Plaza 2.0 - - 36 170 206 Coach House/1655 S. De Anza 3 1 1 29 34 Bianchi Townhomes - - 1 2** 3 Total Projects Entitled by City 271 624 46 2,127 3,058 RHNA Balance*** (if BPs were applied for and issued for all entitled projects) 912 53 680 0 1,397 * The City has approved the Hamptons project with 7 LI, 30 Mod, and 563 Above-Mod units for a total of 600 units. These are not reflected in these totals. ** The McClellan Project is a 6 lot subdivision with 6 ADUs. However, it involved the demolition of 1 existing unit. The Bianchi Project (7 Townhomes) involved the demolition of 4 existing units. *** Balance cannot be less than zero and cannot be applied to other income levels if there is excess production in any one income level. 49 PC 2-27-2024 49 of 163 In addition to the data collected by HCD, HCD requires an update on the activity conducted in the implementation of the Housing Policies and Strategies in the General Plan. This is reflected in both Attachment 1 and Attachment 2 (Table D). The City continues to support the production of housing, particularly affordable housing by providing technical support, and guidance. The City continues to allocate Community Development Block Group (CDBG) federal funds and Human Service Grant (HSG) funds to eligible and deserving projects. It also continues to implement its local Below Market Rate (BMR) Housing Program and the Non-residential BMR program. The funds received are collected in the City’s BMR Affordable Housing Fund (AHF) and expended on eligible projects with City Council authorization. Next Steps These APRs will be presented to City Council in March 2024. _______________________________________________________________________ Prepared by: Piu Ghosh, Planning Manager Alec Vybiral, Housing Coordinator Reviewed and Approved for Submission by: Luke Connolly, Acting Director of Community Development Attachments: 1. Draft 2021 General Plan Annual Progress Report 2. Draft HCD Annual Progress Report 50 PC 2-27-2024 50 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment BALANCED COMMUNITY Policy LU‐1.1 Land Use and Transportation The City shall focus higher land use intensities and densities within half–mile of public transit service, and along major corridors. Figure LU‐2 indiciates the maximum residential densities for sites that allow residential land uses. Community Development – Planning General Fund Con. Not an action item. Public Transit Service does not include rideshare services such as VIA, Lyft and Uber. BALANCED COMMUNITY Policy LU‐1.2 Development Allocation Maintain and update the development allocation table (Table LU‐1) to ensure that the allocations for various land uses adequately meet city goals. Community Development – Planning General Fund Con. Not an action item. The General Plan amended in Sept. 2019 to eliminate office allocation and complete all rezoning required to comply with the Housing Element. No changes to allocation were made in 2020, 2021, or 2022 or 2023. BALANCED COMMUNITY Strategy LU‐ 1.2.1 Planning Area Allocations Development allocations are assigned for various Planning Areas. However, some flexibility may be allowed for transferring allocations among Planning Areas provided no significant environmental impacts are identified beyond those already studied in the Environmental Impact Report (EIR) for Community Vision 2040. Community Development – Planning General Fund Con.Not an action item.Employee generation for office uses is assigned at 300 s.f./employee in the GP EIR certified in 2014; BALANCED COMMUNITY Strategy LU‐ 1.2.2 Major Employers Reserve a development allocation for major companies with sales office and corporate headquarters in Cupertino. Prioritize expansion of office space for existing major companies. New office development must demonstrate that the development positively contributes to the fiscal well–being of the city. Community Development – Planning General Fund Con. Not an action item. Important to note that residential allocation may need to be eliminated due to limitations of state law with Housing Element update in 2024. The available allocations as of 12/31/2023 are as follows: 1. Heart of the City: Commercial: 834,280 s.f.; Office: 17,113 s.f.; Hotel Rooms: 122; Residential: 11 2. Vallco Shopping District: Commercial:1,381,388 s.f.; Office: 45,387 s.f.; Hotel Rooms: 191 3. Homestead: Commercial ‐ 1,093 s.f.; Residential: 150 4. N. De Anza: Residential: 97 5. N. Vallco: None 6. S. De Anza: Commercial ‐ 4,035 s.f. 7. Bubb: None 8. Monta Vista: Commercial: 4,657 s.f.; Office: 13,595 s.f.; Residential: 47 9. Other: Commercial: 11,225 s.f.; Residential: 38 10. Major Employers: Office: 383,322 s.f. BALANCED COMMUNITY Strategy LU‐ 1.2.3 Unused Development Allocation Unused development allocations may be re–assigned to the citywide allocation table per Planning Area, when development agreements and development permits expire. Community Development – Planning General Fund Con. Not an action item. This is routinely done as projects expire. BALANCED COMMUNITY Strategy LU‐ 1.2.4 Neighborhood Allocation Allocate residential units in neighborhoods through the building permit process unless subdivision or development applications are required. Community Development – Planning General Fund Con. Not an action item. This is routinely done with project review. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con51 PC 2-27-2024 51 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment BALANCED COMMUNITY Policy LU‐1.3 Land Use in All Citywide Mixed–Use Districts Encourage land uses that support the activity and character of mixed–use districts and economic goals.Community Development – Planning General Fund Con. Not an action item. Information provided as and when applicants/property owners approach city BALANCED COMMUNITY Strategy LU‐ 1.3.1 Commercial and Residential Uses Review the placement of commercial and residential uses based on the following criteria: 1. All mixed–use areas with commercial zoning will require retail as a substantial component. The North De Anza Special Area is an exception. 2. All mixed–use residential projects should be designed on the “mixed–use village” concept discussed earlier in this Element. 3. On sites with a mixed–use residential designation, residential is a permitted use only on Housing Element sites and in the Monta Vista Village Special Area. 4. Conditional use permits will be required on mixed–use Housing Element sites that propose units above the allocation in the Housing Element, and on non–Housing Element mixed–use sites. Community Development – Planning General Fund Con. Not an action item. This is reviewed with project review. Consider capturing changes to state law in the future. May be updated with updates to the Housing Element in 2024. BALANCED COMMUNITY Strategy LU‐ 1.3.2 Public and Quasi–Public Uses Review the placement of public and quasi–public activities in limited areas in mixed–use commercial and office zones when the following criteria are met: 1. The proposed use is generally in keeping with the goals for the Planning Area, has similar patterns of traffic, population or circulation of uses with the area and does not disrupt the operation of existing uses. 2. The building form is similar to buildings in the area (commercial or office forms). In commercial areas, the building should maintain a commercial interface by providing retail activity, storefront appearance or other design considerations in keeping with the goals of the Planning Area. Community Development – Planning General Fund Con. Not an action item. Information provided as and when applicants/property owners approach city and reviewed in conjunction with discretionary project review/approval+Q13 BALANCED COMMUNITY Policy LU‐1.4 Parcel Assembly Encourage parcel assembly and discourage parcelization to ensure that infill development meets City standards and provides adequate buffers to neighborhoods. Community Development – Planning General Fund Con. Not an action item. The Council adopted an urgency ordinance to allow parcelization and the development of duplex developments in single family zoning areas on 12/21/2021. A regular ordinance was presented to the Planning Commission on 9/27/2022 and to the City Council on 11/1/2022. The second reading was conducted on 11/15/2022. Pending state legislation may require changes to these regulations in 2024/2025. BALANCED COMMUNITY Policy LU‐1.5 Community Health Through Land Use Promote community health through land use and design.Community Development – Planning General Fund, Grants IM In late 2019, Council adopted new limits on storefront signage advertising tobacco sales and a ban on: * Flavored tobacco sales, * New tobacco retailers within 1,000 feet of a school or 500 feet of an existing tobacco retailer, * sales at pharmacies and vending machines. The Council adopted a ban on all vaping products and smoking in multifamily developments in June 2021. BALANCED COMMUNITY Policy LU‐1.6 Jobs/Housing Balance Strive for a more balanced ratio of jobs and housing units.Community Development – Planning General Fund, Grants Con. Not an action item. The General Plan amended in September 2019 to eliminate office allocation and complete all rezoning to comply with Housing Element. Worthy for the City to strive to ʺseek a balanceʺ as opposed to using a numerical ʺratio.ʺ The City is in the process of developing the 6th Cycle Housing Element to identify sites that can accommodate its fair share of regional housing needs. Anticipated adoption of Housing Element and required rezoning by Spring 2024. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con52 PC 2-27-2024 52 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment COMMUNITY IDENTITY Policy LU‐2.1 Gateways Implement a gateway plan for the City’s entry points (Figure LU–1) and identify locations and design guidelines for gateway features. Look for opportunities to reflect the gateway concept when properties adjacent to defined gateways are redeveloped. Public Works – Engineering and Transportation General Fund, Development fees Con. No action is needed at this time. Gateway signs are installed through the Capital Improvements Project or through development review. COMMUNITY IDENTITY Policy LU‐2.2 Pedestrian–Oriented Public Spaces Require development to incorporate pedestrian–scaled elements along the street and within the development such as parks, plazas, active uses along the street, active uses, entries, outdoor dining and public art. Community Development – Planning General Fund, Development fees Con. Not an action item. SITE AND BUILDING DESIGN Policy LU‐3.1 Site Planning Ensure that project sites are planned appropriately to create a network of connected internal street that improve pedestrian and bicycle access, provide public open space and building layouts that support city goals related to streetscape character for various Planning Areas and corridors. Community Development – Planning; Public Works – Development Services and Transportation General Fund, Development Fees Con. Not an action item. SITE AND BUILDING DESIGN Policy LU‐3.2 Building Heights and Setback Ratios Maximum heights and setback ratios are specified in the Community Form Diagram (Figure LU–2). As indicated in the figure, taller heights are focused on major corridors, gateways and nodes. Setback ratios are established to ensure that the desired relationship of buildings to the street is achieved. Community Development – Planning General Fund, Development Fees Con.Not an action item. The City adopted minor changes to Figure LU‐2 to clarify language in October 2021. SITE AND BUILDING DESIGN Policy LU‐3.3 Building Design Ensure that building layouts and design are compatible with the surrounding environment and enhance the streetscape and pedestrian activity. Community Development – Planning General Fund, Development Fees IM Not an action item. Reviewed in conjunction with discretionary project review/approval. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.1 Attractive Design Emphasize attractive building and site design by paying careful attention to building scale, mass, placement, architecture, materials, landscaping, screening of equipment, loading areas, signage and other design considerations. Community Development – Planning General Fund, Development Fees IM Not an action item. Reviewed in conjunction with discretionary project review/approval. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.2 Mass and Scale Ensure that the scale and interrelationships of new and old development complement each other. Buildings should be grouped to create a feeling of spatial utility. Community Development – Planning General Fund, Development Fees IM Not an action item. Currently implemented via the discretionary design review process, Municipal Code and Specific Plans. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.3 Transitions Buildings should be designed to avoid abrupt transitions with existing development, whether they are adjacent or across the street. Consider reduced heights, buffers and/or landscaping to transition to residential and/or low–intensity uses in order to reduce visual and privacy impacts. Community Development – Planning General Fund, Development Fees IM Not an action item. Currently implemented via the discretionary design review process, Municipal Code and Specific Plans. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.4 Compatibility Ensure that the floor area ratios of multi–family residential developments are compatible with buildings in the surrounding area. Include a mix of unit types and avoid excessively large units. Community Development – Planning General Fund, Development Fees IM Work Program related to a study session on development standards for Mixed Use developments underway. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.5 Building Location Encourage building location and entries closer to the street while meeting appropriate landscaping and setback requirements. Community Development – Planning General Fund, Development Fees IM Not an action item. Currently implemented via the discretionary design review process, Municipal Code and Specific Plans. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con53 PC 2-27-2024 53 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment SITE AND BUILDING DESIGN Strategy LU‐ 3.3.6 Architecture and Articulation Promote high–quality architecture, appropriate building articulation and use of special materials and architectural detailing to enhance visual interest. Community Development – Planning General Fund, Development Fees IM Not an action item. Reviewed in conjunction with project review/approval. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.7 Street Interface Ensure development enhances pedestrian activity by providing active uses within mixed–use areas and appropriate design features within residential areas along a majority of the buildng frontage facing the street. Mixed–use development should include retail, restaurant, outdoor dining, main entries, etc. Residential development should include main entrances, lobbies, front stoops and porches, open space and other similar features. Community Development – Planning General Fund, Development Fees IM Not an action item. Reviewed in conjunction with project review/ approval. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.8 Drive–up Services Allow drive–up service facility only when adequate circulation, parking, noise control, architectural features and landscaping are compatible with the expectations of the Planning Area, and when residential areas are visually buffered. Prohibit drive–up services in areas where pedestrian–oriented activity and design are highly encouraged, such as Heart of the City, North De Anza Boulevard, Monta Vista Village and neighborhood centers. Community Development – Planning General Fund, Development Fees Con. Not an action item. Information provided upon request. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.9 Specific and Conceptual Plans Maintain and update Specific/Conceptual plans and design guidelines for Special Areas such as Heart of the City, Crossroads, Homestead Corridor, Vallco Shopping District, North and South De Anza corridors and Monta Vista Village. Community Development – Planning General Fund IM Update undertaken when directed to at Council discretion as part of Work Program. Plans implemented through project review/approval. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.10 Entrances In multi–family projects where residential uses may front on streets, require pedestrian–scaled elements such as entries, stoops and porches along the street. Community Development – Planning Development Fees IM Not an action item. Reviewed in conjunction with project review/ approval. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. SITE AND BUILDING DESIGN Strategy LU‐ 3.3.11 Multiple–Story Buildings and Residential Districts Allow construction of multiple–story buildings if it is found that nearby residential districts will not suffer from privacy intrusion or be overwhelmed by the scale of a building or group of buildings. Community Development – Planning Development Fees IM Not an action item. Reviewed in conjunction with project review/ approval. Work Program item for objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. STREETSCAPE DESIGN Policy LU‐4.1 Street and Sidewalks Ensure that the design of streets, sidewalks and pedestrian and bicycle amenities are consistent with the vision for each Planning Area and Complete Streets policies. Community Development – Planning General Fund, Development Fees Con. Not an action item. Ongoing implemention via land use plan streetscape requirements (Heart of the City, N. De Anza, Monta Vista Design Guidelines etc.) STREETSCAPE DESIGN Policy LU‐4.2 Street Trees and Landscaping Ensure that tree planting and landscaping along streets visually enhances the streetscape and is consistent for the vision for each Planning Area (Special Areas and Neighborhoods): 1. Maximize street tree planting along arterial street frontages between buildings and/or parking lots. 2. Provide enhanced landscaping at the corners of all arterial intersections. 3. Enhance major arterials and connectors with landscaped medians to enhance their visual character and serve as traffic calming devices. 4. Develop uniform tree planting plans for arterials, connectors and neighborhood streets consistent with the vision for the Planning Area. 5. Landscape urban areas with formal planting arrangements. Provide a transition to rural and semi–rural areas in the City, generally west of Highway 85. Public Works – Service Center General Fund, Development Fees Con. Not an action item. Ongoing implemention via land use plan streetscape requirements (Heart of the City, N. De Anza, Monta Vista Design Guidelines etc.) and via Public Works policies related to street tree planting. CONNECTIVITY Policy LU‐5.1 Neighborhood Centers Retain and enhance local neighborhood shopping centers and improve pedestrian and bicycle access to neighborhoods to improve access to goods and services. Community Development – Planning General Fund, Development Fees Con. Not an action item. Information provided as and when applicants/property owners approach city and reviewed in conjunction with discretionary project review/approval Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con54 PC 2-27-2024 54 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment CONNECTIVITY Policy LU‐5.2 Mixed–Use Villages Where housing is allowed along major corridors or neighborhood commercial areas, development should promote mixed–use villages with active ground–floor uses and public space. The development should help create an inviting pedestrian environment and activity center that can serve adjoining neighborhoods and businesses. Community Development – Planning General Fund, Development Fees Con. Not an action item. Reviewed in conjunction with project review/approval and applicable land use plans (Heart of the City etc.) Work Program item related to objective design guidelines underway. Anticipated adoption of objective design standards in late Fall 2024. CONNECTIVITY Policy LU‐5.3 Enhance Connections Look for opportunities to enhance publicly–accessible pedestrian and bicycle connections with new development or redevelopment. Community Development – Planning; Public Works – Development Services and Transportation. General Fund, Development Fees Con.Not an action item. Reviewed in conjunction with project review/ approval. HISTORIC PRESERVATION Policy LU‐6.1 Historic Preservation Maintain and update an inventory of historically significant structures and sites in order to protect resources and promote awareness of the city’s history in the following four categories: Historic Sites, Commemorative Sites, Community Landmarks, and Historic Mention sites (Figure LU–3). Community Development – Planning General Fund Con.Not an action item. Inventory completed. Maintained in General Plan. HISTORIC PRESERVATION Policy LU‐6.2 Historic Sites Projects on Historic Sites shall meet the Secretary of Interior Standards for Treatment of Historic Properties. Community Development – Planning, Community Development – Building General Fund, Development Fees Con.Not an action item. Reviewed in conjunction with project review/approval. HISTORIC PRESERVATION Policy LU‐6.3 Historic Sites, Commemorative Sies and Community Landmarks Projects on Historic Sites, Commemorative Sites and Community Landmarks shall provide a plaque, reader board and/or other educational tools on the site to explain the historic significance of the resource. The plaque shall include the city seal, name of resource, date it was built, a written description and photograph. The plaque shall be placed in a location where the public can view the information. Community Development – Planning, Community Development – Building General Fund, Development Fees Con.Not an action item. Reviewed in conjunction with project review/approval. HISTORIC PRESERVATION Policy LU‐6.4 Public Access Coordinate with property owners of public and quasi–public sites to allow public access of Historic and Commemorative Sites to foster public awareness and education. Private property owners will be highly encouraged, but not required, to provide public access to Historic and Commemorative Sites. Community Development – Planning, Public Works – Development Services and Transportation General Fund, Development Fees Con.Not an action item. Reviewed in conjunction with project review/approval. HISTORIC PRESERVATION Policy LU‐6.5 Historic Mention Sites There are sites outside the City’s jurisdiction that have contributed to the City’s history. Work with agencies that have jurisdiction over the historical resource to encourage adaptive reuse and rehabilitation and provide public access and plaques to foster public awareness and education. City Manager General Fund Con. Not an action item. When opportunities arise, provide comments to neighboring agencies regarding this. HISTORIC PRESERVATION Policy LU‐6.6 Incentives for Preservation of Historic Resources Utilize a variety of techniques to serve as incentives to foster the preservation and rehabilitation of Historic Resources including: 1. Allow flexible interpretation of the zoning ordinance not essential to public health and safety. This could include land use, parking requirements and/or setback requirements. 2. Use the California Historical Building Codes standards for rehabilitation of historic structures. 3. Tax rebates (Mills Act or Local tax rebates). 4. Financial incentives such as grants/loans to assist rehabilitation efforts. Community Development – Planning, Community Development – Building; Parks and Recreation – Park Improvement; Public Works – Capital Improvements General Fund, Development Fees Con.Not an action item. Information provided when a project applicant/property information proposes a project. HISTORIC PRESERVATION Policy LU‐6.7 Heritage Trees Protect and maintain the city’s heritage trees in a healthy state. Community Development – Planning, Public Works – Service Center General Fund, Development Fees Con. Not an action item. Ongoing implemention via Strategies LU‐ 6.7.1 and project review by the Planning Division. Heritage trees within public property maintained by the Street Tree Division. An update of the tree list is part of the Cityʹs current Work Program. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con55 PC 2-27-2024 55 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HISTORIC PRESERVATION Strategy LU‐ 6.7.1 Heritage Tree List Establish and periodically revise a heritage tree list that includes trees of importance to the community.Community Development – Planning General Fund Con. Not an action item. List maintained by the GIS division and available on the Cityʹs GIS portal with support provided by the Planning Division. Heritage Tree list may need to be updated to remove several trees removed over the years due to disease/natural causes. HISTORIC PRESERVATION Policy LU‐6.8 Cultural Resources Promote education related to the City’s history through public art in public and private developments. Community Development – Planning, Public Works – Capital Improvements General Fund, Development Fees Con. Not an action item. Ongoing implementation via public art review/approval by the Arts and Culture Commission (ACC). The ACC has reviewed 3 public art project in 2023 and continues to implement their programs, such as the Distinguished Artist, Emerging Artist and Young Artist Awards and Art in Unexpected Places. ARTS AND CULTURE Policy LU‐7.1 Public Art Stimulate opportunities for the arts through development and cooperation with agencies and the business community. Community Development – Planning General Fund Con. Not an action item. Ongoing implementation via public art review/approval by the Fine Arts Commission in compliance with the Municipal Code. ARTS AND CULTURE Strategy LU‐ 7.1.1 Public Art Ordinance Maintain and update an ordinance requiring public art in public as well as private projects of a certain size. Community Development – Planning General Fund IM Ordinance update completed in 2018. Ongoing implementation via project review/ approval. ARTS AND CULTURE Strategy LU‐ 7.1.2 Gateways Promote placement of visible artwork in gateways to the city. Public Works – Capital Improvements and Development Services; Community Development – Planning General Fund Con. Not an action item. Ongoing implementation via project review/approval. ARTS AND CULTURE Strategy LU‐ 7.1.3 Artist Workplace Encourage the development of artist workspace, such as live/work units, in appropriate location in the city. Community Development – Planning General Fund Con. Not an action item. Ongoing implementation via project review/ approval. One live/work project approved on Foothill Blvd in 2015. Updated Housing Element might consider live/work arrangements on some housing sites along major corridors. FISCAL STABILITY Policy LU‐8.1 Fiscal Impacts Evaluate fiscal impacts of converting office/commercial ues to residential use, while ensuring that the City meets regional housing requirements. Community Development – Planning General Fund, Development Fees Con.Not an action item. Ongoing implementation via project review/approval. FISCAL STABILITY Policy LU‐8.2 Land Use Encourage land uses that generate City revenue. City Manager – Economic Development; Community Development – Planning; General Fund, Development Fees Con. Not an action item. Ongoing implementation via discretionary project review/approval. Present revenue generation by land use with project review. FISCAL STABILITY Strategy LU‐ 8.2.1 Fiscal Impacts Evaluate fiscal impacts of converting office/commercial uses to residential use, while ensuring that the City meets regional housing requirements. Community Development – Planning General Fund, Development Fees Con.Not an action item. Ongoing implementation via project review/approval. FISCAL STABILITY Policy LU‐8.3 Incentives for Reinvestment Provide incentives for reinvestment in existing, older commercial areas.City Manager – Economic Development General Fund LR No action has been taken/directed by the City Council regarding this item. FISCAL STABILITY Strategy LU‐ 8.3.1 Mixed Use Consider mixed–use (office, commercial, residential) in certain commercial areas to encourage reinvestment and revitalization of sales–tax producing uses, when reviewing sites for regional housing requirements. Community Development – Planning; City Manager – Economic Development General Fund Con. Not an action item. Will be reviewed in conjunction with Housing Element update. Zoning for Housing Elmeent sites is being considered with this lens. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con56 PC 2-27-2024 56 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment FISCAL STABILITY Strategy LU‐ 8.3.2 Shared or Reduced Parking Consider shared or reduced parking, where appropriate as incentives to construct new commercial and mixed–use development, while increasing opportunities for other modes of transportation. Community Development – Planning General Fund, Development Fees Con. Not an action item. The Municipal Code has shared parking standards which are implemented during project review (implementation of Transportation Demand Management strategies via environmental review). Revisions to housing development parking standards necessary upon adoption of the Cityʹs 6th Cycle Housing Element. FISCAL STABILITY Strategy LU‐ 8.3.3 Infrastructure and Streetscape Improvements Consider infrastructure and streetscape improvements in areas, such as the Crossroads or South Vallco area to encourage redevelopment as a pedestrian–oriented area that meets community design goals. Community Development – Planning; Public Works – Development Services, Capital Improvements and Service Center General Fund Con. Not an action item. Implemented via the Capital Improvement Program at the Councilʹs discretion/direction. FISCAL STABILITY Strategy LU‐ 8.3.4 High Sales–Tax Producing Retail Use Consider locations for high sales–tax producing retail uses (such as life–style and hybrid commodity–specialty centers) provided the development is compatible with the surrounding area in terms of building scale and traffic. City Manager – Economic Development General Fund LR Continuing implementation. Several attempts have been made to identify a suitable location for a Costco. However, one has not been identifiedby engaging with commercial property owners and commercial brokers as well as attend regional attraction events hosted by International Council of Shopping Centers (ICSC).. FISCAL STABILITY Policy LU‐8.4 Property Acquisition Maximize revenue from City–owned land and resources, and ensure that the City’s land acquisition strategy is balanced with revenues. City Manager ‐ Economic Development; Public Works – Development Services and Capital Improvements General Fund Con. Ongoing implementation by annual review of fees and services provided. Cost benefit analysis of land acquisition is provided to City Council for its decisions. City Council acted to surplus 10301 Byrne Ave and directed the City Manager to City Manager to offer the Property for sale subsequent to completion of the requirements of the Surplus Land Act. FISCAL STABILITY Policy LU‐8.5 Efficient Operations Plan land use and design projects to allow the City to maintain efficient operations in the delivery of services including, community centers, parks, roads, and storm drainage, and other infrastructure. Community Development – Planning General Fund Con. Not an action item. Will be reviewed at the next Housing Element update and ongoing implementation via project review/approval. ECONOMIC DEVELOPMENT Policy LU‐9.1 Collaboration With Business Community Collaborate with the business community to facilitate growth, development and infrastructure improvements that benefit residents and businesses. City Manager – Economic Development General Fund Con. Ongoing implementation via partnerships with AppleChamber of Commerce and other businesses in Cupertino. Apple contributed ~$9.8 million for bicycle improvements in the City in 2019. ECONOMIC DEVELOPMENT Strategy LU‐ 9.1.1 Economic Development Strategy Plan Create and periodically update an Economic Development Strategy Plan in order to ensure the City’s long–term fiscal health and stability and to make Cupertino an attractive place to live, work and play. City Manager – Economic Development General Fund IM A new Economic Development Strategic Plan will be developed for implementation in FY 22‐23. Local economy market analysis will begin this fiscal year and will serve as the foundation for the Strategy. No Council direction to adopt an Economic Development Strategy Plan. ECONOMIC DEVELOPMENT Strategy LU‐ 9.1.2 Partnerships Create partnerships between the City and other public, and private and non–profit organizations to provide improvements and services that benefit the community.City Manager General Fund Con. Ongoing implementation. Small Business Saturday is a recent example of the first‐ever partnership between the City, Chamber and Cupertino Library to bring attention to the benefits of small businesses in the communtiy.Ongoing implementation via partnerships with Chamber of Commerce and businesses in Cupertino. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con57 PC 2-27-2024 57 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment ECONOMIC DEVELOPMENT Strategy LU‐ 9.1.3 Economic Development and Business Retention Encourage new businesses and retain existing businesses that provide local shopping and services, add to municipal revenues, contribute to economic vitality and enhance the City’s physical environment. City Manager – Economic Development General Fund Con. Ongoing implementation via continuous dialogue with the business community, strengthening exisitng partnerships and froming new ones, as well as outreach and engagement. Ongoing implementation via the Cupertino Business Outreach Program (CBOP). ECONOMIC DEVELOPMENT Strategy LU‐ 9.1.4 Regulations Periodically review and update land use and zoning requirements for retail, commercial and office development in order to attract high–quality sales–tax producing businesses and services, while adapting to the fast–changing retail, commercial and office environment. City Manager ‐ Economic Development; Community Development – Planning General Fund Con. Ongoing implementation via the Cityʹs Work Progam at the Councilʹs direction/discretion. It is not in the current Cityʹs Work Program. ECONOMIC DEVELOPMENT Strategy LU‐ 9.1.5 Incubator Work Space Encourage the development of flexible and affordable incubator work space for start–ups and new and emerging technologies. Community Development – Planning and City Manager – Economic Development General Fund Con. Ongoing implementation via discretionary project review/approval. Ongoing implementation via Cupertino Business Connect, an online hub designed to serve as a one stop platform for small businesses to connect with service providers in Cupertino and the region. ECONOMIC DEVELOPMENT Strategy LU‐ 9.1.6 Development Review Provide efficient and timely review of development proposals, while maintaining quality standards in accordance with city codes. Look for a solution–based approach to problems while being responsive to community concerns while promote positive communication among parties. Community Development – Planning and Building General Fund, Development Fees Con.Not an action item. Ongoing implementation via project review/approval and building plan check. ECONOMIC DEVELOPMENT Policy LU‐9.2 Work Environment Encourage the design of projects to take into account the well–being and health of employees and the fast–changing work environment. Community Development – Planning and Building, Public Works – Transportation General Fund Con. Public Works is implementing elements of the pedestrian and bicycle master plans to promote healthier alternative forms of transportation. Regnart Creek Pedstrian and Bicycle Trail completed in 2023. Intersection improvements at De Anza Blvd. and McClellan Road (McClellan Bikeway Phase 3) designed in 2023, to begin construction in January 2024. This project enhance pedestrian and bicycle safety. De Anza Blvd Buffered Bike Lane project to be initiated in Summer 2024. ECONOMIC DEVELOPMENT Strategy LU‐ 9.2.1 Local Amenities Encourage office development to locate in areas where workers can walk or bike to services such as shopping and restaurants, and to provide walking and bicycling connections to services. Community Development – Planning and Economic Development General Fund, Development Fees Con.Not an action item. Ongoing implementation in conjunction with Land Use Element updates and project review/approval. ECONOMIC DEVELOPMENT Strategy LU‐ 9.2.2 Workplace Policies Encourage public and private employers to provide workplace policies that enhance and improve the health and well–being of their employees.City Manager General Fund Con. Not an action item. In 2022, PC recommendeds that the health policies be updated for generix pandemic policies related to employee density and common areas but not policies specific to COVID. REGIONAL COOPERATION AND COORDINATION Policy LU‐10.1 Regional Decisions Coordinate with regional and local agencies on planning, transportation, economic development and sustainability issues to ensure that the decisions improve fiscal health and the quality of life for Cupertino residents and businesses Community Development – Planning; and City Manager – Economic Development; Public Works – Transportation and Environmental Programs; City Manager – Sustainability General Fund Con. Not an action item. Staff participates in Regional task forces, working groups and advisory groups to ensure local points of view are represented on an ongoing basis. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con58 PC 2-27-2024 58 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment REGIONAL COOPERATION AND COORDINATION Policy LU‐10.2 Regional Planning Coordination Review regional planning documents prior to making decisions at the local level.Community Development – Planning General Fund, Development Fees Con.Not an action item. Ongoing implemenation in conjunction with General Plan updates and project review/approval. REGIONAL COOPERATION AND COORDINATION Policy LU‐10.3 Neighboring Jurisdictions Collaborate with neighboring jurisdictions on issues of mutual interest.City Manager General Fund Con. Not an action item. Ongoing implemetation by participating in Regional task forces, working groups and advisory groups to ensure local points of view are represented. REGIONAL COOPERATION AND COORDINATION Policy LU‐10.4 Urban Service Area Work with neighboring jurisdictions to create boundaries that are defined by logical municipal service areas.City Manager General Fund Con. Not an action item. The City works with LAFCO to determine these boundaries. The City has acquired property to form a new park at the eastern border of the City. (near Rancho Rinconada ‐ abutting Lawrence Expwy) Annexation completed in 2022. In 2023, the City entered into an agreement with the County to work cooperatively on a plan for future allowable uses and annexation potential of the Lehigh/Heidelberg Quarry. These will be presented to the Commission and Council in coming years. REGIONAL COOPERATION AND COORDINATION Strategy LU‐ 10.4.1 Tax Sharing Agreements Consider entering into tax–sharing agreements with adjacent jurisdictions in order to facilitate desired boundary realignments.City Manager General Fund LR No action has been taken with regard to tax‐sharing agreements. REGIONAL COOPERATION AND COORDINATION Policy LU‐10.5 Annexation Actively pursue the annexation of unincorporated properties within the City’s urban service area, including the Creston neighborhoods, which will be annexed on a parcel–by–parcel basis with new development. Other remaining unincorporated islands will be annexed as determined by the City Council. Community Development – Planning, Public Works – Development Services General Fund Con. Not an action item. LAFCO encourages the annexation of all county pockets. Ongoing implementation of this, as and when, properties are available for annexation. ACCESS TO COMMUNITY FACILITIES AND SERVICES Policy LU‐11.1 Connectivity Create pedestrian and bicycle access between new developments and community facilities. Review existing neighborhood circulation to improve safety and access for students to walk and bike to schools, parks, and community facilities such as the library. Community Development – Planning, Public Works – Development Services and Transportation General Fund Con. No action required at this time. Ongoing implemenation via implementation of the Bicycle and Pedestrian Master Plans and during project review/approval. ACCESS TO COMMUNITY FACILITIES AND SERVICES Policy LU‐11.2 De Anza College Allow land uses not traditionally considered part of a college to be built at De Anza College, provided such uses integrate the campus into the community, provide facilities and services not offered in the City and/or alleviate impacts created by the college. City Manager General Fund Con. Not an action item. Staff supports the incorporation of such uses as the opportunity presents itself; however, the City does not have land use or permitting authority over state facilities. HILLSIDES Policy LU‐12.1 Land Use Regulations Establish and maintain building and development standards for hillsides that ensure hillside protection. Community Development – Planning and Building, Public Works – Development Services General Fund Con. Not an action item. Ongoing implementation via the Municipal Code and project review/approval. These policies are now also implemented through the Cityʹs regulations related to SB9 adopted in 2022. HILLSIDES Strategy LU‐ 12.1.1 Ordinance and Development Review Through building regulations and development review, limit development on ridgelines, hazardous geological areas and steep slopes. Control colors and materials and minimize the illumination of outdoor lighting. Reduce visible building mass with measures including, stepping structures down the hillside, following natural contours, and limiting the height and mass of the wall plane facing the valley floor. Community Development – Planning and Building, Public Works – Development Services General Fund Con. Not an action item. Ongoing implementation via the Municipal Code during project review/approval. These policies are also implemented through the Cityʹs adopted regulations related to SB 9 development adopted in November 2022. HILLSIDES Strategy LU‐ 12.1.2 Slope–Density Formula Apply a slope–density formula to very low intensity residential development in the hillsides. Density shall be calculated based on the foothill modified, foothill modified 1/2 acre and the 5–20 acre slope density formula. Actual lot sizes and development areas will be determined through zoning ordinances, clustering and identification of significant natural features and geological constraints. Community Development – Planning General Fund Con. Not an action item. Ongoing implementation via Appendix F of the General Plan and the Land Use Map. Does not apply to SB 9 subdivisions. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con59 PC 2-27-2024 59 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HILLSIDES Strategy LU‐ 12.1.3 1976 General Plan – Previously Designated Very Low Density: Semi–Rural 5–Acre Properties previously designated Very Low–Density Residential: Semi–Rural 5–Acre per the 1976 General Plan may be subdivided using that formula. Properties that have already been since subdivided in conformance with the above designation have no further subdivision potential for residential purposes. Community Development – Planning General Fund, Development Fees Con. Not an action item. All properties within this category have now sub‐divided. And no other potential for further subdivision exists, except for subdivisions authorized under SB 9. HILLSIDES Strategy LU‐ 12.1.4 Existing Lots in Foothill Modified and Foothill Modified 1/2–Acre Slope Density Designations Require discretionary review with a hillside exception for hillside or R1 properties if development is proposed on substandard parcels on slopes per the R1 and RHS zoning. Community Development – Planning General Fund, Development Fees Con.Not an action item. Ongoing implementation via the Municipal Code. This provision cannot be applied to SB 9 projects. HILLSIDES Policy LU‐12.2 Clustering Subdivisions Cluster lots in major subdivisions and encourage clustering in minor subdivisions, for projects in the 5–20 acre slope density designation. Reserve 90 percent of the land in private open space to protect the unique characteristics of the hillsides from adverse environmental impacts. Keep the open space areas contiguous as much as possible. Community Development – Planning General Fund Con. Not an action item. Ongoing implementation during project review/approval. HILLSIDES Policy LU‐12.3 Rural Improvement Standards in Hillside Areas Require rural improvement standards in hillside areas to preserve the rural character of the hillsides. Improvement standards should balance the need to furnish adequate utility and emergency services against the need to protect the hillside, vegetation and animals. Public Works – Development Services and Transportation General Fund Con. Not an action item. Ongoing implementation via application of rural standards maintained by the Public Works Department and by SCC Fire in conjunction with project review/approval. HILLSIDES Strategy LU‐ 12.3.1 Grading Follow natural land contours and avoid mass grading of sites during construction, especially in flood hazard or geologically sensitive areas. Grading hillside sites into large, flat areas shall be avoided. Community Development – Planning, Public Works – Development Services General Fund Con. Not an action item. Ongoing implementation via Municipal Code standards during project review/approval. These policies were implemented in 2022 through the Cityʹs ordinance adopted in November 2022. HILLSIDES Strategy LU‐ 12.3.2 Roads Roads should be narrowed to avoid harming trees and streambeds. Public Works – Development Services, Capital Improvements and Transportation General Fund, Development Fees Con. Not an action item. Ongoing implementation via application of rural standards maintained by the Public Works Department in conjunction with project review/approval. HILLSIDES Strategy LU‐ 12.3.3 Trees Retain significant specimen trees, especially when they grow in groves or clusters and integrate them into the developed site. Community Development – Planning General Fund, Development Fees Con.Not an action item. Ongoing implemenation via implementation of the Municipal Code HILLSIDES Policy LU‐12.4 Hillside Views The Montebello foothills at the south and west boundary of the valley floor provide a scenic backdrop, adding to the City’s scale and variety. While it is not possible to guarantee an unobstructed view of the hills from every vantage point, an attempt should be made to preserve views of the foothills. Community Development – Planning, Public Works – Capital Improvements General Fund, Development Fees Con.Not an action item. Implemented by Strategies LU‐12.4.1 and LU‐12.4.2 HILLSIDES Strategy LU‐ 12.4.1 Views from Public Facilities Design public facilities, particularly open spaces, so they include views of the foothills or other nearby natural features, and plan hillside developments to minimize visual and other impacts on adjacent public open space. Public Works – Capital Improvements General Fund, Grants Con.Not an action item. Ongoing implementation during project design HILLSIDES Strategy LU‐ 12.4.2 Development near Public Space Locate private driveways and building sites as far as possible from property boundaries adjoining public open space preserves and parks to enhance the natural open space character and protect plant and animal habitat. Community Development – Planning, Public Works – Development Services General Fund, Development Fees Con. Not an action item. Ongoing implemantation via implementation of the Residential Hillside standards in the Municipal Code HILLSIDES Policy LU‐12.5 Development in the County Jurisdiction Development in the County, particularly if located near Cupertino’s hillsides and urban fringe area, should consider the goals and policies in Community Vision 2040. Community Development – Planning, Public Works – Development Services General Fund Con. Implemented by Strategy 12.5.1 Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con60 PC 2-27-2024 60 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HILLSIDES Strategy LU‐ 12.5.1 County Development Development in these areas should be compatible with Cupertino’s hillside policies of low–intensity residential, agricultural or open space uses. Preservation of the natural environment, clustering sites to minimize impact and dedication of open space are encouraged. Visual impacts, access, traffic and other impacts, and service demands should be assessed in consultation with Cupertino’s goals and policies. Community Development – Planning, Public Works – Development Services General Fund Con. Not an action item. Comments are sent to the County if development is proposed near the Cupertino hillsides and urban fringe area to ensure this is communicated. HEART OF THE CITY SPECIAL AREA Policy LU‐13.1 Heart of the City Specific Plan The Heart of the City Specific Plan provides design standards and guidelines for this area, which promote a cohesive, landscaped boulevard that links its distinct sub–areas and is accessible to all modes of transportation. Community Development – Planning, Public Works – Development Services General Fund IM Not an action item. Heart of the City adopted by the Council in 1995 and amended several times (last in 2014). Amendments may be necessary to the Heart of the City Specific Plan to address rezoning required for purposes of the 6th Cycle Housing Element in 2024. HEART OF THE CITY SPECIAL AREA Policy LU‐13.2 Redevelopment Encourage older properties along the boulevard to be redeveloped and enhanced. Allow more intense development only in nodes and gateways as indicated in the Community Form Diagram (Figure LU–2). Community Development – Planning General Fund IM Not an action item. Heart of the City adopted by the Council in 1995 and amended several times (last in 2014). Amendments may be necessary to the Heart of the City Specific Plan to address rezoning required for purposes of the 6th Cycle Housing Element in 2024. HEART OF THE CITY SPECIAL AREA Policy LU‐13.3 Parcel Assembly Encourage the assembly of parcels to foster new development projects that can provide high–quality development with adequate buffers for neighborhoods. Community Development – Planning General Fund Con. Not an action item. implemented during project review/ approval at the Councilʹs discretion. Amendments may be required to the Heart of the City Specific Plan to address rezoning required for purposes of the 6th Cycle Housing Element in 2024. HEART OF THE CITY SPECIAL AREA Policy LU‐13.4 Neighborhood Centers and Activity Areas A majority of the commercial development allocation should be devoted to rehabilitating neighborhood centers and major activity centers with a focus on creating pedestrian–oriented, walkable and bikeable areas with inviting community gathering places. Land uses between the activity centers should help focus and support activity in the centers. Neighborhood centers should be retrofitted and redeveloped using the “neighborhood commercial centers” concept discussed earlier in this Element. Community Development – Planning, Public Works – Development Services General Fund Con. Not an action item. Implemented during project review/approval. HEART OF THE CITY SPECIAL AREA Policy LU‐13.5 Land Use The Heart of the City area allows a mix of retail, commercial, office and residential uses. Special uses are provided in the Heart of the City Specific Plan. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. Not an action item. Amendments may be required to Figure LU‐2 and Heart of the City Specific Plan to address rezoning required for purposes of the 6th Cycle Housing Element in 2024. HEART OF THE CITY SPECIAL AREA Policy LU‐13.6 Building Form Buildings should be high–quality, with pedestrian–oriented and active uses along the street.Community Development – Planning General Fund Con. Not an action item. Design guidelines in Heart of the City Specific Plan. Additionally, specific and objective design guidelines to be developed with the Mixed‐use Design Guidelines Work program item. HEART OF THE CITY SPECIAL AREA Policy LU‐13.7 Streetscape and Connectivity Create a walkable and bikeable boulevard with active uses and a distinct image for each subarea. Community Development – Planning, Public Works – Development Services General Fund Con. Not an action item. Streetscape design in Heart of the City Specific Plan HEART OF THE CITY SPECIAL AREA Strategy LU‐ 13.7.1 Streetscape Provide active uses along the street frontage, bike lanes, sidewalks that support pedestrian–oriented activity, improved pedestrian crossings at street intersections, and attractive transit facilities (e.g., bus stops, benches, etc.). Community Development – Planning, Public Works – Development Services General Fund Con. Not an action item. Standards related to active uses in Heart of the City Specific Plan, which is implemented in project review/approval HEART OF THE CITY SPECIAL AREA Strategy LU‐ 13.7.2 Street Trees and Landscaping Create a cohesive visual image with street tree plantings along the corridor, but with distinct tree types for each sub–area to support its distinct character and function. Community Development – Planning, Public Works – Development Services and Service Center General Fund IM Not an action item. Streetscape design in Heart of the City Specific Plan. Possible changes due to item in FY23/24 City Council Work Program. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con61 PC 2-27-2024 61 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HEART OF THE CITY SPECIAL AREA Strategy LU‐ 13.7.3 Connectivity Properties within a block should be inter–connected with shared access drives. Provide pedestrian paths to enhance public access to and through the development. New development, particularly on corner lots, should provide pedestrian and bicycle improvements along side streets to enhance connections to surrounding neighborhoods. Community Development – Planning, Public Works – Development Services General Fund Con. Not an action item. E.g. all properties between N. Portal and N. Blaney are inter‐connected with shared access drives. Most properties between N. Blaney and Randy Lane are inter‐ connected. Bike and pedestrian improvements required for all properties that develop. HEART OF THE CITY SPECIAL AREA Strategy LU‐ 13.7.4 Traffic Calming Evaluate options on Stevens Creek Boulevard to improve the pedestrian environment by proactively managing speed limits, enforcement, and traffic signal synchronization. Public Works – Transportation and Development Services General Fund Con. Not an action item. City performs ongoing evaluations of speed limits, traffic signal timing and coordination with enforcement efforts. HEART OF THE CITY SPECIAL AREA Strategy LU‐ 13.7.5 Neighborhood Buffers Consider buffers such as setbacks, landscaping and/or building transitions to buffer abutting single–family residential areas from visual and noise impacts. Community Development – Planning General Fund Con.Not an action item. Standards related to buffers in Heart of the City Specific Plan and implemented with project review. WEST STEVENS CREEK BOULEVARD SUBAREA Policy LU‐14.1 Land Use Primary land uses include quasi–public/public facilities, with supporting mixed commercial/residential uses. Community Development – Planning General Fund Con. Not an action item. Implemented through the Heart of the City Specific Plan. WEST STEVENS CREEK BOULEVARD SUBAREA Policy LU‐14.2 Streetscape Street tree planting that supports an active, pedestrian–oriented environment. Street tree planting should provide a connection with the adjacent foothills with trees such as oaks. Community Development – Planning; Public Works – Development Services and Service Center General Fund Con.Not an action item. Implemented through the Heart of the City Specific Plan and Cityʹs street tree planting policies. WEST STEVENS CREEK BOULEVARD SUBAREA Policy LU‐14.3 Gateway Concept Buildings should be high–quality in keeping with the gateway character of the area. Projects should provide or contribute towards gateway signs and landscaping. Community Development – Planning, Public Works – Development Services General Fund Con. Not an action item. Implemented during project review. WEST STEVENS CREEK BOULEVARD SUBAREA Policy LU‐14.4 De Anza College Node Buildings should be designed to fit into the surroundings with pedestrian–orientation. Externalizing activities by providing cafeterias, bookstores and plazas along the street and near corners is encouraged. Community Development – Planning General Fund Con.Not an action item. Staff supports the incorporation of such uses as the opportunity presents itself. WEST STEVENS CREEK BOULEVARD SUBAREA Policy LU‐14.5 Oaks Gateway Node This is a gateway retail and shopping node. New residential, if allowed, should be designed on the “mixed–use village” concept discussed earlier in this Element. Community Development – Planning General Fund IM Development project modification approved in December 2021. Units reduced from 267 to 259 by applicant. Project description and plans available at www.cupertino.org/westport. WEST STEVENS CREEK BOULEVARD SUBAREA Policy LU‐14.6 Community Recreation Node Contribute to the high–quality streetscape with trees, sidewalks, building and site design, and active uses such as main entries, lobbies or similar features along the street to reinforce pedestrian orientation. Public Works – Development Services; Community Development – Planning General Fund Con. Not an action item. Implemented through the Heart of the City Specific Plan. CROSSROADS SUBAREA Policy LU‐15.1 Crossroads Streetscape Plan Create a streetscape plan for the Crossroads Subarea that provides design standards and guidelines for an attractive, walkable, vibrant shopping village, where commercial and roadway design encourage pedestrian activity. The plan will include the following elements: *Land use plan specifying the type, intensity and arrangement of land uses to promote pedestrian and business activity. *Streetscape plan that provides for an attractive pedestrian streetscape. *Design guidelines that foster pedestrian activity and a sense of place. Community Development – Planning, Public Works – Development Services General Fund LR While standards for an attractive, walkable and assessible public sidewalk design have been established, no further action has been taken on creation of a streetscape plan for the Crossroads subarea. CROSSROADS SUBAREA Strategy LU‐ 15.1.1 Uses Include in this subarea primary uses such as retail, office and commercial. Ground floor uses shall have active retail uses with storefronts. Commercial office and office uses may be allowed on upper levels. In the case of deep lots, building along the street should provide retail and buildings in the back may be developed with allowed uses. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. Currently implemented through the Heart of the City Specific Plan during project review since a separate Crossroads plan has not been developed. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con62 PC 2-27-2024 62 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment CROSSROADS SUBAREA Strategy LU‐ 15.1.2 Streetscape Primary ground–floor entrances shall face the street. The streetscape shall consist of wide pedestrian sidewalks with inviting street furniture, street trees, pedestrian–scaled lighting with banners, small plazas, art/water features, pedestrian crosswalks with special paving, and other elements identified in the Crossroads Streetscape Plan. Community Development – Planning, Public Works – Development Services and Transportation General Fund Con. Currently implemented through the Heart of the City Specific Plan during project review since a separate Crossroads plan has not been developed. CROSSROADS SUBAREA Strategy LU‐ 15.1.3 Streetscape Primary ground–floor entrances shall face the street. The streetscape shall consist of wide pedestrian sidewalks with inviting street furniture, street trees, pedestrian–scaled lighting with banners, small plazas, art/water features, pedestrian crosswalks with special paving, and other elements identified in the Crossroads Streetscape Plan. Community Development – Planning, Public Works – Development Services and Transportation General Fund Con. Currently implemented through the Heart of the City Specific Plan during project review since a separate Crossroads plan has not been developed. CROSSROADS SUBAREA Strategy LU‐ 15.1.4 Shared Parking Require shared parking and access arrangements throughout the area, with overall parking standards reflecting the shared parking. Community Development – Planning General Fund Con. Currently implemented through the Heart of the City Specific Plan. Shared parking arrangements exist at the Target/Bottegas site and the Crossroads Shopping Center. CROSSROADS SUBAREA Strategy LU‐ 15.1.5 De Anza Boulevard/ Stevens Creek Boulevard Landmark Secure permanent landscape easements as a condition of development from properties at the intersection of De Anza and Stevens Creek Boulevards for construction of a future landmark. The landmark may include open space, landscaping and other design elements at the corners. Land at the southeast corner will remain a publicly accessible park. Community Development – Planning General Fund Con. Easements exist at the N‐E, S‐E and S‐W corners. The only corner at which this does not exist, though the existing building itself frames the corner is the N‐W corner. This will be implemented with new development proposed at that corner. CITY CENTER SUBAREA Policy LU‐16.1 City Center Node Establish the City Center Node as a moderately–scaled, medium–density mixed–use office, hotel, retail and residential area, with an integrated network of streets and open space. Community Development – Planning General Fund Con. Not an action item. CITY CENTER SUBAREA Strategy LU‐ 16.1.1 Uses A mix of uses including, office, hotel, retail, residential and civic uses. The ground floor of buildings along the street should be activated with pedestrian–oriented, active uses including retail, restaurants, and entries. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. Not an action item. CITY CENTER SUBAREA Strategy LU‐ 16.1.2 Connectivity New development should improve the connectivity within the block and with surrounding streets, including connections to the Crossroads subarea. Community Development – Planning; General Fund Con. Not an action item. CITY CENTER SUBAREA Strategy LU‐ 16.1.3 Building Form Buildings should be moderately–scaled to transition from existing taller buildings to the scale of the surrounding area. Taller buildings should provide appropriate transitions to fit into the surrounding area. Community Development – Planning General Fund Con. Not an action item. Figure LU‐2 has slope line established and Heart of the City Specific Plan has landscape easement requirements. CITY CENTER SUBAREA Strategy LU‐ 16.1.4 Gateway Concept Buildings should be designed with high–quality architecture and landscaping befitting the gateway character of the site. Community Development – Planning General Fund Con. Not an action item. Heart of the City Specific Plan has design guidelines. CITY CENTER SUBAREA Strategy LU‐ 16.1.5 Open Space A publicly–accessible park shall be retained at the southeast corner of Stevens Creek and De Anza Boulevards and shall include public art, seating areas and plazas for retail and restaurant uses along the ground floor of adjacent buildings. Parks and Recreation – Business Services General Fund Con. Not an action item. Completed. CITY CENTER SUBAREA Policy LU‐16.2 Civic Center Node Create a civic heart for Cupertino that enables community building by providing community facilities, meeting and gathering spaces, public art, and space for recreation and community events. Public Works – Development Services and Capital Improvements General Fund IM Civic Center Master Plan provides guidance on capital projects in this node. Library expansion project was considered in the Civic Center Master Plan and was constructed in 2021. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con63 PC 2-27-2024 63 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment CENTRAL STEVENS CREEK BOULEVARD SUBAREA Policy LU‐17.1 Land Use Allow a mix of uses including commercial, retail, commercial office and limited residential uses. The ground floor of buildings along the street should be active uses including retail, restaurants, entries etc. Neigborhood centers shall be remodeled or redeveloped using the “neighborhood commercial center” concept described earlier in this Element. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. Not an action item. Main Street development completed in 2015. Metropoitan Condominiums built in 2006/2007. Nineteen800 developed in 2016. Three properties owned by Apple Inc. with offices are the only ones not redeveloped in the recent past. A project on one of the Apple parcels currently under review. EAST STEVENS CREEK BOULEVARD SUBAREA Policy LU‐18.1 Land Use Allow regional commercial with retail, commercial, office and hotels as the primary uses, with residential mixed–use as a supporting use. Retail, restaurant and other active uses are highly encouraged on the ground floor facing the street. In case of office complexes, active uses such as entries, lobbies or plazas should be provided on the ground floor along the street. Neighborhood centers shall be remodeled or redeveloped using the “neighborhood commercial centers” concept described earlier in this Element. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con.Not an action item. Implemented through the Heart of the City Specific Plan during project review. EAST STEVENS CREEK BOULEVARD SUBAREA Policy LU‐18.2 South Vallco Retain and enhance the South Vallco area as a mixed–use retail, office and residential district with a pedestrian–oriented, downtown atmosphere. Community Development – Planning General Fund Con. Not an action item. EAST STEVENS CREEK BOULEVARD SUBAREA Strategy LU‐ 18.2.1 Uses Encourage a mix of retail, commercial, office, residential and hotel uses. Provide active retail uses on the ground floor facing the street or outdoor pedestrian corridor with connections to adjacent development. Office sites to the north of Vallco Parkway are encouraged to provide retail uses. However, if retail is not provided, office sites should provide entries and active uses along the street frontage. Community Development – Planning General Fund Con. Not an action item. EAST STEVENS CREEK BOULEVARD SUBAREA Strategy LU‐ 18.2.2 Vallco Parkway Vallco Parkway is envisioned as a parkway with bike lanes, wide sidewalks, street–trees and on–street parking. The street will connect to a future street grid in the Vallco Shopping District. Community Development – Planning; Public Works – Development Services General Fund Con. Not an action item. VALLCO SHOPPING DISTRICT SPECIAL AREA Policy LU‐19.1 Allowed Land Uses The following uses are allowed in the Vallco Shopping District Special Area (see Figure LU‐2 for residential densities and criteria and Figure LU‐4 for location of allowable land uses): 1. Residential: Permit residential and ground floor commercial development within the portion of the site designated for Regional Shopping/Residential uses in advance of creating a specific plan, at a maximum density of 35 dwelling units per acre and a minimum density of 29.7 dwelling units per acre by right, with maximum heights as shown in Figure LU‐2. Limited ground floor commercial uses are permitted, but not required, in connection with residential development. 2. Non‐Residential: Permit commercial uses consistent with the Regional Shopping/ Residential and Regional Shopping designation. Maintain a minimum of 600,000 square feet of retail that provide a good source of sales tax for the City. Entertainment uses may be included but shall consist of no more than 30 percent of retail uses. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. Planning Commission in 2020, as part of the GP annual report process, reccommended on 4‐1 (Fung ‐ no) straw poll to consider requiring ground floor retail along Vallco Parkway. VALLCO SHOPPING DISTRICT SPECIAL AREA Policy LU‐19.2 Development Standards New development within the Vallco Shopping District Special Area shall be required to comply with the following standards: Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.2.1 ʺTown Centerʺ Layout Create streets and blocks laid out using ʺtransect planningʺ (appropriate street and building types for each area), which includes a discernable center and edges, public space at center, high quality public realm, and land uses appropriate to the street and building typology. Private streets must be open to the sky. Connections between buildings are permitted at levels above the third floor for public serving uses or for limited walkways (no wider than 10 feet) which may be private. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con64 PC 2-27-2024 64 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.2.2 Existing Streets Improve Stevens Creek Boulevard and Wolfe Road to become more bike and pedestrian‐friendly with bike lanes, wide sidewalks, street trees, improved pedestrian intersections to accommodate the connections to Nineteen800, Main Street, and the surrounding areas. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.2.3 Tribal Coordination The City of Cupertino shall coordinate with applicable Native American tribal representatives following approval of development in the Vallco Shopping District Special Area to ensure appropriate cultural sensitivity training is provided to all contractors prior to the start of ground‐disturbing activities. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Policy LU‐19.3 Specific Plan Create a Vallco Shopping District Specific Plan prior to any development on the portion of the site with the Regional Shopping designation that lays out the land uses, design standards and guidelines, and infrastructure improvements required. The Specific Plan will be based on the following strategies: Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.1 Master Developer Redevelopment of the portion of the site with the Regional Shopping designation pursuant to the specific plan will require a master developer in order remove the obstacles to the development of a cohesive district with the highest levels of urban design. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.2 Parcel Assembly Parcel assembly and a plan for complete redevelopment of the site is required prior to designating any additional area for residential uses. Parcelization is highly discouraged in order to preserve the site for redevelopment in the future. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.3 Complete Redevelopment The ʺtown centerʺ plan should be based on complete redevelopment of the site in order to ensure that the site can be planned to carry out the community vision. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.4 Connectivity Provide a newly configured complete street grid hierarchy of streets, boulevards and alleys that is pedestrian‐oriented, connects to existing streets, and creates walkable urban blocks for buildings and open space. It should also incorporate transit facilities, provide connections to other transit nodes and coordinate with the potential expansion of Wolfe Road bridge over Interstate 280 to continue the walkable, bikeable boulevard concept along Wolfe Road. The project should also contribute towards a study and improvements to a potential Interstate 280 trail along the drainage channel south of the freeway and provide pedestrian and bicycle connections from the project sites to the trail. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. Juniperro Serra trail funding is in early stages. In 2020, as part of the GP Annual Report, Comm. Fung wishes for the last sentence to be struck from this Strategy. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.5 Open Space Open space in the form of a central town square on the west and east sides of the district interspersed with plazas and “greens” that create community gathering spaces, locations for public art, and event space for community events. Public Works – Development Services; Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.6 Building Form Buildings should have high‐quality architecture, and an emphasis on aesthetics, human scale, and create a sense of place. Taller buildings should provide appropriate transitions to fit into the surrounding area. Community Development ‐ Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.7 Gateway Character High‐quality buildings with architecture and materials befitting the gateway character of the site. The project should provide gateway signage and treatment. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.8 Phasing Plan A phasing plan that lays out the timing of infrastructure, open space and land use improvements that ensures that elements desired by the community are included in early phases. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con65 PC 2-27-2024 65 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.9 Parking Parking in surface lots shall be located to the side or rear of buildings. Underground parking beneath buildings is preferred. Above grade structures shall not be located along major street frontages. In cases, where above‐grade structures are allowed along internal street frontages, they shall be lined with retail, entries and active uses on the ground floor. All parking structures should be designed to be architecturally compatible with a highquality “town center” environment. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.10 Trees Retain trees along the Interstate 280, Wolfe Road and Stevens Creek Boulevard to the extent feasible, when new development are proposed. Community Development – Planning; Public Works – Development Services IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. VALLCO SHOPPING DISTRICT SPECIAL AREA Strategy LU‐ 19.3.11 Neighborhood Buffers Consider buffers such as setbacks, landscaping and/or building transitions to buffer abutting singlefamily residential areas from visual and noise impacts. Community Development – Planning IM Policy edited in September 2019. Vallco SB35 (The Rise) project modification received in Dec. 2023 building permits under review. NORTH VALLCO PARK SPECIAL AREA Policy LU‐20.1 Land Use This area is a major employment node with office, and research and development uses. Retail and hotel uses are allowed on the west side of Wolfe Road. Redevelopment of the retail site at the corner of Wolfe and Homestead Roads should be based on the “neighborhood commercial center” concept described earlier in this Element. Retail uses are not required on the Hamptons site. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. The Hamptons project (on a Housing Element site) approved in 2016. Building permits not submitted yet. Hotel at Cupertino Village approved in 2019. Building permits not submitted yet. In 2020, as part of the GP Annual Report process, Planning Commission recommended that N. De Anza Special Area is worthy of being re‐evaluated for a different balance of land uses. NORTH VALLCO PARK SPECIAL AREA Policy LU‐20.2 Streetscape and Connectivity Future roadway improvements on Wolfe Road, Homestead Road, and Tantau Avenue should be coordinated with planned improvements to improve pedestrian, bike and transit connections. Streetscape improvements will enhance the pedestrian environment with street trees, attractive bus shelters, and street furniture. The campus site should provide an attractive landscaped edge along the street. Future improvements to the Wolfe Road bridge should be coordinated to preserve the vision for this area. Public Works – Development Services General Fund Con. Not an action item. NORTH VALLCO PARK SPECIAL AREA Policy LU‐20.3 Building Form Buildings in the retail and hotel area should provide active, pedestrian–oriented uses along the street. Buildings should transition to fit the scale of the surrounding area. Taller buildings should provide appropriate transitions to fit into the surrounding area. In addition to the height limits established in the Community Form Diagram, buildings abutting the campus shall incorporate appropriate setbacks, landscaped buffering, and building height transitions to minimize privacy and security impacts. Community Development – Planning General Fund Con. Not an action item. NORTH VALLCO PARK SPECIAL AREA Policy LU‐20.4 Pedestrian and Bicycle Connections Pedestrian–oriented retail and hotel development will support a diverse population of workers and residents in the area. Trail routes, and alternate trail routes to address security and privacy concerns of major employers, shall be developed to provide pedestrian and bicycle connections to other destinations. Community Development – Planning Con. Not an action item. NORTH VALLCO PARK SPECIAL AREA Policy LU‐20.5 Gateway Concept Building and landscape design should be of high quality and reflect the fact that this area is a gateway into Cupertino from Interstate 280 and points north. The project should provide gateway signage and treatment. Community Development – Planning General Fund Con. Not an action item. NORTH VALLCO PARK SPECIAL AREA Policy LU‐20.6 Neighborhood Buffers Provide building transitions, setbacks and/or landscaping to buffer development from adjoining single–family residential uses. Community Development – Planning General Fund Con. Not an action item. NORTH DE ANZA SPECIAL AREA Policy LU‐21.1 Conceptual Plan Amend the North De Anza Conceptual Plan to create a cohesive set of land use and streetscape regulations and guidelines for the North De Anza area. Community Development – Planning; Public Works – Development Services, IM Relevant changes to N. De Anza will be considered with the Housing Element udpate Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con66 PC 2-27-2024 66 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment NORTH DE ANZA SPECIAL AREA Policy LU‐21.2 Land Use Primarily office, and research and development uses supplemented with limited commercial and residential uses. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund IM Relevant changes to N. De Anza will be considered with the Housing Element udpate NORTH DE ANZA SPECIAL AREA Policy LU‐21.3 Streetscape and Connectivity North De Anza is envisioned as a walkable, bikeable boulevard with wide sidewalks with street trees and roadway improvements for bike lanes and pedestrian crossings. Pedestrian and bike improvements and enhanced pedestrian crossings are also envisioned along other streets in this area to create an interconnected grid. Such improvements will also improve school routes from the Garden Gate neighborhood to Lawson school to the east and provide access to transit routes. Community Development – Planning; Public Works – Development Services General Fund IM Relevant changes to N. De Anza will be considered with the Housing Element udpate NORTH DE ANZA SPECIAL AREA Strategy LU‐ 21.4 Building Design Locate buildings along the street with parking areas to the rear. Break up massing of large office buildings along the street with pedestrian scaled elements and locate building entries and active uses along the street frontage to improve the pedestrian character of the area. Mixed–use buildings should include entries, active uses and gathering spaces along the street. Community Development – Planning General Fund Con. Not an action item. NORTH DE ANZA SPECIAL AREA Policy LU‐21.5 Gateway Concept Building and landscape design should be of high quality and reflect the fact that this area is a gateway into Cupertino from Interstate 280 and points north. Community Development – Planning General Fund Con. Not an action item. NORTH DE ANZA SPECIAL AREA Policy LU‐21.6 Neighborhood Buffers Provide building transitions, setbacks and/or landscaping to buffer development from adjoining single–family residential uses. Community Development – Planning General Fund IM As part of the ʺObjective Standardsʺ Work Program item, this action is recommended as a Phase 1 action item. Expected to be considered in conjunction with the Housing Element update. SOUTH DE ANZA SPECIAL AREA Policy LU‐22.1 Conceptual Plan Maintain and implement the existing South De Anza and Sunnyvale–Saratoga Conceptual Plans.Community Development – Planning General Fund Con. Not an action item. SOUTH DE ANZA SPECIAL AREA Policy LU‐22.2 Land Use General Commercial and retail uses with limited commercial office, office and residential uses. Neighborhood centers should be redeveloped in the “neighborhood commercial centers” concept discussed earlier in this Element. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. Not an action item. Planning Commission as part of the 2020 GP Annual Report process, recommends considering changing the allowed mix of uses. SOUTH DE ANZA SPECIAL AREA Policy LU‐22.3 Parcel Assembly Highly encourage assembly of parcels to resolve the fragmented and narrow lot pattern and encourage high–quality development with adequate buffers for neighborhoods. Community Development – Planning General Fund Con. Not an action item. SOUTH DE ANZA SPECIAL AREA Policy LU‐22.4 Streetscape and Connectivity South De Anza is envisioned as a walkable, bikeable boulevard with sidewalks, street trees and roadway improvements for bike lanes and pedestrian crossings. Side streets are also envisioned with pedestrian and bicycle improvements to ensure walkable connections from adjacent neighborhoods. Public Works – Development Services; Community Development – Planning General Fund Con. Not an action item. SOUTH DE ANZA SPECIAL AREA Policy LU‐22.5 Shared Access Since South De Anza is a heavily traveled route, properties in the same block should be connected with auto and pedestrian access through shared access easements to reduce impacts on the corridor. Community Development – Planning General Fund Con. Not an action item. SOUTH DE ANZA SPECIAL AREA Policy LU‐22.6 Building Design Locate buildings and commercial pads along the street with parking areas to the side and rear. Provide pedestrian–scaled elements and active uses including retail, restaurants, and entries along the street. Outdoor plaza and activity area can be located along the street with sidewalk and street trees to buffer them from through traffic. Community Development – Planning General Fund Con. Not an action item. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con67 PC 2-27-2024 67 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment SOUTH DE ANZA SPECIAL AREA Policy LU‐22.7 Gateway Concept Building and landscape design should be of high quality and reflect the fact that this area has gateways from Highway 85 and at the souther and eastern borders of Cupertino. Community Development – Planning General Fund Con. Not an action item. SOUTH DE ANZA SPECIAL AREA Policy LU‐22.8 Neighborhood Buffers Provide building transitions, setbacks and/or landscaping to buffer development from adjoining single–family residential uses. Community Development – Planning General Fund Con. Not an action item. HOMESTEAD SPECIAL AREA Policy LU‐23.1 Conceptual Plan Create a conceptual plan for the Homestead Road Special Area with a cohesive set of land use and streetscape regulations and guidelines. Community Development – Planning General Fund LR No action has been taken with regard to creating a conceptual plan for the Homestead Special Area. HOMESTEAD SPECIAL AREA Policy LU‐23.2 Land Use Primarily retail, commercial and residential uses, with some limited quasi–public use. Redevelopment of neighborhood centers should be based on the “neighborhood commercial center” concept discussed earlier in this element. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. Not an action item. HOMESTEAD SPECIAL AREA Policy LU‐23.3 Connectivity Homestead Road is envisioned to become a boulevard with bike and pedestrian improvements and new bicycle and pedestrian crossings at De Anza Boulevard, Blaney Avenue, Wolfe Road, and Tantau Avenue. This will provide better access for people moving east/west through the City north of Interstate 280, linking neighborhoods in the western part of the City with Homestead High School, Homestead Square Shopping Center and Apple Campus 2 to the east. Public Works – Development Services General Fund Con. Not an action item. HOMESTEAD SPECIAL AREA Policy LU‐23.4 Gateway Concept Building and landscape design should be of high quality and reflect the fact that this area is a gateway into the northern part of Cupertino. Community Development – Planning General Fund Con. Not an action item. HOMESTEAD SPECIAL AREA Policy LU‐23.5 Neighborhood Buffers Provide building transitions, setbacks and/or landscaping to buffer development from adjoining single–family residential uses. Community Development – Planning General Fund Con. Not an action item. BUBB ROAD SPECIAL AREA Policy LU‐24.1 Land Use Allowed uses in the Bubb Road Special Area will consist of those described in the ML–rc ordinance with limited commercial and residential uses. Community Development – Planning General Fund Con. Not an action item. As part of the 2020 General Plan Annual Report, Planning Commission recommended considering changing the allowed mix of uses. BUBB ROAD SPECIAL AREA Policy LU‐24.2 Streetscape and Connectivity Bubb Road is envisioned as a walkable, bikeable corridor with sidewalks, street trees and roadway improvements for bike lanes and pedestrian crossings. Pedestrian and bike improvements and enhanced pedestrian crossings are also envisioned along other streets in this area to create an interconnected grid. Such improvements will also improve routes from the northern and eastern neighborhood to the tri–school area, parks and services and reduce impacts caused to school and employment traffic. Public Works – Development Services General Fund Con. Not an action item. Bike and pedestrian improvements occuring in compliance with ped/bike Master Plans and funds provided by private developers. BUBB ROAD SPECIAL AREA Policy LU‐23.3 Building and Site Design Locate buildings along the street with parking areas to the rear. Break up massing of large office buildings along the street with pedestrian–scaled elements and locate building entries and active uses along the street frontage to improve the pedestrian character of the area. Community Development – Planning General Fund Con. Not an action item. BUBB ROAD SPECIAL AREA Policy LU‐23.4 Compatibility of Use The compatibility of non–industrial uses with industrial uses must be considered when reviewing new development. Community Development – Planning General Fund Con. Not an action item. BUBB ROAD SPECIAL AREA Policy LU‐23.5 Neighborhood Buffers New industrial uses should provide building transitions, setbacks and landscaping to provide a buffer for adjoining low–intensity residential users. Community Development – Planning General Fund Con. Not an action item. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con68 PC 2-27-2024 68 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment MONTA VISTA VILLAGE Policy LU‐25.1 Conceptual Plan Continue to govern Monta Vista’s commercial area through the Monta Vista Design Guidelines. The guidelines provide direction for architecture, landscaping and public improvements. Create a Monta Vista Village Conceptual Plan with a cohesive set of updated regulations and guidelines for this area. Community Development – Planning General Fund Con./LR No action has been taken with regard to creating a Monta Vista Village Conceptual Plan, though the Monta Vista Design Guidelines are in effect and continue to be implemented. MONTA VISTA VILLAGE Policy LU‐25.2 Land Use Encourage the commercial district to serve as a neighborhood commercial center for Monta Vista Village and its adjoining neighborhoods. Mixed–use with residential is encouraged. The industrial area should be retained to provide small–scale light industrial and service industrial opportunities, while remaining compatible with the surrounding residential and commercial uses. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. Not an action item. Current zoning supports this. MONTA VISTA VILLAGE Policy LU‐25.3 Buildings and Site Design Encourage buildings to be designed in a way that promotes the small–scale, older and mixed–use character of the area. Buildings should be located along the street with pedestrian–scale architecture and retail and active uses on the ground floor. Parking should be located to the rear. Community Development Planning General Fund Con. Not an action item. Implemented through existing standards in the Monta Vista Design Guidelines. MONTA VISTA VILLAGE Strategy LU‐ 25.3.1 Storefront Appearance Commercial and office buildings shall include a storefront appearance to the public street, and shall not be separated from the public sidewalk by extensive landscaping or changes in elevation. Office buildings shall be designed to accommodate future entrances from the sidewalk for future retail uses. Community Development – Planning General Fund Con. Not an action item. Implemented through existing standards in the Monta Vista Design Guidelines. MONTA VISTA VILLAGE Strategy LU‐ 25.3.2 Parking Commercial properties or commercial portions of properties may rely on public parking on Pasadena and Imperial Avenues to meet their off–site parking needs within the area bounded by Granada Avenue, Stevens Creek Boulevard, Orange Avenue, and the Union Pacific right–of–way (see diagram to the right). Community Development – Planning General Fund Con. Not an action item. MONTA VISTA VILLAGE Policy LU‐25.4 Street Design and Connectivity Maintain Monta Vista Village as a walkable, bikeable mixed–use neighborhood with sidewalks, street trees and roadway improvements for bike lanes and sidewalks with routes to the tri–school area. Automobile, pedestrian and bicycle improvements are envisioned along other streets in this area to create an interconnected grid and with new development to remove street blockages and promote a network of streets. On–street parking is encouraged. Roadway and sidewalk improvements will also improve school routes from the northern neighborhoods to the tri–school area. Community Development – Planning; Public Works – Development Services General Fund Con.Not an action item. School route and sidewalk improvements being completed through the Capital Improvements Project. MONTA VISTA VILLAGE Strategy LU‐ 25.4.1 Interconnected Access Individual properties shall have interconnected pedestrian and vehicle access and shared parking.Community Development – Planning General Fund Con. Not an action item. Implemented through existing standards in the Monta Vista Design Guidelines. MONTA VISTA VILLAGE Strategy LU‐ 25.4.2 Residential Streets Residential street improvements may have a semi–rural appearance based on the Municipal Code requirements. Safe routes to school streets, or any others designated by the City Council shall be required to have sidewalks and street trees. Public Works– Development Services General Fund Con. Not an action item. OTHER NON–RESISENTIAL/ MIXED–USE SPECIAL AREAS Policy LU‐26.1 Land Use Retrofit or redevelop neighborhood centers using the “neighborhood commercial centers” concept discussed earlier in this Element. Areas that are not designated as “neighborhood centers” are encouraged to provide commercial uses with active uses such as entries, lobbies, seating areas or retail along the street. See Figure LU–2 for residential densities and criteria. Community Development – Planning General Fund Con. Not an action item. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con69 PC 2-27-2024 69 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment OTHER NON–RESISENTIAL/ MIXED–USE SPECIAL AREAS Policy LU‐26.2 Building and Site Design Encourage buildings to be designed in a pedestrian–oriented format. Buildings should be located along the street with pedestrian–scale architecture and retail and active uses on the ground floor. Parking should be located to the sides or rear. Buildings may be one to two stories in height. In some instances, buildings may be three stories in height. Community Development – Planning General Fund Con.Not an action item. Changes may be necessary to this policy to address the 6th Housing Element update. OTHER NON–RESISENTIAL/ MIXED–USE SPECIAL AREAS Policy LU‐26.3 Street Design and Connectivity Create neighborhood centers that area walkable, bikeable areas with sidewalks, street trees and roadway improvements for bike lanes sidewalks to provide connections to the neighborhoods that they service. Community Development – Planning General Fund Con. Not an action item. OTHER NON–RESISENTIAL/ MIXED–USE SPECIAL AREAS Policy LU‐26.4 Neighboring Buffers Encourage projects to include building transitions, setbacks and landscaping to provide a buffer for adjoining low–intensity residential uses. Community Development – Planning General Fund Con. No action has been taken on this at this time. Relevant changes as a result of zoning changes resulting from the 6th Cycle Housing Element update will be proposed in 2024. NEIGHBORHOODS Policy LU‐27.1 Compatibility Ensure that new development within and adjacent to residential neighborhoods is compatible with neighborhood character. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Strategy LU‐ 27.1.1 Regulations Maintain and update design regulations and guidelines for single–family development that address neighborhood compatibility and visual and privacy impacts. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Strategy LU‐ 27.1.2 Neighborhood Guidelines Identify neighborhoods that have a unique architectural style, historical background or location and develop plans that preserve and enhance their character. Support and budget for special zoning or design guidelines (e.g. the Fairgrove Eichler neighborhood) and single–story overlay zones in neighborhoods, where there is strong neighborhood support. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Strategy LU‐ 27.1.3 Flexibility When neighborhoods are in transition, add flexibility for requirements for new development that acknowledge the transition while continuing to respect the existing neighborhood. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Strategy LU‐ 27.1.4 Late Night Uses Discourage late–evening entertainment activities such as night–clubs in commercial areas where parcels are especially narrow, abut single–family residential development, and cannot adequately provide visual and noise buffers. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Policy LU‐27.2 Relationship to the Street Ensure that new development in and adjacent to neighborhoods improve the walkability of neighborhoods by providing inviting entries, stoops and porches along the street frontage, compatible building design and reducing visual impacts of garages. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Policy LU‐27.3 Entries Define neighborhood entries through architecture, or landscaping appropriate to the character of the neighborhood. Gates are discouraged because they isolate developments from the community. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Policy LU‐27.4 Connections Support pedestrian and bicycling improvements that improve access with neighborhoods to parks, schools and local retail, and between neighborhoods. Support traffic calming measures rather than blocking the street to reduce traffic impacts on neighborhoods. Public Works – Development Services General Fund Con. Not an action item. Implemented through the Bike/Ped Master Plans and the Capital Improvement project and/or project review. NEIGHBORHOODS Policy LU‐27.5 Streets Determine appropriate street widths, bike lane, sidewalk and streetlight design to define the unique character of neighborhoods, where appropriate. Public Works – Development Services General Fund Con. Not an action item. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con70 PC 2-27-2024 70 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment NEIGHBORHOODS Policy LU‐27.6 Multi–family Residential Design Maintain an attractive, liveable environment for multi–family dwellings.Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Strategy LU‐ 27.6.1 Provision of Outdoor Areas Provide outdoor areas, both passive and active, and generous landscaping to enhance the surroundings for multi–family residents. Allow public access to the common outdoor areas whenever possible. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Strategy LU‐ 27.6.2 Ordinance Updates Update the Planned Development (residential) and R–3 ordinances to achieve the policies and strategies applicable to multi–family development in neighborhoods. Community Development – Planning General Fund Con./IM Completed update to Planned Development Ordinance in 2019. NEIGHBORHOODS Policy LU‐27.7 Compatibility of Lots Ensure that zoning, subdivision and lot–line adjustment requests related to lot size or lot design consider the need to preserve neighborhood lot patterns. Community Development – Planning General Fund Con. Not an action item. NEIGHBORHOODS Strategy LU‐ 27.7.1 Lot Size Ensure that subdivision and lot–line adjustment requests respect the neighborhood lot size patterns. Consider revisions to lot size requirements if the neighborhood lot pattern is different from the zoning requirements. Community Development – Planning; Public Works – Development Services General Fund Con. Not an action item. NEIGHBORHOODS Strategy LU‐ 27.7.2 Flag Lots Allow flag lots only in cases where they are the sole alternative to integrate subdivisions with the surrounding neighborhood. Community Development – Planning; Public Works – Development Services General Fund Con. Not an action item. NEIGHBORHOODS Policy LU‐27.8 Protection Protect residential neighborhoods from noise, traffic, light, glare, odors and visually intrusive effects from more intense development with landscape buffers, site and building design, setbacks and other appropriate measures. Community Development – Planning; Public Works – Development Services and Transportation General Fund Con. Not an action item. Implemented via standards in the Municipal Code. NEIGHBORHOODS Policy LU‐27.9 Amenities and Services Improve equitable distribution of community amenities such as parks and access to shopping within walking and bicycling distance of neighborhoods. Public Works – Development Services; Community Development – Planning General Fund IM Parks Master Plan provides guidance to enhance an equitable distribution of community amenities. No further action required at this time. INSPIRATION HEIGHTS NEIGHBORHOOD Policy LU‐28.1 Connectivity Improve bicycle and pedestrian environment along Foothill Boulevard and Stevens Canyon Road to improve neighborhood connectivity to services as well as for hikers and bikers accessing natural open spaces in the vicinity. Public Works – Transportation General Fund Con.Not an action item. Implemented through the Ped/Bike Master Plans and improvements for private developments. INSPIRATION HEIGHTS NEIGHBORHOOD Policy LU‐28.2 Merriman–Santa Lucia Neighborhood Allow legal, non–conforming duplexes to remain in the area bounded by Santa Lucia Road, Alcalde Road and Foothill Boulevard. Community Development – Planning General Fund Con. Not an action item. OAK VALLEY NEIGHBORHOOD Policy LU‐29.1 Development Intensity Require development intensity for the single–family Oak Valley neighborhood to be consistent with the development agreement that includes the use permit and other approvals. The development agreement describes development areas, intensity and styles of development, public park dedication, tree protection, access and historic preservation. The theme of the approvals is to balance development with environmental protection by clustering development, setting it back from sensitive environmental areas and preserving large areas as permanent open space. Community Development – Planning General Fund Con. Not an action item. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con71 PC 2-27-2024 71 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment OAK VALLEY NEIGHBORHOOD Policy LU‐29.2 Design Elements Require buildings to reflect the natural hillside setting as required in residential hillside zones with traditional architectural styles and natural materials and colors. Larger building elements should be scaled to respect the existing development in the surrounding area. Community Development – Planning General Fund Con. Not an action item. Architectural standards in the approved documents for the Oak Valley development. FAIRGROVE NEIGHBORHOOD Policy LU‐30.1 Development Standards Require all new construction to conform to the R1–e zoning (Single Family Residential – Eichler).Community Development – Planning General Fund Con. Not an action item. FAIRGROVE NEIGHBORHOOD Policy LU‐30.2 Design Guidelines Encourage residents to incorporate the design guidelines illustrated in the Eichler Design Guidelines.Community Development – Planning General Fund Con. Not an action item. AVAILABILITY OF HOUSING Policy HE‐1.1 Provision of Adequate Capacity for New Construction Designate sufficient land at appropriate densities to accommodate Cupertinoʹs Regional Housing Needs Allocation (RHNA) of 1,064 units for the 2014‐2022 planning period. Community Development – Planning General Fund IM Completed with identification of Priority Housing Sites in 2014/2015 and completion of rezoning in 2019. Housing Element update to accomodate 6th Cycle RHNA of 4,588 units commenced in October 2021, statutorily required to be completed by Jan. 31 2023. Initial outreach conducted in 2021. Expected to be completed by Fall 2023. AVAILABILITY OF HOUSING Policy HE‐1.2 Housing Densities Provide a full range of densities for ownership and rental housing.Community Development – Planning None Required Con. Not an action item. AVAILABILITY OF HOUSING Policy HE‐1.3 Mixed‐use Development Encourage mixed–use development near transportation facilities and employment centers.Community Development – Housing None Required Con. Not an action item. AVAILABILITY OF HOUSING AVAILABILITY OF HOUSING HE‐1.3.2 Second Dwelling Units The City will continue to implement the Second Dwelling Unit Ordinance and encourage the production of second units. Community Development – Planning None Required Con. Not an action item. 74 ADUs have been permitted through 2022. The City continued to encourage the production of second units. In 2023, the City issued 50 building permits for ADUs ‐ this is approximately 33% of the total number of ADU building permits issued during the entire 5th Cycle. The ordinance is regularly updated to comply with state law. In 2021, the City developed a pre‐approved ADU program to further incentive the creation of ADUs. Pre‐approved ADUs Program was part of the 2020‐2021 City Council Work Program and has been launched. One property has utilitzed the pre‐ approved ADU program since then. AVAILABILITY OF HOUSING Strategy HE‐ 1.3.3 Lot Consolidation To facilitate residential and mixed use developments, the City will continue to: *Encourage lot consolidation when contiguous smaller, underutilized parcels are to be redeveloped. *Encourage master plans for such sites with coordinated access and circulation. *Provide technical assistance to property owners of adjacent parcels to facilitate coordinated redevelopment where appropriate. *Encourage intra– and inter–agency cooperation in working with applicants at no cost prior to application submittal for assistance with preliminary plan review. Community Development – Planning None Required Con. Not an action item.In 2023, the City continued to encourage lot consolidation when contiguous smaller, underutilized parcels are to be redeveloped, and provided technical assistance to property owners of adjacent parcels to coordinate redevelopment where appropriate. Encourage master plans for such sites with coordinated access and circulation. Provide technical assistance to property owners of adjacent parcels to facilitate coordinated redevelopment where appropriate. Encourage intra‐ and inter‐agency cooperation in working with applicants. Land Use Policy and Zoning Provisions Strategy HE‐ 1.3.1 To accommodate the Regional Housing Needs Allocation (RHNA), the City will continue to: *Provide adequate capacity through the Land Use Element and Zoning Ordinance to accommodate the RHNA of 1,064 units while maintaining a balanced land use plan that offers opportunities for employment None Required Community Development – Planning and Housing IM Action completed. The City continued to provide adequate capacity through the Land Use Element and Zoning Ordinance to accommodate the RHNA allocation, monitor Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con72 PC 2-27-2024 72 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment AVAILABILITY OF HOUSING Strategy HE‐ 1.3.4 Flexible Development Standards The City recognizes the need to encourage a range of housing options in the community. The City will continue to: *Offer flexible residential development standards in planned residential zoning districts, such as smaller lot sizes, lot widths, floor area ratio and setbacks, particularly for higher density and attached housing developments. *Consider granting reductions in off–street parking on a case–by–case basis for senior housing. Community Development – Planning None Required Con. Not an action item. Implemented via Municipal Code. The City continued to offer flexible residential development standards in planned residential zoning districts and consider granting reductions in off‐street parking for senior housing. The Westport Project (2020) and Marina Plaza project (2022) were approved with waivers, an incentive to development standards, and a reduction in parking standards. Both projects are located within the Heart of the City Specific Plan and on a Housing Element site. In 2022, Canyon Crossing, with 18 townhome and apartments, and Alan Row with 9 townhomes and a JADU, were both approved using density bonus. In 2023, the City approved one project (Coachhouse) and reviewed another (Bianchi Lane) both of which utilized state density bonus law, specifically the waivers section of the law. AVAILABILITY OF HOUSING Strategy HE‐ 1.3.5 Heart of the City Specific Plan To reduce constraints to housing development, and in order to ensure that the designated sites can obtain the realistic capacity shown in the Housing Element, the City will review revisions to the Heart of the City Specific Plan residential density calculation requirement, to eliminate the requirement to net the non–residential portion of the development from the lot area. Community Development – Planning None Required IM Action completed in 2014. HOUSING AFFORDABILITY Strategy HE‐2.1 Housing Mitigation Ensure that all new developments – including market–rate residential developments – help mitigate project–related impact on affordable housing needs. Community Development – Planning BMR AHF Con.Not an action item. Implemented via Municipal Code and BMR Manual. HOUSING AFFORDABILITY Policy HE‐2.2 Range of Housing Types Encourage the development of diverse housing stock that provides a range of housing types (including smaller, moderate cost of housing) and affordability levels. Emphasize the provision of housing for lower– and moderate–income households including wage earners who provide essential public services (e.g. school district employees, municipal and public safety employees, etc.) Community Development – Housing BMR AHF Con. Not an action item. Hamptons (approved in 2016) provided 30 moderate and 7 Low Income units and Marina (approved in 2016) provided 2 moderate and 16 Very‐low income units. Hamptons has a 10 year Development Agreement approved in 2016. Hamptons had a 5 year Development Agreement which has expired in 2021. A modification of the project is anticipated. Vallco SB35 project approved with 361 267 Very low and 840 934 Low income units in 2018. Vallco/The Rise SB35 project has been submitted with modifications to increase total number of units to 2,669 units with 134 units affordable to Very low income households and 756 units affordable to Low income units in December 2023. 267 of these 890 units will be part of the Cityʹs BMR inventory. HOUSING AFFORDABILITY Policy HE‐2.3 Development of Affordable Housing and Housing for Persons with Special Needs Maintain and/or adopt appropriate land use regulations and other development tools to encourage the development of affordable housing. Make every reasonable effort to disperse units throughout the community but not at the expense of undermining the fundamental goal of providing affordable units. Community Development – Planning and Housing BMR AHF IM FY 19‐20, FY 20‐21, FY 21‐22, and FY 22‐23 work program ‐ Efforts to accommodate an Extremely Low Income affordable housing development for persons with developmental disabilities underway. The City issued an Request for Proposal (RFP) in the Fall of 2022 for the development of affordable housing at the Mary Avenue site and received one proposal, currently in review. The City has reissued the RFP in December 2023 to allow leasing the site for 99 years for an affrodable housing development. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con73 PC 2-27-2024 73 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HOUSING AFFORDABILITY Strategy HE‐ 2.3.1 Office and Industrial Housing Mitigation Program The City will continue to implement the Office and Industrial Housing Mitigation Program. This program requires that developers of office, commercial and industrial space pay a mitigation fee, which will then be used to support affordable housing in the City of Cupertino. These mitigation fees are collected and deposited in the City’s Below Market–Rate Affordable Housing Fund (BMR AHF). Community Development – Planning and Housing BMR AHF IM Housing Mitigation Manual and BMR Fee updated in May 2020, including new 20% inclusionary requirement for ownership units in projects over 7 units. To help offset the loss of land, the City continued to implement the Office and Industrial Housing Mitigation Program. The City requires developers of office, commercial, and industrial space to pay a mitigation fee to support affordable housing. Mitigated fees are collected and deposited into the Cityʹs BMR Affordable Housing Fund (AHF) for the following fiscal years (FY) the following mitigation fees were collected and deposited and in the BMR AFH fund. In 2023, there was $175,873.48 in BMR AHF funds collected. Community Development – Planning and Housing Comment from prior years ‐ Add people with special needs, as a bonus point? The City continued to implement the Residential Housing Mitigation Program. The program applies to new residential development and includes the provision of BMR units or the payment of the ʺHousing Mitigationʺ fee. The BMR Linkage Fees Update study was completed and adopted by City Council on May 19, 2020, which included an increased requirement of 15%‐20% for inclusionary ownership projects. In 2023, the BMR AHF provided funding to the following affordable housing projects, strategies, and services: •BMR Program Administration ‐ 4 BMR ownership resales and 13 BMR rental turnovers •Fair housing services ‐ $50,000 to Project Sentinel •$126,397.42 to the Homeless Jobs Program ConHOUSING AFFORDABILITY The City will continue to implement the Residential Housing Mitigation Program to mitigate the need for affordable housing created by new market–rate residential development. This program applies to new residential development. Mitigation includes either the payment of the “Housing Mitigation” fee or the provision of a Below Market–Rate (BMR) unit or units. Projects of seven or more for–sale units must provide on–site BMR units. Projects of six units or fewer for–sale units can either build one BMR unit or pay the Housing Mitigation fee. Developers of market–rate rental units, where the units cannot be sold individually, must pay the Housing Mitigation fee to the BMR AHF. The BMR program specifies the following: a. Priority. To the extent permitted by law, priority for occupancy is given to Cupertino residents, Cupertino full–time employees, and Cupertino public service employees as defined in Cupertino’s Residential Housing Mitigation Manual. b. For–Sale Residential Developments. Require 15% for–sale BMR units in all residential developments where the units can be sold individually (including single–family homes, common interest developments, and condominium conversions or allow rental BMR units as allowed in (d) below). c. Rental Residential Developments. To the extent permitted by law, require 15% rental very low and low–income BMR units in all rental residential developments. If the City is not permitted by law to require BMR units in rental residential developments, require payment of the Housing Mitigation Fee. d. Rental Alternative. Allow rental BMR units in for–sale residential developments, and allow developers of market–rate rental developments to provide on–site rental BMR units. If the developer: 1) enters into an agreement limiting rents in exhange for a financial contribution or a type of assistance specified in density bonus law (which includes a variety of regulatory relief); and 2) provides very low–income and low–income BMR rental units. e. Affordable Prices and Rents. Establish guidelines for affordable sales prices and affordable rents for new affordable housing and update the guidelines each year as new income guidelines are received. f. Development of BMR Units Off Site. Allow developers to meet all or a portion of their BMR or Housing Mitigation fee requirement by making land available for the City or a nonprofit housing developer to construct affordable housing, or allow developers to construct the required BMR units off site, in partnership with a nonprofit. The criteria for land donation or off–site BMR units (or combination of the two options) will be identified in the Residential Housing Mitigation Manual. g. BMR Term. Require BMR units to remain affordable for a minimum of 99 years; and enforce the City’s BMR AHFResidential Housing Mitigation Program Strategy HE‐ 2.3.2 Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con74 PC 2-27-2024 74 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HOUSING AFFORDABILITY Strategy HE‐ 2.3.3 Below Market‐Rate (BMR) Affordable Housing Fund (AHF) The City’s BMR AHF will continue to support affordable housing projects, strategies and services, including but not limited to: • BMR Program Administration • Substantial rehabilitation • Land acquisition • Acquisition of buildings for permanent affordability, with or without rehabilitation• New construction • Preserving “at‐risk” BMR units • Rental operating subsidies • Down payment assistance • Land write‐downs • Direct gap financing • Fair housing The City will target a portion of the BMR AHF to benefit extremely lowincome households and persons with special needs (such as the elderly, victims of domestic violence, and the disabled, including persons with developmental disabilities), to the extent that these target populations are found to be consistent with the needs identified in the nexus study the City prepares to identify the connection, or “nexus” between new developments and the need for affordable housing. To ensure the mitigation fees continue to be adequate to mitigate the impacts of new development on affordable housing needs, the City will update its Nexus Study for the Housing Mitigation Plan by the end of 2015 Community Development – Housing BMR AHF IM Nexus study updated in 2015 and 2020. Details about the use of the BMR AHF are reviewed and approved by the Housing Commission and the City Council. In 2022, the BMR program served 21 new renters and 4 new homeowners. The City provided $50,000 in BMR AHF to Project Sentinel for tenant landlord counseling and dispute and worked on 125 Cupertino cases. The City continued to maintain the BMR AHF, and provided ongoing technical assistance to nonprofits/developers, including providing data and information on properties for sale to nonprofit partners and developers for their consideration. The Cityʹs FY 23‐24 BMR AHF Request for Proposal (RFP) was open November 2022‐ February 2023. In 2023, the BMR AHF provided funding to the following affordable housing projects, strategies, and services: •BMR Program Administration ‐ 4 BMR ownership resales and 13 BMR rental turnovers •Fair housing services ‐ $50,000 to Project Sentinel •$126,397.42 to the Homeless Jobs Program HOUSING AFFORDABILITY Strategy HE‐ 2.3.4 Housing Resources Cupertino residents and developers interested in providing affordable housing in the City have access to a variety of resources administered by other agencies. The City will continue to provide information on housing resources and services offered by the County and other outside agencies. These include, but are not limited to: • Mortgage Credit Certificate (MCC) – Santa Clara County Housing and Community Development Department. • First‐Time Homebuyer Assistance and Developer Loans for Multi‐Family Development ‐ Housing Trust Silicon Valley (HTSV). • Housing Choice Vouchers (Section 8) ‐ Housing Authority of Santa Clara County (HASCC). • Affordable housing development Community Development – Housing None Required Con. No action is required at this time. Information and technical assistance continues to be provided by City Staff and Rise Housing Solution, BMR program administrator. HOUSING AFFORDABILITY Strategy HE‐ 2.3.5 Surplus Properties for Housing The City will explore opportunities on surplus properties as follows: *Work with local public agencies, school districts and churches to identify surplus properties or underutilized properties that have the potential for residential development. *Encourage long–term land leases of properties from churches, school districts, and corporations for construction of affordable units. *Evaluate the feasibility of developing special housing for teachers or other employee groups on the surplus properties. *Research other jurisdictions housing programs for teachers for their potential applicability in Cupertino. Community Development – Housing BMR AHF Con. Housing staff reviewing opportunities on an ongoing basis. FY 19‐20, FY 20‐21, and FY 21‐22 work program item‐ evaluate feasability of affordable development on City owned sites (10301 Byrne Avenue and Mary Avenue) The City worked with local public agencies, school districts, and churches to identify surplus properties that have the potential for residential development. There were no surplus properties available from any school districts or churches for the City to pursue. The City continued to support the Rotating Safe Car Park (RSCP) program on church property. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con75 PC 2-27-2024 75 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HOUSING AFFORDABILITY Strategy HE‐ 2.3.6 Incentives for Affordable Housing Development The City will continue to offer a range of incentives to facilitate the development of affordable housing. These include: *Financial assistance through the City’s BMR AHF and CDBG funds *Partner with CDBG and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME funds, Low income Housing Tax Credits (LIHTC), and mortgage revenue bonds. *Flexible development standards. *Technical assistance. *Waiver of park dedication fees and construction tax. *Parking ordinance waivers. *Expedited permit processing. The City joined the Santa Clara County HOME Consortium so that HOME funds for eligible affordable housing projects within the City of Cupertino are available beginning federal fiscal year 2015. Community Development – Housing and Planning BMR AHF, CDBG; HOME; General Fund Con. In 20222023, BMR AHF and CDBG funds were provided to the following: •CDBG ‐ $98,511.88088,966 to Rebuilding Together Silicon Valley, a low income housing repair and rehab program •CDBG‐ $222,971.72 to Vista Village Renovation Project, a low income affordable housing development. Also, participate in the Regional CDBG/ Housing Coordinators meetings and provided technical assistance to the public service agencies it funds. The City is a member of the Santa Clara County HOME Consortium and the Santa Clara County Consortium for State PLHA fun+Q231ds. HOUSING AFFORDABILITY Strategy HE‐ 2.3.7 Density Bonus Ordinance The City will encourage use of density bonuses and incentives, as applicable, for housing developments which include one of the following: *At least 5% of the housing units are restricted to very low income residents. *At least 10% of the housing units are restricted to lower income residents *At least 10 % of the housing units in a for–sale common interest development are restricted to moderate income residents. *The project donates at least 1 acre of land to the City or county large enough for 40 very low income units; the land has the appropriate general plan designation, zoning, permits, approvals, and access to public facilities needed for such housing; funding has been identified; and other requirements are met. A density bonus of up to 20% must be granted to projects that contain one of the following: *The project is a senior citizen housing development (no affordable units required). *The project is a mobile home park age restricted to senior citizens (no affordable units required). For projects that contain on–site affordable housing, developers may request one to three regulatory concessions, which must result in identifiable cost reductions and be needed to make the housing affordable. The City will update the density bonus ordinance as necessary to respond to future changes in State Law. Community Development – Planning and Housing None Required Con. Recent amendments (as of Sept. 2020) to state law required the city to amend the Density Bonus Ordinance in 2021. The City has approved projects which include Density Bonuses, Waivers and Incentives on four of the five 5th Cycle Priority Housing Sites. The City is additionally currently reviewing projects that proposed Density Bonus waivers on other sites. Every housing development with more than 5 units has utilitzed Density Bonus, waivers, incentives and parking reductions in some capacity. (1655 S. De Anza (Coachhouse ‐ 34 units), Bianchi Lane (7 townhomes)) Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con76 PC 2-27-2024 76 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HOUSING AFFORDABILITY Strategy HE‐ 2.3.8 Extremely Low‐ Income Housing and Housing for Persons with Special Needs The City will continue to encourage the development of adequate housing to meet the needs of extremely low–income households and persons with special needs (such as the elderly, victims of domestic violence, and the disabled, including persons with developmental disabilities). Specifically, the City will consider the following incentives: *Provide financing assistance using the BMR AHF and CDBG *Allow residential developments to exceed planned density maximums if they provide special needs housing and the increase in density will not overburden neighborhood streets or hurt neighborhood character. *Grant reductions in off–street parking on a case–by–case basis. *Partner with and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME finds, Low Income Housing Tax Credits( LIHTC), and mortgage revenue bond. Community Development – Housing BMR AHF; CDBG; HOME Con. Not an action item. The City continued to provide financing assistance using the BMR AHF and CDBG funds. The City coordinated with a number of groups to engage in discussions about grant funding opportunities, regional housing needs, and efforts to address homelessness. The City participated in the following groups: Santa Clara County PLHA Consortium, Regional CDBG/Housing Coordinators Group. The participants in these groups, including the City, work together to pool their knowledge and share expertise. The County’s Office of Supportive Housing helps to coordinate these efforts and provides the participants with invaluable technical assistance. Through the SCC PLHA Consortium, the City was awarded an allocation of PLHA funding and is currently working towards implementing the funding for projects in Cupertino. In addition, the City provides technical assistance to the public service agencies it funds. The City also participates in the Santa Clara County HOME Consortium. The City worked with nonprofits and developers to review the feasibility of residential uses on two potential affordable housing sites (Mary Avenue). The City issued an RFP (request for proposals) for the site and received interest from one developer. HOUSING AFFORDABILITY Strategy HE‐ 2.3.9 Employee Housing The City permits employee housing in multiple zoning districts. Pursuant to the State Employee Housing Act, any employee housing consisting of no more than 36 beds in a group quarters or 12 units or spaces designed for use by a single family or household shall be deemed an agricultural land use. No conditional use permit, zoning variance, or other zoning clearance shall be required of this employee housing that is not required of any other agricultural activity in the same zone. The permitted occupancy in employee housing in a zone allowing agricultural uses shall include agricultural employees who do not work on the property where the employee housing is located. The Employee Housing Act also specifies that housing for six or fewer employees be treated as a residential use. The City amended the Zoning Ordinance to be consistent with the State law in 2014 and will continue to comply with the Employee Housing Act where it would apply. Community Development – Planning None Required IM Completed in 2014. Zoning Code amended to be consistent with State Law. The City amended the zoning code in 2014 to allow employee housing in multiple zoning districts. In 2023, the City continued to implement the Cityʹs zoning code to allow employee housing in multiple zoning districts. The Zoning Ordinance is regularly updated to comply with state law. MAINTAINING EXISTING HOUSING STOCK Policy HE‐3.1 Housing Rehabilitation Pursue and/or provide funding for the acquisition/rehabilitation of housing that is affordable to very low–, low– and moderate–income households. Actively support and assist non–profit and for–profit developers in producing affordable units. Community Development – Housing BMR AHF; CDBG; HOME Con. Not an action item. In 20222023, CDBG funds were provided to the following residential rehabilitation efforts: •CDBG ‐ $98,511.880 to Rebuilding Together Silicon Valley, a low income housing repair and rehab program •CDBG‐ $222,971.72 to Vista Village Renovation Project, a low income affordable housing development. MAINTAINING EXISTING HOUSING STOCK Policy HE‐3.2 Maintenance and Repair Assist lower–income homeowners and rental property owners in maintaining and repairing their housing units. Community Development – Housing BMR AHF; CDBG; HOME Con. Not an action item. In 20222023, CDBG funds were provided to the following residential rehabilitation efforts: •CDBG ‐ $98,511.880 to Rebuilding Together Silicon Valley, a low income housing repair and rehab program •CDBG‐ $222,971.72 to Vista Village Renovation Project, a low income affordable housing development. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con77 PC 2-27-2024 77 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment MAINTAINING EXISTING HOUSING STOCK Policy HE‐3.3 Conservation of Housing Stock The City’s existing multi–family units provide opportunities for households of varied income levels. Preserve existing multi–family housing stock by preventing the net loss of multi–family housing units in new development and the existing inventory of affordable housing units that are at risk of converting to market–rate housing. Community Development – Housing BMR AHF; CDBG; HOME Con. Not an action item. MAINTAINING EXISTING HOUSING STOCK Strategy HE‐ 3.3.1 Residential Rehabilitation The City will continue to: *Utilize its BMR AHF and CDBG funds to support residential rehabilitation efforts in the community. These include: Acquisition/rehabilitation of rental housing and Rehabilitation of owner–occupied housing. *Provide assistance for home safety repairs and mobility/accessibility improvements to income–qualified owner–occupants using CDBG funds. The focus of this strategy is on the correction of safety hazards. *Partner with and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME funds, Low Income Housing Tax Credits (LIHTC), and mortgage revenue bonds. Community Development – Housing BMR AHF; CDBG; HOME Con. Not an action item. In 20222023, CDBG funds were provided to the following residential rehabilitation efforts: •CDBG ‐ $98,511.880 to Rebuilding Together Silicon Valley, a low income housing repair and rehabilitation program program that assisted 4 low‐income Cupertino households. •CDBG‐ $222,971.72 to Vista Village Renovation Project, a low income affordable housing development. MAINTAINING EXISTING HOUSING STOCK Strategy HE‐ 3.3.2 Preservation of At‐ Risk Housing Units One housing project – Beardon Drive (eight units) – is considered at risk of converting to market–rate housing during the next ten years. The City will proactively contact the property owner regarding its intent to remain or opt out of the affordable program. In the event, the project becomes a risk of converting to market–rate housing, the City will work with the property owner or other interested non–profit housing providers to preserve the units. The City will also conduct outreach to the tenants to provide information on any potential conversion and available affordable housing assistance programs. The City will continue to monitor its entire portfolio of affordable housing for–sale and rental inventory annually. The City will monitor its affordable for–sale inventory by ordering title company lot books, reviewing property profile reports and updating its public database annually. The City will monitor its affordable rental income certifications for each BMR tenant. The City records a Resale Restriction Agreement against each affordable BMR for–sale units and Regulatory Agreement for BMR rental units to help ensure long–term affordability. To help further preserve the City’s affordable housing stock, the City may consider providing assistance to rehabilitate and upgrade the affordable unit as well. Community Development – Housing BMR AHF; CDBG; HOME Con. Not an action item. Several units coming up on expiration of their deed restrictions. Can there be an incentive to retain them in the BMR pool?In the event the project becomes at risk of converting to market‐rate housing, the City will work with the property owner or other interested nonprofit housing providers to preserve the eight units. In 2019, as part of the BMR AHF program, the owner of Beardon Drive paid off the Cityʹs CDBG loan and indicated that the 8 units making up the property would continue to operate as affordable housing. MAINTAINING EXISTING HOUSING STOCK Strategy HE‐ 3.3.3 Condominium Conversion The existing Condominium Conversion Ordinance regulates the conversion of rental units in multi–family housing development in order to preserve the rental housing stock. Condominium conversions are not allowed if the rental vacancy rate in Cupertino and adjacent areas is less than 5% at the time of application for conversion and has average 5% over the past six months. The City will continue to monitor the effectiveness of this ordinance in providing opportunities for homeownership while preserving a balanced housing stock with rental housing. Community Development – Planning None Required Con. Not an action item. The City continued to monitor the effectiveness of this ordinance by providing opportunities for homeownership while preserving a balanced housing stock with rental housing. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con78 PC 2-27-2024 78 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment MAINTAINING EXISTING HOUSING STOCK Strategy HE‐ 3.3.4 Housing Preservation Program When a proposed development or redevelopment of a site would cause a loss of multi–family housing, the City will grant approval only if: *The project will comply with the City’s BMR program *The number of units provided on the site is at least equal to the number of existing units; and *Adverse impacts on displaced tenants, in developments with more than four units, are mitigated. In addition, indirect displacement may be caused by factors such as increased market rents as areas become more desirable. The City will participate, as appropriate, in studies of regional housing need and displacement, and consider policies and programs to address the indirect displacement of lower income residents as appropriate. Community Development – Planning and Housing None Required Con. Not an action item. In 2016, the Hamptons project was required to provide relocation assistance to the displaced tenants in the existing units. City must comply with state law and federal requirements on relocation assistance to displaced tenants as projects are proposed/constructed. MAINTAINING EXISTING HOUSING STOCK Strategy HE‐ 3.3.5 Neighborhood and Community Clean‐up Campaigns The City will continue to encourage and sponsor neighborhood and community clean–up campaigns for both public and private properties. Community DevelopmentPublic Works – Environmental Programs General Fund Con. Not an action item. The City continued to encourage and sponsor neighborhood and community clean‐up campaigns for both public and private properties. The City promotes and staffs the following events available to the community: •Recology provides quarterly drop‐off events for bulky items, construction waste, landscape waste, and hazardous waste (due to COVID, the quarterly events were cancelled and resumed in mid‐2021). •The City staffs two annual creek clean ups‐ National River Clean Up Day and Coastal Clean Up Day. SUSTAINABLE HOUSING DEVELOPMENT Policy HE‐4.1 Energy and Water Conservation Encourage energy and water conservation in all existing and new residential development. Community Development – Building and Planning None Required Con. Not an action item. Implemented via Strategies HE‐4.1.1 & HE‐ 4.1.2 SUSTAINABLE HOUSING DEVELOPMENT Strategy HE‐ 4.1.1 Enforcement of Title 24 The City will continue to enforce Title 24 requirements for energy conservation and will evaluate utilizing some of the other suggestions as identified in the Environmental Resources/Sustainabililty Element. Community Development – Building None Required Con. Not an action item. Implemented through the Municipal Code. The City continued to enforce Title 24 requirements for energy conservation and evaluate using some of the other suggestions as identified in the Environmental Resources/Sustainability element. In 2020, the City adopted REACH codes, which were further amended in 2022, that will assist in achieving the Cityʹs sustainability goals. The City has Chapter 16.58, Green Building Standards Code, that requires certain projects to achieve LEED certification or similar. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con79 PC 2-27-2024 79 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment SUSTAINABLE HOUSING DEVELOPMENT Strategy HE‐ 4.1.2 Sustainable Practices The City will continue to implement the Landscape Ordinance for water conservation and the Green Building Ordinance (adopted in 2013) that applies primarily to new residential and non–residential development, additions, renovations, and tenant improvements of ten or more units. To further the objectives of the Green Building Ordinance, the City will evaluate the potential to provide incentives, such as waiving or reducing fees, for energy conservation improvements at affordable housing projects (existing or new) with fewer than ten units to exceed the minimum requirements of the CA Green Building Code. This City will also implement the policies in its climate action plan to achieve residential–focused greenhouse gas emission reductions and further these community energy and water conservation goals. Community Development – Planning and Building None Required Con. Not an action item. Implemented through the Municipal Code. The City continued to the implement the Landscape Ordinance, Green Building Ordinance, and the Cityʹs Climate Action Plan, including evaluating the potential to provide incentives for energy conservation improvements at affordable housing projects (e.g. waiving or reducing fees,) and continue to implement the policies in the climate action plan. Continue to implement the Energy efficiency reach codes that include requirements for electrification for certain types of buildings, water efficiency, and green materials to reduce energy use and lower greenhouse gas emissions. These codes include reach codes which are a component of the California Energy and California Green Building Codes and include requirements for water efficiency, green materials, and other items designed to encourage building electrification for certain types of buildings. LOWER‐INCOME AND SPECIAL NEEDS HOUSING Policy HE‐5.1 Lower‐Income and Special Needs Households Support organizations that provide services to lower–income households and special needs households in the City, such as the homeless, elderly, disabled and single parent households. Community Development – Housing None BMR AHF; CDBG; HSG Con.Not an action item. Implemented via Strategies HE‐5.1.1 & HE‐ 5.1.2 LOWER‐INCOME AND SPECIAL NEEDS HOUSING Strategy HE‐ 5.1.1 Emergency Shelters The City will continue to facilitate housing opportunities for special needs persons by allowing emergency shelters as a permitted use in the “BQ” Quasi–Public zoning district. The City will subject emergency shelters to the same development standards as other similar uses within the BQ zoning district, except for those provisions permitted by State Law and provided in the Zoning Ordinance for emergency shelters. Community Development – Planning None Required Con. Not an action item. The City continued to facilitate housing opportunities for special‐needs groups by allowing emergency shelters as a permitted use in the ʺBQʺ Quasi‐ Public Building zoning district. In 2021, the City established the City Unhoused Task Force to address the needs of unhoused residents through resource referral and partnered with the West Valley Rotating Safe Car Park (RSCP) program. The RSCP program is an emergency homeless program made up of a network of local city governments, service organizations, and volunteer faith‐based host sites that provide temporary overnight parking for homeless individuals/families living out of their cars. The RSCP program is still active, and there is a maximum of 30 people at a time per safe parking site. The same year, the City created a pilot Homeless Jobs Program with two Cupertino unhoused residents participating in the program. The RSCP, Unhoused Task Force, and Homeless Jobs Program continued in 2023. The City Work Program is renewed on an annual basis by the City Council, and contains a variety of different projects, one of which being the City Plan To End Homelessness. The City Council did not prioritize the Plan To End Homelessness for the FY 2023‐25 City Work Program. This item was concluded, and no final version of the Plan was created. Unused funds will be returned to the General Fund. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con80 PC 2-27-2024 80 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment LOWER‐INCOME AND SPECIAL NEEDS HOUSING Strategy HE‐ 5.1.2 Supportive Services for Lower‐Income Households and Persons with Special Needs The City will continue to utilize its BMR AHF, CDBG and General Fund Human Service Grants (HSG) funds to provide for a range of supportive services. Community Development – Housing BMR AHF; CDBG; HSG Con. In 2022, BMR AHF, CDBG, and HSG funds were provided to the following: •HSG‐ $10,000 to Catholic Charities of Santa Clara County, a long‐term care ombudsman program •HSG‐ $25,000 to MAITRI, a transitional housing direct client services program •HSG‐ $15,000 to Senior Adult Legal Assistance, a legal assistance to elders program; •HSG ‐ $65,780 to Haven to Home, a West Valley Community Services Program In 2023, the City took various steps to provide supportive services for lower‐income households and persons with special needs, including: •Continuing the City Unhoused Task Force to address the needs of unhoused residents. •CDBG $21,405.76 to Live Oak Adult Day Services, a senior adult day care. •CDBG $38,054.69 to West Valley Community Services (WVCS) CARE Program, a community access to resource and education program. •HSG $10,000 to Catholic Charities of Santa Clara County, a long‐term care ombudsman program. •HSG $25,000 to Maitri, a transitional housing direct client services program. •HSG $15,000 to Senior Adult Legal Assistance, a legal assistance to elders program. •HSG $65,780 to WVCS Haven to Home program, a supportive services and housing resources program for the homeless. •The City continued to oversee the WVCS Homeless Jobs Program which provides up to eight months of employment LOWER‐INCOME AND SPECIAL NEEDS HOUSING Strategy HE‐ 5.1.3 Rotating Homeless Shelter The City will continue to support the operation of a Rotating Homeless Shelter program.Community Development – Housing None Required Con. No action is required at this time. In 2023, the City continued partnering with the Rotating Safe Car Park (RSCP) program. The RSCP program is an emergency homeless program made up of a network of local city governments, service organizations, and volunteer faith‐based host sites that provide temporary overnight parking for homeless individuals/families living out of their cars. In addition, through $65,780 in CDBG funding to the WVCS Haven To Home Program, the City assisted 79 households by providing services to prevent homelessness. FAIR HOUSING Policy HE‐6.1 Housing Discrimination The City will work to eliminate on a citywide basis all unlawful discrimination in housing with respect to age, race, sex, sexual orientation, marital or familial status, ethnic background. medical condition, or other arbitrary factors, so that all persons can obtain decent housing. Community Development – Housing BMR AHF; CDBG Con. Implemented via Strategies HE‐6.1.1. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con81 PC 2-27-2024 81 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment FAIR HOUSING Strategy HE‐ 6.1.1 Fair Housing Services The City will continue to: *Provide fair housing services, which include outreach, education, counseling, and investigation of fair housing complaints. *Retain a fair housing service provider to provide direct services for residents, landlords and other housing professionals. *Coordinate with efforts of the Santa Clara County Fair Housing Consortium to affirmatively further fair housing. *Distribute fair housing materials produced by various organizations at public counters and public events Community Development – Housing BMR AHF; CDBG Con. Continue to provide fair housing services including outreach, education, counseling, and investigation of fair housing complaints. In 2022, $50,000 in BMR AHF funds were provided to Project Sentinel, for Fair Housing & Tenant Landlord Counseling & Dispute Resolution Services (125 cases).The City continued to provide fair housing services including outreach, education, counseling, and investigation of fair housing complaints. In 2023, BMR AHF funds were provided to the following fair housing services: •$50,000 to Project Sentinel, a landlord/tenant rental mediation program and fair housing program. LOCAL AND REGIONAL COORDINATION Policy HE‐7.1 Coordination with Local School Districts The Cupertino community places a high value on the excellent quality of education provided by the three public school districts which serve residents. To ensure the long–term sustainability of the schools in tandem with the preservation and development of vibrant residential areas, the City will continue to coordinate with the CUSD, FHUSD, and SCUSD. Community Development – Planning None Required Con. Not an action item. All development projects are forwarded for review to the school districts. LOCAL AND REGIONAL COORDINATION Policy HE‐7.2 Coordination with Regional Efforts to Address Housing‐ Related Issues Coordinate efforts with regional organizations, including ABAG and the BAAQMD, as well as neighboring jurisdictions, to address housing and related quality of life issues (such as air quality and transportation). Community Development – Housing and Planning None Required Con. Staff participated in regional coordination efforts with the now concluded RHNA process with regional planning staff to represent local views. Staff continues to coordinate LOCAL AND REGIONAL COORDINATION Policy HE‐7.3 Public‐Private Partnerships Promote public‐private partnerships to address housing needs in the community, especially housing for the workforce. Community Development – Planning and Housing None Required Con. Not an action item. LOCAL AND REGIONAL COORDINATION Strategy HE‐ 7.3.1 Coordination with Outside Agencies and Organizations The City recognizes the importance of partnering with outside agencies and organizations in addressing local and regional housing issues. These may include, but are not limited to, the following: *School districts *Housing providers *Neighboring jurisdictions *ABAG *BAAQMD *Housing Trust Silicon Valley *Santa Clara County Fair Housing Consortium *Santa Clara County Continuum of Care (COC) *Housing Authority of Santa Clara County (HASCC) *VTA Specifically, the City will meet with these agencies/organizations periodically to discuss the changing needs, development trends, alternative approaches, and partnering opportunities. Community Development – Planning and Housing None Required Con. Not an action item. Continued coordination with regional agencies and non‐profits. The City coordinated with these groups to engage in discussions about grant funding opportunities, regional housing needs, and efforts to address homelessness. The City participated in the following groups: Santa Clara County PLHA Consortium, Regional CDBG/Housing Coordinators Group, and the US Department of Housing and Urban Development, among others. The participants in these groups, including the City, work together to pool their knowledge and share expertise. The County’s Office of Supportive Housing helps to coordinate these efforts and provides the participants with invaluable technical assistance. Through the SCC PLHA Consortium, the City was awarded an allocation of PLHA funding and is currently working towards implementing the funding for projects in Cupertino. The City Council did not prioritize the Plan To End Homelessness for the Fiscal Year 2023‐25 City Work Program. This item was concluded, and no final version of the Plan was created. The unused funds will be returned to the General Fund. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con82 PC 2-27-2024 82 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment REGIONAL COORDINATION Policy M‐1.1 Regional Transportation Planning Participate in regional transportation planning processes to develop programs consistent with the goals and policies of Cupertino’s General Plan and to minimize adverse impacts on the City’s circulation system. Work with neighboring cities to address regional transportation and land use issues of mutual interest. Public Works – Transportation General Fund Con.Not an action item. Coordination with neighboring cities and regional agencies is active and ongoing. REGIONAL COORDINATION Policy M‐1.2 Transportation Impact Analysis Participate in the development of new multi–modal analysis methods and impact thresholds as required by Senate Bill 743. However, until such impact thresholds are developed, continue to optimize mobility for all modes of transportation while striving to maintain the following intersection Levels of Service (LOS) at a.m. and p.m. peak traffic hours: *Major intersections: LOS D *Stevens Creek Boulevard and De Anza Boulevard: LOS E+ *Stevens Creek Boulevard and Stelling Road: LOD E+ *De Anza Boulevard and Bollinger Road: LOS E+ Public Works – Transportation General Fund IM Transportation Analysis Guidelines have been developed for both CEQA and non‐CEQA evaluation of transportation impacts of land development per the requirements of SB 743. LOS standards in GP need to be evaluated in terms of VMT impact in order to be consistent with SB 743 REGIONAL COORDINATION Policy M‐1.3 Regional Trail Development Continue to plan and provide for a comprehensive system of trails and pathways consistent with regional systems, including the Bay Trail, Stevens Creek Corridor and Ridge Trail. Public Works – Development Services and Transportation None Required Con. No action requried at this time. Implemented through the Bike/Ped Master Plans. COMPLETE STREETS Policy M‐2.1 Street Design Adopt and maintain street design standards to optimize mobility for all transportation modes including automobiles, walking, bicycling and transit. Public Works – Development Services and Transportation General Fund Con. Not an action item. In 2023, Environmental Programs staff suggests modifying existing GP language to add references to Green Stormwater Infrastructure. COMPLETE STREETS Policy M‐2.2 Adjacent Land Use Design roadway alignments, lane widths, medians, parking and bicycle lanes, crosswalks and sidewalks to complement adjacent land uses in keeping with the vision of the Planning Area. Strive to minimize adverse impacts and expand alternative transportation options for all Planning Areas (Special Areas and Neighborhoods). Improvement standards shall also consider the urban, suburban and rural environments found within the City. Public Works – Transportation and Development Services General Fund Con. Not an action item. Reviewed in conjunction with development review. COMPLETE STREETS Strategy M‐ 2.2.1 Rural Road Improvement Standards Consider candidate rural roads and develop specific street improvement standards that preserve the rural character of these streets. Rural roads would typically feature natural landscaping, no sidewalks and narrow unpaved shoulders. Public Works – Transportation and Development Services General Fund Con.Not an action item. Implemented in cooperation with neighborhoods at their request. COMPLETE STREETS Strategy M‐ 2.2.2 Semi–rural Road Improvements Standards Consider candidate semi–rural roads where curb and gutter improvements, and no sidewalks, are appropriate. Public Works – Transportation and Development Services General Fund Con. Not an action item. Implemented in cooperation with neighborhoods at their request. COMPLETE STREETS Strategy M‐ 2.2.3 Urban Road Improvement Standards Develop urban improvement standards for arterials such as Stevens Creek and De Anza Boulevards. In these areas, standards may include wide sidewalks, tree wells, seating, bike racks and appropriate street furniture. Public Works – Transportation and Development Services General Fund Con.Not an action item. Reviewed in conjunction with development review. COMPLETE STREETS Strategy M‐ 2.2.4 Suburban Road Improvement Standards Develop suburban road improvement standards for all streets not designated as rural, semi‐rural or in the Crossroads Area. Public Works – Transportation and Development Services General Fund Con. Not an action item. Reviewed in conjunction with development review. COMPLETE STREETS Policy M‐2.3 Connectivity Promote pedestrian and bicycle improvements that improve connectivity between planning areas, neighborhoods and services, and foster a sense of community. Public Works – Transportation and Development Services General Fund Con. Not an action item. Implemented through the Bike/Ped Master Plans. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con83 PC 2-27-2024 83 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment COMPLETE STREETS Policy M‐2.4 Community Impacts Reduce traffic impacts and support alternative modes of transportation rather than constructing barriers to mobility. Do not close streets unless there is a demonstrated safety or over–whelming through traffic problem and there are no acceptable alternatives since street closures move the problem from one street to another. Public Works – Transportation and Development Services General Fund Con.Not an action item. Ongoing implementation through Safe Routes to School and other programs. COMPLETE STREETS Policy M‐2.5 Public Accessibility Ensure all new public and private streets are publicly accessible to improve walkability and reduce impacts on existing streets. Public Works – Transportation and Development Services General Fund Con. Not an action item. Reviewed in conjunction with development review. COMPLETE STREETS Policy M‐2.6 Traffic Calming Consider the implementation of best practices on streets to reduce speeds and make them user–friendly for alternative modes of transportation, including pedestrians and bicyclists. Public Works – Transportation and Development Services General Fund Con. FY 19/20 Work Plan Item. Traffic calming program funded and ongoing. WALKABILITY AND BIKEABILITY Policy M‐3.1 Bicycle and Pedestrian Master Plan Adopt and maintain a Bicycle and Pedestrian Master Plan, which outlines policies and improvements to streets, extension of trails, and pathways to create a safe way for people of all ages to bike and walk on a daily basis, and as shown in Figure M‐1. Public Works – Transportation General Fund IM Master Plan is completed and ongoing maintenance of these plans will be performed. Implementation ongoing through the Capital Improvement Program. Projects of note include: Regnart Creek Trail, McClellan Separated bike lane phase 3, and De Anza Blvd Buffered bike lane project. WALKABILITY AND BIKEABILITY Policy M‐3.2 Development Require new development and redevelopment to increase connectivity through direct and safe pedestrian connections to public amenities, neighborhoods, shopping and employment destinations throughout the City. Community Development – Planning; Public Works – Transportation and Development Services General Fund Con. Not an action item. Reviewed in conjunction with development review. WALKABILITY AND BIKEABILITY Policy M‐3.3 Pedestrian and Bicycle Crossings Enhance pedestrian and bicycle crossings and pathways at key locations across physical barriers such as creeks, highways and road barriers. Public Works – Transportation General Fund Con. Not an action item. Implemented through the Bike/Ped Master Plans. WALKABILITY AND BIKEABILITY Policy M‐3.4 Street Widths Preserve and enhance citywide pedestrian and bike connectivity by limiting street widening purely for automobiles as a means of improving traffic flow. Public Works – Transportation General Fund Con. Not an action item. WALKABILITY AND BIKEABILITY Policy M‐3.5 Curb Cuts Minimize the number and the width of driveway openings. Community Development – Planning; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with development review. WALKABILITY AND BIKEABILITY Strategy M‐ 3.5.1 Shared Driveway Access Encourage property owners to use shared driveway access and use shared driveway access and interconnected roads within blocks, where feasible. Require driveway access closures, consolidations or both when a site is remodeled or redeveloped. Community Development – Planning; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with development review. WALKABILITY AND BIKEABILITY Strategy M‐ 3.5.2 Direct Access from Secondary Streets Encourage property with frontages on major and secondary streets to provide direct access to driveways from the secondary street. Community Development – Planning; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with development review. WALKABILITY AND BIKEABILITY Policy M‐3.6 Safe Spaces for Pedestrians Require parking lots to include clearly defined paths for pedestrians to provide a safe path to building entrances. Community Development – Planning None Required Con. Not an action item. Reviewed in conjunction with development review. WALKABILITY AND BIKEABILITY Policy M‐3.7 Capital Improvement Program Plan for improvements to pedestrian and bicycle facilities and eliminate gaps along the pedestrian and bicycle network as part of the City’s Capital Improvement Program. Public Works – Transportation and Capital Improvements Capital Improvement Fund Con.Not an action item. Implemented through the Capital Improvement Program. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con84 PC 2-27-2024 84 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment WALKABILITY AND BIKEABILITY Policy M‐3.8 Bicycle Parking Require new development and redevelopment to provide public and private bicycle parking. Community Development – Planning; Public Works – Development Services None Required Con. Not an action item. Implemented through the Municipal Code. WALKABILITY AND BIKEABILITY Policy M‐3.9 Outreach Actively engage the community in promoting walking and bicycling through education, encouragement and outreach on improvement projects and programs. Public Works – Transportation General Fund Con. Not an action item. Implemented through the Cityʹs Safe Routes to School program, Sustainability and other mobility programs. WALKABILITY AND BIKEABILITY Policy M‐3.10 Quarry Operations Prioritize enforcement of truck speeds from Stevens Creek and the Lehigh Cement Plan on Stevens Canyon Road, and Stevens Creek and Foothill Boulevards. Santa Clara County Sheriff’s Department General Fund Con. Not an action item. Ongoing implementation and coordination with Sheriff Department. TRANSIT Policy M‐4.1 Transit Agencies Coordinate with VTA to improve transportation service, infrastructure and access in the City, and to connect to transportation facilities such as Caltrain and VTA light rail stations. Public Works – Transportation None Required Con. Not an action item. Ongoing coordination. TRANSIT Policy M‐4.2 Local Transportation Services Create or partner with transit providers, employers, education institutions, and major commercial entities to minimize gaps within local transportation services. Public Works – Transportation General Fund IM VIA shuttle service was successful between Oct 2019 and March 2020. Service suspended due to COVID‐19 pandemic in March 2020. Service resumed in late 2021. City received an $8.5 million grant in 2022 in partnership with the City of Santa Clara to expand and operate the Via service for 4 years. TRANSIT Policy M‐4.3 Connecting Special Areas Identify and implement new or enhanced transit services to connect all Special Areas as identified in Figure PA‐1 (Chapter 2: Planning Areas) Public Works – Transportation General Fund IM VIA shuttle service was successful between Oct 2019 and March 2020. Service suspended due to COVID‐19 pandemic. Service resumed in late 2021. City received an $8.5 million grant in 2022 partnership with the City of Santa Clara to expand and operate the Via service for 4 years. TRANSIT Policy M‐4.4 Transit Facilities with New Development Work with VTA and/or major developments to ensure all new development projects include amenities to support public transit including bus stop shelters, space for transit vehicles as appropriate and attractive amenities such as trash receptacles, signage, seating and lighting. Community Development – Planning; Public Works – Transportation and Development Services None Required Con. Not an action item. Reviewed in conjunction with development review. TRANSIT Policy M‐4.5 Access to Transit Services Support right–of–way design and amenities consistent with local transit goals to improve transit as a viable‐way design and amenities consistent with local transit goals to improve transit as a viable alternative to driving. Community Development – Planning; Public Works – Development Services, Transportation and Capital Improvement Program Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with development review. TRANSIT Policy M‐4.6 Bus and Shuttle Programs Work with large regional employers and private commuter bus/shuttle programs to provide safe pick–up, drop‐off, and park and rides in order to reduce single occupancy vehicle trips. Public Works – Transportation General Fund Con. Not an action item. Ongoing coordination. TRANSIT Policy M‐4.7 Vallco Shopping District Transfer Station Work with VTA and/or other transportation service organizations to study and develop a transit transfer station that incorporates a hub for alternative transportation services such as, car sharing, bike sharing and/or other services. Public Works – Transportation None Required Con. Coordination with VTA has been active and ongoing, including active participation with SR 85 PAB and the Transit Guideway Study. SAFE ROUTES TO SCHOOL Policy M‐5.1 Safe Routes to Schools Promote Safe Routes to Schools programs for all schools serving the City.Public Works – Transportation General Fund Con.Not an action item. Ongoing implementation through the Cityʹs Safe Routes to School program. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con85 PC 2-27-2024 85 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment SAFE ROUTES TO SCHOOL Policy M‐5.2 Coordination with School Districts Coordinate with the School Districts to develop plans and programs that encourage car/van–pooling, stagger hours of adjacent schools, establish drop‐off locations, and encourage walking and bicycling to school. Public Works – Transportation None Required Con. Not an action item. Ongoing implementation through the Cityʹs Safe Routes to School program. SAFE ROUTES TO SCHOOL Strategy M‐ 5.2.1 Teen Commission Encourage the Teen Commission to work with schools to encourage year–round programs to incentivize walking and biking to school. Public Works – Transportation General Fund Con. Not an action item. SAFE ROUTES TO SCHOOL Policy M‐5.3 Prioritizing Projects Ensure that bicycle and pedestrian safety improvements include projects to enhance safe accessibility to schools. Public Works – Transportation General Fund Con. Not an action item. Ongoing implemented through the Bike/Ped Master Plans, Safe Routes to School Program and Capital Improvement Program. SAFE ROUTES TO SCHOOL Policy M‐5.4 Connections to Trails Connect schools to the citywide trail system.‐Connect schools to the citywide trail system.Public Works – Transportation General Fund Con. Not an action item. Ongoing implemented through the Bike/Ped Master Plans, Safe Routes to School Program and Capital Improvement Program. SAFE ROUTES TO SCHOOL Policy M‐5.5 Education Support education programs that promote safe walking and bicycling to schools.Public Works – Transportation General Fund Con. Not an action item. Implemented through the Cityʹs Safe Routes to School program. VEHICLE PARKING Policy M‐6.1 Parking Codes Maintain efficient and updated parking standards to ensure that development provides adequate parking, both on–street and off–street, depending on the characteristics of the development, while also reducing reliance on the automobile. Community Development – Planning General Fund Con. Not an action item. Implemented through the Municipal Code. VEHICLE PARKING Policy M‐6.2 Off–street Parking Ensure new off–street parking is properly designed and efficiently used.Community Development – Planning None Required Con.Not an action item. Reviewed in conjunction with development review. TRANSPORTATION IMPACT ANALYSIS Policy M‐7.1 Multi–Modal Transportation Impact Analysis Follow guidelines set by the VTA related to transportation impact analyses, while conforming to State goals for multi‐modal performance targets. Public Works – Transportation None Required IM Transportation Analysis Guidelines have been developed for both CEQA and non‐CEQA evaluation of transportation impacts of land development, in conformance with SB 743. TRANSPORTATION IMPACT ANALYSIS Policy M‐7.2 Protected Intersections Consider adopting a Protected Intersection Policy, which would identify intersections where improvements would not be considered, which would degrade the levels of service for non–vehicular modes of transportation. Potential locations include intersections in Priority Development Areas (PDAs) and other areas where non–vehicular transportation is a key consideration, such as, near shopping districts, schools, parks and senior citizen developments. Public Works – Transportation General Fund IM Transportation Analysis Guidelines have been developed for both CEQA and non‐CEQA evaluation of transportation impacts of land development, in conformance with SB 743. GREENHOUSE GAS EMISSIONS AND AIR QUALITY Policy M‐8.1 Greenhouse Gas Emissions Promote transportation policies that help to reduce greenhouse gas emissions.City Manager – Sustainability Programs None Required Con. Not an action item. Implemented through various mobility and sustainability program ‐ Bike to Work Day etc. GREENHOUSE GAS EMISSIONS AND AIR QUALITY Policy M‐8.2 Land Use Support development and transportation improvements that help reduce greenhouse gas emissions by reducing per capita VMT, reducing impacts on the City’s transportation network and maintaining the desired levels of service for all modes of transportation. Community Development – Planning; Public Works – Transportation None Required Con. Transportation Analysis Guidelines have been developed for both CEQA and non‐CEQA evaluation of transportation impacts of land development, in conformance with SB 743. GREENHOUSE GAS EMISSIONS AND AIR QUALITY Policy M‐8.3 Transportation Systems Management (TSM) Programs Employ TSM strategies to improve efficiency of the transportation infrastructure including strategic right–of–way improvements, intelligent transportation systems and optimization of signal timing to coordinate traffic flow. Public Works – Transportation General Fund Con. Not an action item. Ongoing implementation. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con86 PC 2-27-2024 86 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment GREENHOUSE GAS EMISSIONS AND AIR QUALITY Policy M‐8.4 Transportation Demand Management (TDM) Programs Require large employers, including colleges and schools, to develop and maintain TDM programs to reduce vehicle trips generated by their employees and students and develop a tracking method to monitor results. Community Development – Planning; Public Works – Transportation None Required Con. Not an action item. Reviewed in conjunction with development review. GREENHOUSE GAS EMISSIONS AND AIR QUALITY Policy M‐8.5 Design of New Developments Encourage new commercial development to provide shared office facilities, cafeterias, daycare facilities, lunchrooms, showers, bicycle parking, home offices, shuttle buses to transit facilities and other amenities that encourage the use of transit, bicycling or walking as commute modes to work. Provide pedestrian pathways and orient buildings to the street to encourage pedestrian activity. Community Development – Planning; Public Works – Transportation None Required Con. Not an action item. Reviewed in conjunction with development review. GREENHOUSE GAS EMISSIONS AND AIR QUALITY Policy M‐8.6 Alternative Fuel Charging Stations Develop a city–wide strategy to encourage the construction of a network of public and private alternative fuel vehicle charging/fueling stations. City Manager – Sustainability Programs General Fund LR In 20222023, the City moved forward the following efforts: (1) Sustainability Division completed the update to the Climate Action Plan, which sets strategies and actions to increase adoption of zero‐emission vehicles, (2) in partnership with CDD, brought forward an ordinance to streamline EV charging station permitting processes, (3) in partnership with CDD, brought forward an update to the building codes including local amendments requiring additional electric vehicle charging stations, (4) in partnership with Public Works, developed an RFP to seek out additional EV charging stations on City properties.. ROADWAY SYSTEM EFFICIENCY Policy M‐9.1 Efficient Automobile Infrastructure Strive to maximize the efficiency of existing infrastructure by locating appropriate land uses along roadways and retrofitting streets to be accessible for all modes of transportation. Community Development – Planning; Public Works – Transportation General Fund Con. Not an action item. ROADWAY SYSTEM EFFICIENCY Policy M‐9.2 Reduced Travel Demand Promote effective TDM programs for existing and new development. Public Works – Transportation; Community Development – Planning General Fund Con. Not an action item. Reviewed in conjunction with development review. ROADWAY SYSTEM EFFICIENCY Policy M‐9.3 Street Width Except as required by environmental review for new developments, limit widening of streets as a means of improving traffic efficiency and focus instead on operational improvements to preserve community character. Public Works – Transportation General Fund Con. Not an action item. Reviewed in conjunction with development review. Ongoing implementation through traffic signal modernization and synchronization efforts. ROADWAY SYSTEM EFFICIENCY Strategy M‐ 9.3.1 Wolfe Road Overcrossing Consider alternate designs for the Wolfe Road/Interstate 280 Interchange (e.g. from partial cloverleaf design to diamond design) when evaluating the need to widen the freeway overcrossing. Public Works – Transportation General Fund IM Project to design widening this freeway overcrossing is underway. Alternatives evaluated and partial cloverleaf was preferred alternative. Beginning of construction of reconstructed interchange anticipated Summer 2024. ROADWAY SYSTEM EFFICIENCY Strategy M‐ 9.3.2 Streetscape Design When reviewing the widening of an existing street, consider aesthetically pleasing enhancements and amenities to improve the safe movement of pedestrians and bicyclists in keeping with the vision of the Planning Area. Public Works – Transportation None Required Con. Not an action item. Implemented with the Captial Improvement Program and development review. TRANSPORTATION INFRASTRUCTURE Policy M‐10.1 Transportation Improvement Plan Develop and implement an updated citywide transportation improvement plan necessary to accommodate vehicular, pedestrian and bicycle transportation improvements to meet the City’s needs. Public Works – Transportation General Fund IM Action completed through development of Bike and Ped Master Plans and a Transportation Impact Fee project list. City Attorneyʹs Office to consider update to Traffic Impact Fee program in partnership with Transportation Division. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con87 PC 2-27-2024 87 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment TRANSPORTATION INFRASTRUCTURE Policy M‐10.2 Transportation Impact Fee Ensure sustainable funding levels for the Transportation Improvement Plan by enacting a transportation impact fee for new development. Public Works – Transportation General Fund IM Action completed. TIF adopted in late 2017. TIF update paused in 2021. City Attorneyʹs Office to consider further update to Traffic Impact Fee program in partnership with Transportation Division. TRANSPORTATION INFRASTRUCTURE Policy M‐10.3 Multi–Modal Improvements Integrate the financing, design and construction of pedestrian and bicycle facilities with street projects. Build pedestrian and bicycle improvements at the same time as improvements for vehicular circulation to enable travelers to transition from one mode of transportation to another (e.g. bicycle to bus). Public Works – Transportation and Capital Improvements Capital Improvement Fund Con.Not an action item. Implemented with the Captial Improvement Program and development review. TRANSPORTATION INFRASTRUCTURE Policy M‐10.4 Roadway Maintenance Funding Identify and secure new funding sources to fund the on‐going routine maintenance of roadways. Public Works – Transportation, Development Services and Capital Improvement Program Capital Improvement Fund/Grants Con.Grant funding routinely used to fund on‐going maintenance to the extent possible. PLANNING AND REGIONAL TRANPORTATION Policy ES‐1.1 Principles of Sustainability Incorporate the principles of sustainability into Cupertino’s planning, infrastructure and development process in order to improve the environment, reduce greenhouse gas emissions, and meet the needs of the community without compromising the needs of future generations. City Manager – Sustainability Programs; Commuity Development – Planning; General Fund Con. Not an action item. This item is executed with distinct projects as directed by Council, for example adopting all‐electric reach codes. In 2021, Council authorized waiving fees for certain landscaping projects that conserve water. PLANNING AND REGIONAL TRANPORTATION Strategy ES‐ 1.1.1 Climate Action Plan (CAP) Adopt, implement and maintain a Climate Action Plan to attain greenhouse gas emission targets consistent with state law and regional requirements. This qualified greenhouse gas emissions reduction plan, by BAAQMD’s definition, will allow for future project CEQA streamlining and will identify measures to: *Reduce energy use through conservation and efficiency; *Reduce fossil fuel use through multi–modal and alternative transportation; *Maximize use of and, where feasible, install renewable energy resources; *Increase citywide water conservation and recycled water use; *Accelerate Resource Recovery through expanded recycling, composting, extended producer responsibility and procurement practices; *Promote and incentivize each of those efforts to maximize community participation and impacts; and *Integrate multiple benefits of green infrastructure with climate resiliency and adaptation. City Manager – Sustainability Programs General Fund IM Action completed. CAP adopted in 2016. Climate Action Plan is being updated in FY 20/21 to address a path toward carbon neutrality as well as adding a climate adaptation component. In August 2022, Council adopted the Climate Action Plan 2.0 which targets a carbon‐neutral City by 2040 or eariler. The CAP 2.0 also includes tools to facilitiate GHG analysis under CEQA by creating GHG thresholds of significance, as well as checklists that can be used by developers to align compliance with the Cupertino GHG reduction plan according to California Air Resources Board guidelines. PLANNING AND REGIONAL TRANPORTATION Strategy ES‐ 1.1.2 CAP and Sustainability Strategies Implementation Periodically review and report on the effectiveness of the measures outlined in the CAP and the strategies in this Element. Institutionalize sustainability by developing a methodology to ensure all environmental, social and lifecycle costs are considered in project, program, policy and budget decisions. City Manager – Sustainability Programs General Fund IM Action completed in 2018. Revising again in CAP update in FY 20/21 fiscal year. After adoption of CAP 2.0 in August 2022, the Sustainability Division is developing an implementation plan to consult with all departments with the aim to incorporate the updated Climate Action Plan actions into City operations. The Council also authorized budget to support an interactive, visual dashboard to facilitiate action tracking within the City and also to improve transparency for the public. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con88 PC 2-27-2024 88 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment PLANNING AND REGIONAL TRANPORTATION Strategy ES‐ 1.1.3 Climate Adaptation and Resiliency Conduct a climate vulnerability assessment and set preparedness goals and strategies to safeguard human health and community assets susceptible to the impacts of a changing climate (e.g. increased drought, wildfires, flooding). Incorporate these into all relevant plans, including the Emergency Preparedness Plan, Local Hazard Mitigation Plan, Dam Failure Plan, Climate Action Plan, Watershet Protection Plan and Energy Assuredness Plan. City Manager – Sustainability Programs General Fund IM Action Completed in 2015. In 2022, the Sustainbility team created a draft Climate Vulnerability Assessment which is summarized within the adopted CAP 2.0. PLANNING AND REGIONAL TRANPORTATION Policy ES‐1.2 Regional Growth and Transportation Coordination Periodically review and report on the effectiveness of the measures outlined in the CAP and the strategies in this Element. Institutionalize sustainability by developing a methodology to ensure all environmental, social and lifecycle costs are considered in project, program, policy and budget decisions. City Manager – Sustainability Programs General Fund Con. Ongoing effort with the Sustainability Commission and annual reports to City Council. PLANNING AND REGIONAL TRANPORTATION Strategy ES‐ 1.2.1 Local Plan Consistency with Regional Plans Update and maintain local plans and strategies so they are consistent with One Bay Area Plan to qualify for State transportation and project CEQA streamlining. Community Development – Planning; Public Works – Transportation General Fund Con. Not an action item. Reviewed when local plans are updated. ENERGY SUSTAINABILITY Policy ES‐2.1 Conservation and Efficient Use of Energy Resources Encourage the maximum feasible conservation and efficient use of electrical power and natural gas resources for new and existing residences, businesses, industrial and public uses. City Manager – Sustainability Programs None Required IM Adopted a reach code in 2019 which brings Cupertino above and beyond the state energy code for requiring all‐electric construction in most cases. Updated in 2022 with local amendments to the California Energy Code.Cupertino’s local reach code was re‐adopted during the 2022 building code update. ENERGY SUSTAINABILITY Strategy ES‐ 2.1.1 Coordination Continue to evaluate, and revise as necessary, applicable City plans, codes and procedures for inclusion of Federal, State and regional requirements and conservation targets. City Manager – Sustainability Programs General Fund Con. Not an action item. Reviewed when local plans are updated. The next major opportunity to evaluate City procedures is to update the Environmental Purchasing Policy. The next major opportunity to evaluate codes is the next Statewide code cycle beginning in calendar year 2022. With the adoption of the CAP 2.0, the Sustainability Division is underway with an implementation planning process that will identify needed updates to City policies and procedures. The August 2022 legislation from the Federal and State governments present opportunity over the next 5‐10 years for new funding sources to come to Cupertino to support sustainability efforts. ENERGY SUSTAINABILITY Strategy ES‐ 2.1.2 Comprehensive Energy Management Prepare and implement a comprehensive energy management plan for all applicable municipal facilities and equipment to achieve the energy goals established in the City’s Climate Action Plan. Track the City’s energy use and report findings as part of the CAP reporting schedule. Embed this plan into the City’s Environmentally Preferable Procurement Policy to ensure measures are achieved through all future procurement and construction practices. City Manager – Sustainability Programs General Fund IM The City developed and released a public‐facing and internal‐ facing set of dashboards that are updated in real time to display energy and water consumption at key facilities. A series of automated reports alerts staff to consumption trends and high usage alarms. The Cityʹs energy management efforts identify increased cost exposure to City budgets from increases in water and energy rates. A number of dashboards are available to staff in order to provide information to better manage energy and water use across City assets. Ongoing effort informed by use of software designed for utility data analysis. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con89 PC 2-27-2024 89 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment ENERGY SUSTAINABILITY Startegy ES‐ 2.1.3 Energy Efficient Replacements Continue to use life cycle cost analysis to identify City assets for replacement with more energy efficient technology. Utilize available tools to benchmark and showcase city energy efficiency achievements (i.e. EPA Portfolio Manager, statewide Green Business Program). City Manager – Sustainability Programs General Fund Con. This is not an action item and occurs on a continual basis. Cost analysis has identified the most energy‐intensive and water‐ intensive sites, and the Sustainability Division works with the Capital Improvements and Facilities teams to plan for retrofits. ENERGY SUSTAINABILITY Strategy ES‐ 2.1.4 Incentive Program Consider incentive programs for projects that exceed mandatory requirements and promote incentives from state, county and federal governments for improving energy efficiency and expanding renewable energy installations. City Manager – Sustainability Programs General Fund IM This is an ongoing action. The City actively participates in development and promotion of regional incentive programs in partnership with BayREN, Silicon Valley Clean Energy, and the ABAG POWER natural gas purchasing collective. The Federal and State governments have committed significant resources to funding and technical assistance for sustainability efforts for local communities. The Sustainability Division is working to increase capacity and awareness so all Departments have resources needed to access these funds. ENERGY SUSTAINABILITY Strategy ES‐ 2.1.5 Urban Forest Encourage the inclusion of additional shade trees, vegetated stormwater treatment and landscaping to reduce the “heat island effect” in development projects. City Manager – Sustainability Programs None Required Con. Not an action item. Reviewed in conjunction with project review. Heat Island effect is addressed in the Cityʹs reach code and green building ordinance which goes beyond the state requirements. The CAP 2.0 adopted in August 2022 includes an action to create an Urban Canopy Management Plan which will include a study on additional shade trees. ENERGY SUSTAINABILITY Strategy ES ‐ 2.1.6 Alternate Energy Sources Promote and increase the use of alternate and renewable energy resources for the entire community through effective policies, programs and incentives. City Manager – Sustainability Programs General Fund Con. Not an action item. ENERGY SUSTAINABILITY Strategy ES ‐ 2.1.7 Energy Co–generation Systems Encourage the use of energy co–generation systems through the provision of an awareness program targeting the larger commercial and industrial users‐generation systems through the provision of an awareness program targeting the larger commercial and industrial users and public facilities. City Manager – Sustainability Programs None Required Con. Not an action item. ENERGY SUSTAINABILITY Stratagy ES‐ 2.1.8 Energy Audits and Financing Continue to offer and leverage regional partners’ programs to conduct energy audits and/or subvention programs for homes, commercial, industrial and city facilities, and recommend improvements that lead to energy and cost savings opportunities for participants and encourage adoption of alternative energy technologies. Encourage energy audits to include emerging online and application–based energy analytics and diagnostic tools. Share residential and commercial energy efficiency and renewable energy financing tools through outreach events and civic media assets. City Manager – Sustainability Programs General Fund Con. Not an action item. ENERGY SUSTAINABILITY Strategy ES‐ 2.1.9 Energy Efficient Transportation Modes Continue to encourage fuel–efficient transportation modes such as alternative fuel vehicles, driverless vehicles, public transit, car and van–pooling community and regional shuttle systems, car and bike sharing programs, safe routes to schools, communter benefits, and pedestrian and bicycle paths through infrastructure investment, development incentives, and community education. City Manager – Sustainability Programs; Public Works – Transportation General Fund IM Cityʹs VIA Shuttle program began operation in 2019. The cityʹs own alternative commute program also began operation in August 2019 and has paused due to COVID risk. The VIA Shuttle program was reinitiated in late 2021. The Pilot program ends in June 2023. Staff has secured $8.465M in grant funding to expand program in partnership with adjacent jurisdictions. ENERGY SUSTAINABILITY Strategy ES‐ 2.1.10 Community Choice Energy Collaborate with regional partners to evaluate feasibility for development of a Community Choice Energy Program. City Manager – Sustainability Programs General Fund N/A Action Completed. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con90 PC 2-27-2024 90 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment SUSTAINABLE BUILDINGS Policy ES‐3.1 Green Building Design Set standards for the design and construction of energy and resource conserving/efficient building.City Manager – Sustainability Programs General Fund N/A Action Completed. Implemented through the Municipal Code. SUSTAINABLE BUILDINGS Strategy ES‐ 3.1.1 Green Building Program Periodically review and revise the City’s Green Building ordinance to ensure alignment with CALGreen requirements for all major private and public projects that ensure reduction in energy and water use for new development through site selection and building design. Community Development – Building and Planning General Fund Con. Ongoing operational practice by City staff. SUSTAINABLE BUILDINGS Strategy ES‐ 3.1.2 Staff Training Continue to train appropriate City staff in the design principles, costs and benefits of sustainable building and landscape design. Encourage City staff to attend external trainings on these topics and attain relevant program certifications (e.g. Green Point Rater, LEED Accredited Professional). City Manager – Sustainability Programs General Fund Con. Ongoing operational practice by City staff. SUSTAINABLE BUILDINGS Strategy ES‐ 3.1.3 Green Building Informational Seminars Conduct and participate in Green Building informational seminars and workshops for members of the design and construction industry, land development, real estate sales, lending institutions, landscaping and design, the building maintenance industry and prospective project applicants. City Manager – Sustainability Programs General Fund Con. Annual activity in partnership with BayREN SUSTAINABLE BUILDINGS Strategy ES‐ 3.1.4 Green Building Demonstration Pursue municipal facility retrofits through a Green Capital Improvement Program (CIP), and new construction projects that exceed CALGreen and achieve third–party certification criteria (e.g. LEED, Living Building Challenge, Zero Net Energy) as a means of creating demonstration spaces for developer and community enrichment. City Manager – Sustainability Programs Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review. AIR QUALITY Policy ES‐4.1 New Development Minimize the air quality impacts of new development projects and air quality impacts that affect new development. Community Development – Planning; Public Works – Capital Improvement Program None Required Con. Implement with Strategies ES‐4.1.1 and ES‐4.1.2 AIR QUALITY Strategy ES‐ 4.1.1 Toxic Air Contaminants Continue to review projects for potential generation of toxic air contaminants at the time of approval and confer with BAAQMD on controls needed are uncertain. Community Development – Planning; Public Works – Capital Improvement Program None Required Con. Not an action item. Reviewed in conjunction with project review. In October 2021, the Council adopted a new Chapter in the Municipal Code to implement regulations requiring all projects to comply with recommendations and requirements from BAAQMD for air quality contaminants. AIR QUALITY Strategy ES‐ 4.1.2 Dust Control Continue to require water application to non–polluting dust control measures during demolition and the duration of the construction period. Community Development – Building; Public Works – Development Services and Capital Improvement Program None Required Con. Not an action item. Reviewed in conjunction with project review. In October 2021, the Council adopted a new Chapter in the Municipal Code to implement regulations requiring all projects to comply with recommendations and requirements from BAAQMD for air quality contaminants during construction. AIR QUALITY Strategy ES‐ 4.1.3 Planning Ensure that land use and transportation plans support air quality goals. Community Development – Planning; Public Works – Transportation None Required IM The City adoped a Vehicle Miles Traveled policy and thresholds in 2021. These help provide the City with tools to address carbon emissions from transportation and align the City with stateʹs goals. AIR QUALITY Policy ES‐4.2 Existing Development Minimize the air quality impacts of existing development.City Manager ‐ Sustainability Programs None Required Con. Sustainability division is promoting regional programs to incentivize switching from gas to electric appliances, which directly reduces air quality impacts of natural gas combustion in homes and businesses. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con91 PC 2-27-2024 91 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment AIR QUALITY Strategy ES‐ 4.2.1 Public Education Program Establish a citywide public education program providing information on ways to reduce and control emissions; and continue to provide information about alternative commutes, carpooling and restricting exacerbating activities on “Spare the Air” high–emissions days. City Manager – Sustainability Programs General Fund Con. Spare the Air alerts sent out and posted on City website. Cityʹs VIA Shuttle program commenced on Oct. 29, 2019. The VIA Shuttle program was reinitiated in late 2021. Staff has secured $8.465M in grant funding to expand program in partnership with adjacent jurisdictions. AIR QUALITY Strategy ES‐ 4.2.2 Home Occupations Review and consider expanding the allowable home–based businesses in residential zoned properties to reduce the need to commute to work. Community Development – Planning General Fund LR No action has been taken with regard to this strategy. AIR QUALITY Strategy ES‐ 4.2.3 Tree Planting in Private Development Review and enhance the City’s tree planting and landscaping program and requirements for private development to reduce air pollution levels. Community Development – Planning General Fund LR No action has been taken with regard to this strategy. Consideration of trees as beneficial to air quality is regulated under CMC 14.18. AIR QUALITY Strategy ES‐ 4.2.4 Fuel–efficient Vehicles and Use Prioritize the purchase, replacement and on–going use of fuel–efficient and low polluting City fleet vehicles. Update applicable policies and programs to require life cycle cost analyses and include alternative fueling infrastructure review and related funding allocations. Update the Vehicle Use Policy and pursue fleet management best practices to support fuel conservation, scheduled maintenance and fleet fuel tracking. Pursue available grant funding to offset the cost of implementing these programs. Public Works – Service Center General Fund Con. Public Works looks to replace internal combustion engine (ICE) vehicles with hybrids or electric vehicles, and implements elements of the Climate Action Plan (CAP). 19% of eligible city vehicles have been converted to electric or hybrid drives. Starting 2024, at least 50% of new vehicle purchases will be non‐ emmissions vehicles. AIR QUALITY Strategy ES‐ 4.2.5 Point Sources of Emissions Continue to seek the cooperation of the BAAQMD to monitor emissions from identified point sources that impact the community. In addition, for sources not within the regulatory jurisdiction of the City, seek cooperation from the applicable regulatory authority to encourage reduction of emissions and dust from the point source. City Manager – Sustainability None Required Con. Ongoing monitoring for the Lehigh Plant being conducted by BAAQMD. The IT and Sustainability teams partnered in 2022 to deploy some additional air quality monitoring stations, as well as a baseline air quality study, which are in the process of developing visuals and alerts for the public. However, these monitors were removed in 2023 as part of the budget reduction. AIR QUALITY Policy ES‐4.3 Use of Open Fires and Fireplaces Discourage high pollution fireplace use.City Manager ‐ Sustainability Programs None Required Con. Implement with Strategies ES‐4.3.1 and ES‐4.3.2. Sustainability commission has recommended an all‐electric building reach code for new construction, which would directly reduce air quality impacts associated with combustion of natural gas in new buildings, including fireplaces. New construction electrification code adopted. AIR QUALITY Strategy ES‐ 4.3.1 Education Continue to make BAAQMD literature on reducing pollution from fireplace use available.City Manager ‐ Sustainability Programs None Required Con. Not an action item. AIR QUALITY Strategy ES‐ 4.3.2 Fireplaces Continue to prohibit new wood–burning fireplaces, except EPA certified wood stoves as allowed by the Building Code. Community Development – Building None Required Con. Not an action item. Sustainability commission has recommended an all‐electric building reach code for new construction, which would directly reduce air quality impacts associated with combustion of natural gas in new buildings, including fireplaces. New construction electrification code adopted. URBAN AND RURAL ECOSYSTEMS Policy ES‐5.1 Urban Ecosystem Manage the public and private development to ensure the protection and enhancement of its urban ecosystem. Public Works – Capital Improvement Program and Park Improvement; Community Development – Planning None Required Con. Not an action item. Implement with underlying strategies. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con92 PC 2-27-2024 92 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment URBAN AND RURAL ECOSYSTEMS Strategy ES‐ 5.1.1 Landscaping Ensure that the City’s tree planting, landscaping and open space policies enhance the urban ecosystem by encouraging medians, pedestrian–crossing curb–extensions planting that is native, drought–tolerant, treats stormwater and enhance urban plant, aquatic and animal resources in both, private and public development. Public Works – Capital Improvement Program, Service Center, Park Improvement, Environmental Programs, and Development Services; Community Development – Planning; General Fund Con. Not an action item. 2022 ‐ Environmental Programs staff suggests modifying existing GP language to add references to Green Stormwater Infrastructure. URBAN AND RURAL ECOSYSTEMS Strategy ES‐ 5.1.2 Built Environment Ensure that sustainable landscaping design is incorporated in the development of City facilities, parks and private projects with the inclusion of measures such as tree protection, stormwater treatment and planting of native, drought tolerant landscaping that is beneficial to the environment. Public Works – Capital Improvement Program, Service Center Park Improvement, and Development Services; Community Development – Planning; Capital Improvement Fund Con. Not an action item. Reviewed in conjunction with project review. The Cityʹs green building ordinance as well as California green building standards contains measures for water‐efficient landscaping and other sustainabile landscaping measures as conditions of obtaining a building permit where applicable. 2022 ‐ Environmental Programs staff suggests modifying existing GP language to add references to Green Stormwater Infrastructure. URBAN AND RURAL ECOSYSTEMS Policy ES‐5.2 Development Near Sensitive Areas Encourage the clustering of new development away from sensitive areas such as riparian corridors, wildlife habitat and corridors, public open space preserves and ridgelines. New developments in these areas must have a harmonious landscaping plan approved prior to development. Community Development – Planning None Required Con.Not an action item. Reviewed in conjunction with project review. URBAN AND RURAL ECOSYSTEMS Strategy ES‐ 5.2.1 Riparian Corridor Protection Require the protection of riparian corridors through the development approval process. Community Development – Planning; Public Works – Development Services None Required Con.Not an action item. Reviewed in conjunction with project review. URBAN AND RURAL ECOSYSTEMS Policy ES‐5.3 Landscaping In and Near Natural Vegetation Preserve and enhance existing natural vegetation, landscaping features and open space when new development is proposed within existing natural areas. When development is proposed near natural vegetation, encourage the landscaping to be consistent with the palate of vegetation found in the natural vegetation. Community Development – Planning; Public Works – Capital Improvement Program and Park Improvement None Required/ Capital Improvement Program Con. Not an action item. Reviewed in conjunction with project review. The City Council adopted the Green Infrastructure Plan in September 2019 which prioritizes design features of public CIP projects that promote stormwater retention, infiltration, and capture of pollution runoff. URBAN AND RURAL ECOSYSTEMS Strategy ES‐ 5.3.1 Native Plants Continue to emphasize the planting of native, drought tolerant, pest resistant, non–invasive, climate appropriate plants and ground covers, particularly for erosion control and to prevent disturbance of the natural terrain. Public Works – Environmental Programs; Community Development – Planning None Required Con. Not an action item. Implemented through the Municipal Code. The Cityʹs demonstration garden at City Hall is an educational resource for citizens interested in providing natural and drought‐resistent landscaping for their own property. Sustainability division staff also promotes regional incentive programs to remove turf and replace with native landscaped alternatives. URBAN AND RURAL ECOSYSTEMS Strategy ES‐ 5.3.2 Hillsides Minimize lawn area in the hillsides. Community Development – Planning; Public Works – Development Services None Required Con. Not an action item. Implemented through the Municipal Code. Also implemented by regulations in the newly adopted Urgency Ordinance related to implementation of SB 9 requirements. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con93 PC 2-27-2024 93 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment URBAN AND RURAL ECOSYSTEMS Policy ES‐5.4 Hillside Wildlife Migration Confine fencing on hillside property to the area around a building, rather than around an entire site, to allow for migration of wild animals. Community Development – Planning None Required Con. Not an action item. Implemented through the Municipal Code. URBAN AND RURAL ECOSYSTEMS Policy ES‐5.5 Recreation and Natural Vegetation Limit recreation in natural areas to activities compatible and appropriate with preserving natural vegetation, such as hiking, horseback riding, mountain biking and camping. Public Works – Park Improvement, Parks and Recreation ‐ Business Services and Outdoor Recreation & Youth Development None Required Con. Not an action item. Implemented through the Capital Improvement Program and the Municipal Code. URBAN AND RURAL ECOSYSTEMS Policy ES‐5.6 Recreation and Wildlife Provide open space linkages within and between properties for both recreation and wildlife activities, most specifically for the benefit of wildlife that is threatened, endangered or designated as species of special concern. Community Development – Planning None Required Con.Not an action item. Reviewed in conjunction with project review. URBAN AND RURAL ECOSYSTEMS Strategy ES‐ 5.6.1 Creek and Water Course Identification Require identification of creeks, water courses and riparian areas on site plans and require that they be protected from adjacent development. Community Development – Planning; Public Works – Development Services None Required Con.Not an action item. Reviewed in conjunction with project review. URBAN AND RURAL ECOSYSTEMS Strategy ES‐ 5.6.2 Trail Easements Consider requiring easements for trail linkages if analysis determines that they are needed. Community Development – Planning; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. MINERAL RESOURCES Policy ES‐6.1 Mineral Resource Areas Cooperatively work with Santa Clara County to ensure that plans for restoration and mining operations at Lehigh Hanson and Stevens Creek quarries consider environmental impacts and mitigations. City Manager; Public Works None Required Con. Not an action item. Comments and review conducted as and when projects are proposed. MINERAL RESOURCES Strategy ES‐ 6.1.1 Public Participation Strongly encourage Santa Clara County to engage with the affected neighborhoods when considering changes to restoration plans and mineral extraction activity.City Manager None Required Con. Not an action item. Comments and review conducted as and when projects are proposed. MINERAL RESOURCES Strategy ES‐ 6.1.2 Recreation in Depleted Mining Areas Consider designating abandoned quarries for passive recreation to enhance plant and wildlife habitat and rehabilitate the land. Community Development – Planning None Required Con. Not an action item. Reviewed in conjunction with project review. WATER Policy ES‐7.1 Natural Water Bodies and Drainage Systems In public and private development use Low Impact Development (LID) principles to manage stormwater by mimicking natural hydrology, minimizing grading and protecting or restoring natural drainage systems. Public Works – Development Services, Capital Improvement Program and Environmental Programs General Fund Con. Not an action item. Implemented through the Municipal Code. 2022 ‐ Environmental Programs staff suggests modifying existing GP language to add references to Green Stormwater Infrastructure. WATER Strategy ES‐ 7.1.1 Public and Private Development Plans Continue to require topographical information; identification of creeks, streams and drainage areas; and grading plans with development proposals to ensure protection and efficient use of water resources. Community Development – Planning; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con94 PC 2-27-2024 94 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment WATER Policy ES‐7.2 Reduction of Impervious Surfaces Minimize stormwater runoff and erosion impacts resulting from development and use Low Impact Development (LID) designs to treat stormwater or recharge groundwater. Public Works – Development Services and Environmental Programs None Required Con. Not an action item. Implemented through the Municipal Code. Implemented Hardscape Conversion Rebate Program in July 2019 through the Clean Water and Storm Protection Parcel Fee which passed by ballot measure in July 2019. Hardscape conversion rebate program eliminated in 2023 by Council vote due to extremely low community interest and only one successful rebate application. WATER Strategy ES‐ 7.2.1 Lot Coverage Consider updating lot coverage requirements to include paved surfaces such as driveways and on–grade pervious patios to incentivize the construction of pervious surfaces. Community Development – Planning; Public Works – Development Services and Environmental Programs General Fund LR The 2019 California Green Building Standards, as well as Cupertinoʹs local green building ordinance contains measures limiting the amount of impervious surface area for projects seeking a building permit where applicable. The Municipal Regional Permit requires storm drain from all impervious areas be treated through Low Impact Development standards. WATER Strategy ES‐ 7.2.2 Pervious Walkways and Driveways Encourage the use of pervious materials for walkways and driveways. If used on public and quasi‐public property, mobility and access for the disabled should take precedence. Community Development – Planning; Public Works – Development Services and Environmental Programs None Required Con. Not an action item. Reviewed in conjunction with project review. The City Council adopted the Green Infrastructure Plan in September 2019 which prioritizes design features of public CIP projects that promote stormwater retention, infiltration, and capture of pollution runoff. WATER Strategy ES‐ 7.2.3 Maximize Infiltration Minimize impervious surface areas, and maximize on–site filtration and the use of on–site retention facilities. Public Works – Development Services and Environmental Programs None Required Con. Not an action item. Implemented through the Municipal Code. Implemented Hardscape Conversion Rebate Program in July 2019 through the Clean Water and Storm Protection Parcel Fee which passed by ballot measure in July 2019. Hardscape conversion rebate program eliminated in 2023 by Council vote due to extremely low community interest and only one successful rebate application. WATER Policy ES‐7.3 Pollution and Flow Impacts Ensure that surface and groundwater quality impacts are reduced through development review and voluntary efforts. Public Works – Development Services and Environmental Programs None Required Con. Not an action item. Implemented through the Municipal Code. WATER Strategy ES‐ 7.3.1 Development Review Require LID designs such as vegetated stormwater treatment systems and green infrastructure to mitigate pollutant loads and flows. Public Works – Development Services, Capital Improvement Program and Environmental Programs None Required Con. Not an action item. Implemented through the Municipal Code. WATER Strategy ES‐ 7.3.2 Creek Clean Up Encourage volunteer organizations to help clean creek beds to reduce pollution and help return waterways to their natural state. Public Works – Environmental Programs None Required Con. Not an action item. Volunteer creek clean up activities organized and conducted in conjunction with City Staff support 4‐6 times per year. WATER Policy ES‐7.4 Watershed Based Planning Review long–term plans and development projects to ensure good stewardship of watersheds.Public Works – Environmental Programs None Required Con. Implement through Strategies ES‐7.4.1, ES‐7.4.2 and ES‐7.4.3 WATER Strategy ES‐ 7.4.1 Storm Drainage Master Plan Develop and maintain a Storm Drainage Master Plan which identifies facilities needed to prevent “10–year” event street flooding and “100–year” event structure flooding and integrate green infrastructure to meet water quality protection needs in a cost effective manner. Public Works – Development Services and Environmental Programs General Fund IM Storm Drainage Master Plan updated Jan 2019. The City Council adopted the Green Infrastructure Plan in September 2019. As Capital Improvement projects are developed, inclusion of stormwater retention features will be evaluated. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con95 PC 2-27-2024 95 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment WATER Strategy ES‐ 7.4.2 Watershed Management Plans Work with other agencies to develop broader Watershed Management Plans to model and control the City’s hydrology. Public Works – Development Services and Environmental Programs None Required Con. Not an action item. Onging coordination. WATER Strategy ES‐ 7.4.3 Development Review development plans to ensure that projects are examined in the context of impacts on the entire watershed, in order to comply with the City’s non‐point source Municipal Regional Permit. Public Works – Development Services and Environmental Programs None Required Con. Not an action item. Implemented through the Municipal Code and reviewed in conjunction with project review. WATER Policy ES‐7.5 Groundwater Recharge Sites Support the SCVWD efforts to find and develop groundwater recharge sites within Cupertino and provide public recreation where possible. Public Works – Development Services None Required Con. Not an action item. Ongoing coordination. WATER Policy ES‐7.6 Other Water Sources Encourage the research of other water sources, including water reclamation.City Manager ‐ Sustainability Programs None Required LR City has been working with SCVWD regarding the expansion of reclaimed water systems through Cupertino. The City is looking into the feasibility of other reclaimed water options. Feasibility study recommended as a CWP item by Sustainability Commission for FY24‐25. WATER Policy ES‐7.7 Industrial Water Recycling Encourage industrial projects in cooperation with the Cupertino Sanitary District, to have long–term conservation measures, including recycling equipment for manufacturing and water supplies in the plant. City Manager ‐ Sustainability Programs None Required Con. Not an action item. WATER Policy ES‐7.8 Natural Water Courses Retain and restore creek beds, riparian corridors, watercourses and associated vegetation in their natural state to protect wildlife habitat and recreation potential and assist in groundwater percolation. Encourage land acquisition or dedication of such areas. Public Works – Capital Improvement Program and Development Services Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review. WATER Strategy ES‐ 7.8.1 Inter–Agency Coordination Work with the SCVWD and other relevant regional agencies to enhance riparian corridors and provide adequate flood control by use of flow increase mitigation measures, such as hydromofication controls as established by the Municipal Regional Permit. Public Works – Development Services None Required Con. Not an action item. Ongoing coordination and implementation through the Municipal Code. WATER Policy ES‐7.9 Inter–Agency Coordination for Water Conservation Continue to coordinate citywide water conservation and regional water supply problem solving efforts with the SCVWD, SJWC and CALWater. Public Works – Environmental Programs; City Manager – Sustainability None Required Con. Not an action item. Ongoing coordination. WATER Stratey ES‐7.9.1 Water Conservation Measures Implement water conservation measures and encourage the implementation of voluntary water conservation measures from the City’s water retailers and SCVWD. Public Works – Environmental Programs; City Manager – Sustainability, Community Development – Planning General Fund Con. Not an action item. Ongoing education/ coordination. The drought emergency continuesd in 20222023, with Cupertino facilities enacting water usage restrictions at all parks and City properties. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con96 PC 2-27-2024 96 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment WATER Policy ES‐7.10 Public Education Regarding Resource Conservation Provide public information regarding resource conservation. Public Works – Environmental Programs; City Manager – Sustainability General Fund Con. Not an action item. Ongoing education/ coordination. WATER Policy ES‐7.10.1 Outreach Continue to send educational information and notices to households and businesses with water prohibitions, water allocations and conservation tips. Continue to offer featured articles in the Cupertino Scene and Cupertino Courier. Consider providing Public Service Announcements on the City’s Channel and Cupertino Radio. Public Works – Environmental Programs; City Manager – Sustainability General Fund Con. Not an action item. Ongoing education/ coordination. In 2021, the City produced a new banner that was hung over Stevens Creek boulevard making residents aware of the Cityʹs drought resources and messaging. In 2022, the City sent postcards to all commercial and multifamily property owners notifying them of the Statewide restriction on watering non‐functional turf grass. In 2023, there were no direct mailing done, however, drought related resources available on the Cityʹs website. WATER Policy ES‐7.10.2 Demonstration Gardens Consider including water–wise demonstration gardens in some parks where feasible as they are re–landscaped or improved using drought tolerant native and non–invasive, and non–native plants. Public Works – Capital Improvement Program, Environmental Programs, and Service Center Capital Improvement Fund Con. Not an action item. Ongoing education/ coordination. Implemented at City Hall. The Cityʹs demonstration garden at City Hall is an educational resource for citizens interested in providing natural and drought‐resistent landscaping for their own property. The garden also saves the City significant water and maintenance expense. Sustainability division staff also promotes regional incentive programs to remove turf and replace with native landscaped alternatives. A ribbon cutting was hosted at City Hall for this demonstration garden in August 2019, and the City Staff created an online portal to increase the educational value of this resourse. cupertino.org/demogarden. Further opportunities will be evaluated with new projects. WATER Policy ES‐7.11 Water Conservation and Demand Reduction Measures Promote efficient use of water throughout the City in order to meet State and regional water use reduction targets. Public Works – Environmental Programs and Service Center; City Manager – Sustainability General Fund Con. Ongoing implementation of State and Regional intitatives regarding water conservation, as well as education/ coordination. Developed pilot programs such as the City Hall demonstration garden and the Climate Victory Gardens direct‐ install program. In 2023, Climate Victory Gardens not approved to continue due to budget. WATER Strategy ES‐ 7.11.1 Urban Water Management Plan Collaborate with water retailers serving the City in the preparation of their Urban Water Management Plan, including water conservation strategies and programs. Public Works – Environmental Programs, Service Center None Required Con. Not an action item. Ongoing coordination. WATER Srategy ES‐ 7.11.2 Water Conservation Standards Comply with State water conservation standards by either adopting the State standards or alternate standards that are equally efficient. Public Works – Environmental Programs and Service Center; Community Development – Building General Fund IM Action completed. The City of Cupertino adopted the 2019 update to the California Green Building Standards code, which contains mandatory measures for water conservation both inside buildings and in exterior landscaped areas. WATER Strategy ES‐ 7.11.3 Recycled Water System Continue to work with water retailers to promote and expand the availability of recycled water in the City for public and private use. Public Works – Development Services None Required Con. Not an action item. City has been working with SCVWD regarding the expansion of reclaimed water systems through Cupertino. Feasibility study recommended as a CWP item by Sustainability Commission for FY24‐25. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con97 PC 2-27-2024 97 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment WATER Strategy ES‐ 7.11.4 Recycled Water in Projects Encourage and promote the use of recycled water in public and private buildings, open space and streetscape planting. Public Works – Development Services, Capital Improvement Program and Park Improvement None Required Con. Not an action item. Reviewed in conjunction with project review. WATER Strategy ES‐ 7.11.5 On–site Recycled Water Encourage on‐site water recycling including rainwater harvesting and gray water use. Public Works – Development Services, Environmental Services, Capital Improvement Program and Park Improvement; City Manager – Sustainability Programs None Required Con. Not an action item. Reviewed in conjunction with project review. In 2023, the Sustainability Division concluded a pilot program which provided direct technical assistance promoting rainwater harvesting and gray water use. Program not being continued due to budget reductions. WATER Strategy ES‐ 7.11.6 Water Conservation Programs Benchmark and continue to track the City’s public and private municipal water use to ensure ongoing accountability and as a means of informing prioritization of future agency water conservation projects. City Manager – Sustainability Programs General Fund Con. Majority of large landscape accounts are in WaterFluence software which sets a water budget and reports for grounds team. Golf Course is a notable exception which is being addressed by Sustainability staff. In 2021, the City responded to the drought by producing a series of internal water use dashboards which were distributed on a regular basis to all facilities and grounds staff, informing them of trends for all the water use consumption billing history. The conservation and awareness efforts continue from the 2021 drought period. WATER Strategy ES‐ 7.11.7 Green Business Certification and Water Conservation Continue to support the City’s Green Business Certification goals of long–term water conservation within City facilities, vegetated stormwater infiltration systems, parks and medians, including installation of low–flow toilets and showers, parks, installation of automatic shut–off valves in lavatories and sinks and water efficient outdoor irrigation. Public Works – Environmental Services, Service Center, Capital Improvement Program, City Manager – Sustainability Programs, Community Development General Fund Con. Not an action item. Ongoing implementation through the Capital Improvement Program and Development Review and through the Cityʹs Green Business Program. In 2022, the City re‐ certified itʹs real estate portfolio as Certified Green Businesses, and is planning for additional ways to promote this program for all business properties in the City. This is a partnership with Economic Development, Sustainability Division, and the County of Santa Clara. REGIONAL COORDINATION Policy HS ‐ 1.1 Regional Hazard Risk Reduction Planning Coordinate with Santa Clara County and local agencies to implement the Multi‐Juridictional Local Hazard Mitigation Plan (LHMP) for Santa Clara County. City Manager – Emergency Services None Required Con. Not an action item. Cupertino coordinates with Santa Clara County OEM, who provides technical advice and support for implementation of the LHMP through monthly general meetings, as well as periodic LHMP specific trainings and guidance. The update to the Multijurisdictional Hazard Mitigation Plan (MJHMP) has been in progress since 2023 and anticipated to be adopted in 2024. REGIONAL COORDINATION Strategy HS ‐ 1.1.1 Monitoring and Budgeting Monitor and evaluate the success of the LHMP, including local strategies provided in Cupertino Annex (Section 11). Working with Santa Clara County, ensure that strategies are prioritized and implemented through the CIP and provide adequate budget for on–going programs and department operations. City Manager – Emergency Services None Required Con. Santa Clara County OEM contracts with a specialist to support both County and jurisdictional prioritization and implementation of strategies, and tracking of the program. CIP and budget are responsibility of each jurisdiction. OEM implemented projects from other city plans including CIP and CAP. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con98 PC 2-27-2024 98 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment REGIONAL COORDINATION Strategy HS ‐ 1.1.2 Mitigation Incorporation Ensure that mitigation actions identified in the LHMP are being incorporated into upcoming City sponsored projects, where appropriate. City Manager – Emergency Services General Fund Con. Not an action item. Santa Clara County OEMʹs strategic vision embraces the ʺWhole Communityʺ philosophy; providing each jurisdiction with on‐ going opportunity to engage in the LHMP process. Cupertino takes full advantage of these processes and is typically ʹat the tableʹ providing city‐level support, review, and feedback. REGIONAL COORDINATION Strategy HS‐ 1.1.3 Hazard Mitigation Plan Amendments and Updates Support Santa Clara County in its role as the lead agency that prepares and updates the LHMP. City Manager – Emergency Services General Fund Con. Not an Action Item. Ongoing coordination occuring. The Sustainable Communities Strategy (SCS) is in the process of being updated by MTC/ABAG. This document is considering support for sea walls and levees to protect the low levels in the Valley which would help protect infrastructure that provides services to Cupertino such as water treatment plant and land fills. REGIONAL COORDINATION Policy HS ‐ 1.2 Sea Level Rise Protection Ensure all areas in Cupertino are adequately protected for the anticipated effects of sea level rise. Public Works – Development Services and Capital Improvement Program General Fund Con. Not an Action Item. Ongoing coordination occuring. REGIONAL COORDINATION Strategy HS‐ 1.2.1 Monitor Rising Sea Level Regularly coordinate with regional, state, and federal agencies on rising sea levels in the San Francisco Bay and major tributaries to determine if additional adaptation strategies should be implemented to address flooding hazards. This includes monitoring FEMA flood map updates to identify areas in the City susceptible to sea level rise, addressing changes to state and regional sea and Bay level rise estimates, and coordinating with adjacent municipalities on flood control improvements as appropriate. Public Works – Development Services None Con. Not an Action Item. Ongoing coordination occuring. REGIONAL COORDINATION Strategy HS ‐ 1.2.2 Flood Insurance Rate Maps Provide to the public, as available, up–to–date Flood Insurance Rate Maps (FIRM) that identify rising sea levels and changing flood conditions. Public Works – Development Services General Fund Con. Not an Action Item. Ongoing coordination occuring. EMERGENCY PREPAREDNESS Policy HS ‐ 2.1 Promote Emergency Preparedness Distribute multi–hazard emergency preparedness information for all threats identified in the emergency plan. Information will be provided through Cardiopulmonary Resuscitation (CPR), First Aid and Community Emergency Response Team (CERT) training, lectures and seminars on emergency preparedness, publication of monthly safety articles in the Cupertino Scene, posting of information on the Emergency Preparedness website and coordination of video and printed information at the library. City Manger – Emergency Services General Fund Con. CPR, First Aid, and CERT classes provided by the Santa Clara County Fire Department (SCCFD). CERT training is communal for the seven cities served by SCCFD. The Cupertino Scene continues to feature articles on emergency preparedness, public safety, and community awareness. The Scene’s calendar section highlights upcoming emergency preparedness classes and events. Printed material is maintained in the lobby of City Hall and Quinlan Center. Advancements made in hazard awareness and information sharing on www.cupertino.org/emergency EMERGENCY PREPAREDNESS Policy HS ‐ 2.2 Emergency Operations and Training Ensure ongoing training of identified City staff on their functions/ responsibilities in the EOC and in disaster preparedness, first aid and CPR. City Manger – Emergency Services General Fund Con. Not an action item. Staff are trained every two years in CPR, with first aid training for Public Works. Staff is working on providing first aid training to all staff. EOC staff receive EOC training from the County and the City has started customized trainings in‐house as well. A full, localized EOC training program was implemented in 2023. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con99 PC 2-27-2024 99 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment EMERGENCY PREPAREDNESS Strategy HS ‐ 2.2.1 Emergency Operations Center (EOC) Review options to provide functional and seismic upgrades to the EOC facility at City Hall or explore alternative locations for the EOC. Public Works – Capital Improvement Program General Fund LR City Hall building is seismically deficient and does not meet “essential services” standards that are desired for an EOC. Schedule to improve the building to this standard is unknown. EOC functionality build‐out is continuing, including upgrading monitors, IT systems support improvements, replacement of chairs with safer alternatves, and evaluating replacement tables. Recent remodeling at the Service Center will make it more functional as the alternate site for the EOC. Torre Avenue Annex building is being considered for an alternative EOC location. EMERGENCY PREPAREDNESS Strategy HS ‐ 2.2.2 Employee Training Conduct regular exercises and participate in regional exercises to ensure that employees are adequately trained. City Manager – Emergency Services General Fund Con. Not an action item. The EOC partially exercises in accompaniment with the annual County EOC exercise (itself often part of a Bay Area regional exercise). With the turnover of senior staff and EOC staff, initial training is occuring to lead up to a City EOC exercise. Regular exercises and drills are conducted with City staff, including participation in the Bay Area regional exerices. In 2023, the City implemented an in‐ house exercise series to test the current EOP and develop recommendations for a 2024 EOP revision. EMERGENCY PREPAREDNESS Policy HS ‐ 2.3 Volunteer Groups Continue to encourage the ongoing use of volunteer groups to augment emergency services, and clearly define responsibilities during a local emergency. City Manager – Emergency Services None Required Con. Not an action item. Continue to support the Cupertino Citizen Corps (CCC) volunteer program and provide trainings and exercises. CCC helps build the Cityʹs response capabilities and designed to integrate with other City resources as appropriate. For example, CCC integrated with City employees during Public Safety Power Shutoff (PSPS) informational canvassing efforts in Oct. ʹ19 EMERGENCY PREPAREDNESS Strategy HS ‐ 2.3.1 Cupertino Citizen Corps Continue to support the Cupertino Amateur Radio Emergency Services (CARES), Community Emergency Response Team (CERT) and Medical Reserve Corp (MRC) programs to ensure the development of neighborhood based emergency preparedness throughout the City. Encourage ongoing cooperation with CERTs in other cities. City Manager – Emergency Services General Fund Con. Not an action item. The City supports training and resource requests from Cupertino Citizen Corps expanding coordination and communications capability during a disaster. CERT participates in countywide projects and exercises and regularly attends countywide CERT Leadership Team (CCLT) meetings. CARES regularly atends SCC RACES trainings, leadership meetings, and regular commnication exercises. MRC participates in regular trainings and City exercises. EMERGENCY PREPAREDNESS Strategy HS ‐ 2.3.2 Community Groups Continue pre–disaster agreements with appropriate community groups to provide specified post–disaster assistance, through the Emergency Service Coordinator and with the advice of the City Attorney. City Manager – Emergency Services General Fund Con. Not an action item. The City continues to partner with community groups as appropriate such as the Red Cross and CADRE. EMERGENCY PREPAREDNESS Strategy HS ‐ 2.3.3 American Red Cross Continue to implement the American Red Cross agreements under the direction of the Director of Emergency Services during a disaster. City Manager – Emergency Services General Fund Con. Not an action item. The City continues to implement agreements with the American Red Cross. EMERGENCY PREPAREDNESS Strategy HS ‐ 2.3.4 Shelter Provisions Continue the agreement with designated shelter sites to provide space for emergency supply containers.City Manager – Emergency Services General Fund Con. Not an action item. Existing shelter site agreements remain in place. The storage container and supplies are in place at Quinlan Community Center Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 0 PC 2-27-2024 100 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment EMERGENCY PREPAREDNESS Strategy HS ‐ 2.3.5 Amateur Radio Operators Continue to support training and cooperation between the City and Cupertino Amateur Radio Emergency Service (CARES) to prepare for emergency communications needs. City Manager – Emergency Services General Fund Con. Not an action item. Training opportunities focused around City events such as annual 5K runs, 4th of July event, and various festivals. Response during Public Safety Power Shutoff (PSPS) events in Oct. ʹ19 demonstrated coordination between City employees and CCC (CARES, CERT, etc.). EMERGENCY PREPAREDNESS Policy HS ‐ 2.4 Emergency Public Information Maintain an Emergency Public Information program to be used during emergency situations.City Manager – Emergency Services General Fund Con. Not an action item. City Communications has a system in place. Developing an emergency communications annex to the Emergency Operations Base Plan (EOP) is a priority for OES in FY 20/21. An Alert, Warning, and Notification program was implemented in 2022. EMERGENCY PREPAREDNESS Strategy HS ‐ 2.4.1 Communication Methods Use the local TV channel, Cupertino Alert System (CAS), the Internet and other communication methods to transmit information to the citizenry. City Manager – Emergency Services General Fund Con. This is not an action item. Preparedness information is published on tranditional media and social media platforms. During periods of emergency and alert, these notifications increase. An emergency communications annex is in development to include the various communication methods. EMERGENCY PREPAREDNESS Strategy HS ‐ 2.4.2 Public Information Office Activate the Public Information in coordination with the Sheriff and the Fire Department to provide accurate information to the public as needed. City Manager – Emergency Services General Fund Con. Not an action item. This is coordinated by SCC Office of Emergency Management (OEM) during periods of concern. OEM hosts conference calls, which are used in part to coordinate public information between the participants, including the Sheriffʹs Office, the Fire Department, and Cupertino OES. EMERGENCY PREPAREDNESS Policy HS ‐ 2.5 Disaster Medical Response Continue to coordinate with the appropriate County agencies and local emergency clinics to ensure preparedness and provide disaster medical response. Coordinate with the CERT member throughout the City to ensure that they are prepared to provide emergency support and first aid at the neighborhood level. City Manager – Emergency Services General Fund This is not an action item. The City continues to coordinate with County Emergency Medical Services and the County Public Health Department for awareness of their systems and capabilities to provide disaster medical response. Existing plans on getting response requests to County dispatch in the case of a total communcations (telephone, mobile phone, etc.) outage. Citizen Corps members are provided refresher first aid training. This training is practiced during City public service events (the 5K runs, Fourth of July, various festivals, etc.). EMERGENCY PREPAREDNESS Strategy HS ‐ 2.5.1 Memorandum of Understanding (MOU) Develop a MOU with local emergency clinics. The County’s role and involvement in emergencies should be considered in development of the MOU. City Manager – Emergency Services General Fund Con. This is not an action item. Although there are ʹfree‐ standingʹ physician offices in the City, there are no known public emergency medical clinics in the City. Long‐term care facilities, and any companion medical components, are coordinated through, and supported by, the County Emergency Medical Services Agency and the County Public Health Department EMERGENCY PREPAREDNESS Policy HS ‐ 2.6 Military Facilities and Readiness Consider the impact of development on neighboring military facilities and maintain military airspace to ensure military readiness. Community Development – Planning General Fund Con. There are no abutting military facilities or airspace over Cupertino. FIRE SAFETY Policy HS ‐ 3.1 Regional Coordination Coordinate wildland fire prevention efforts with adjacent jurisdictions. Encourage the County and the Midpeninsula Open Space District to implement measures to reduce fire hazards, including putting into effect the fire reduction policies of the County Public Safety Element, continuing efforts in fuel management, and considering the use of “green” fire break uses for open space lands. Santa Clara County Fire General Fund Con.The City participates in the Countyʹs Weed Abatement program to ensure fire safety Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 1 PC 2-27-2024 101 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment FIRE SAFETY Policy HS ‐ 3.2 Early Project Review Involve the Fire Department in the early design stage of all projects requiring public review to assure Fire Department input and modification as needed. Community Development – Building and Planning; Santa Clara County Fire General Fund Con. Not an action item. Ongoing coordination. FIRE SAFETY Policy HS ‐ 3.3 Emergency Access Ensure adequate emergency access is provided for all new hillside development. Santa Clara County Fire; Community Development – Building None Required Con. Not an action item.Reviewed in conjunction with project review. FIRE SAFETY Strategy HS ‐ 3.3.1 Roadway Design Create an all–weather emergency road system to serve rural areas. Public Works – Development Services and Capital Improvement Program; Santa Clara County Fire General Fund Con. Not an action item. Reviewed in conjunction with project review. FIRE SAFETY Strategy HS ‐ 3.3.2 Dead–End Street Access Allow public use of private roadways during an emergency for hillside subdivisions that have dead–end public streets longer than 1,000 feet or find a secondary means of access. Santa Clara County Fire; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. FIRE SAFETY Strategy HS ‐ 3.3.3 Hillside Access Routes Require new hillside development to have frequent grade breaks in access routes to ensure a timely response from fire personnel. Santa Clara County Fire; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. FIRE SAFETY Strategy HS ‐ 3.3.4 Hillside Road Upgrades Require new hillside development to upgrade existing access roads to meet Fire Code and City standards. Santa Clara County Fire; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. FIRE SAFETY Policy HS ‐ 3.4 Private Residential Electronic Security Gates Discourage the use of private residential electronic security gates that act as a barrier to emergency personnel. Community Development – Planning None Required Con. Not an action item. Implemented through the Municipal Code. FIRE SAFETY Strategy HS ‐ 3.4.1 Location Require a fence exception for electronic security gates in certain areas.Community Development – Planning None Required Con. Not an action item. Implemented through the Municipal Code. FIRE SAFETY Strategy HS ‐ 3.4.2 Access to Gates Where electronic security gates are allowed, require the installation of an approved key switch to be accessed by the Fire District. Community Development – Building; Santa Clara County Fire None Required Con. Not an action item. Implemented through the Municipal Code. FIRE SAFETY Policy HS ‐ 3.5 Commercial and Industrial Fire Protection Guidelines Coordinate with the Fire Department to develop new guidelines for fire protection for commercial and industrial land uses. Community Development – Building General Fund Con.Not an action item. Implemented through the Municipal and Fire Code. FIRE SAFETY Policy HS ‐ 3.6 Fire Prevention and Emergency Preparedness Promote fire prevention and emergency preparedness through city–initiated public education programs, the government television channel, the government television channel, the Internet, and the Cupertino Scene. City Manager – Emergency Services General Fund Con. Not an action item. There is coordinated public education of life safety conducted by the City, including Personal Emergency Preparedness classes. Some information is also provided on the City radio station (1670 AM). The Scene periodically features articles regarding emergency preparedness and fire safety. FIRE SAFETY Policy HS ‐ 3.7 Multi–Story Buildings Ensure that adequate fire protection is built into the design of multi–story buildings and require on–site fire suppression materials and equipment. Santa Clara County Fire; Community Development – Building General Fund Con. Not an action item. Implemented throught the Municipal and Fire Codes. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 2 PC 2-27-2024 102 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment FIRE SAFETY Policy HS ‐ 3.8 Extension of Water Service Encourage the water companies to extend water service into the hillside and canyon areas and encourage cooperation between water utility companies and the Fire Department in order to keep water systems in pace with growth and firefighting service needs. Santa Clara County Fire; Community Development – Building General Fund Con.Not an action item. Reviewed in conjunction with project review. PUBLIC SAFETY Policy HS ‐ 4.1 Neighborhood Awareness Programs Continue to support the Neighborhood Watch Program and other similar programs intended to help neighborhoods prevent crime through social interaction. City Manager – Public Affairs General Fund Con. Not an action item. PUBLIC SAFETY Policy HS ‐ 4.2 Crime Prevention Through Building and Site Design Consider appropriate design techniques to reduce crime and vandalism when designing public spaces and reviewing development proposals. Public Works – Capital Improvement Program and Park Improvement; Community Development – Planning Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review. PUBLIC SAFETY Strategy HS ‐ 4.2.1 Perimeter Roads for Parks Encircle neighborhood parks with a public road to provide visual accessibility whenever possible. Public Works – Capital Improvement Program and Park Improvement Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review. PUBLIC SAFETY Strategy HS ‐ 4.2.2 Development Review Continue to request County Sheriff review and comment on development applications for security and public safety measures. Community Development – Planning None Required Con. Not an action item. Reviewed in conjunction with project review. PUBLIC SAFETY Policy HS ‐ 4.3 Fiscal Impacts Recognize fiscal impacts to the County Sheriff and City of Cupertino when approving various land use mixes. Community Development – Planning and City Manager – Economic Development None Required Con. Not an action item. Reviewed in conjunction with project review. GEOLOGIC AND SEISMIC HAZARDS Policy HS ‐ 5.1 Seismic and Geologic Review Process Evaluate new development proposals within mapped potential hazard zones using a formal seismic/geologic review process. Use Table HS ‐ 3 of this Element to determine the level of review required. Community Development – Building and Planning; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. GEOLOGIC AND SEISMIC HAZARDS Strategy HS ‐ 5.1.1 Geotechnical and Structural Analysis Require any site with a slope exceeding 10% to reference the Landslide Hazard Potential Zone maps of the State of California for all required geotechnical and structural analysis. Community Development – Building and Planning; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. GEOLOGIC AND SEISMIC HAZARDS Strategy HS ‐ 5.1.2 Residential Upgrades Require that any residential facility, that is being increased more than 50% assessed value or physical size, conform to all provisions of the current building code throughout the entire structure. Owners of residential buildings with known structural defects, such as un–reinforced garage openings, “soft first story” construction, unbolted foundations, or inadequate sheer walls are encouraged to take steps to remedy the problem and bring their buildings up to the current building code. Community Development – Building and Planning None Required Con. Not an action item. Reviewed in conjunction with project review. GEOLOGIC AND SEISMIC HAZARDS Strategy HS ‐ 5.1.3 Geologic Review Continue to implement and update geologic review procedures for Geologic Reports required by the Municipal Code through the development review process. Community Development – Building and Planning; Public Works – Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 3 PC 2-27-2024 103 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment GEOLOGIC AND SEISMIC HAZARDS Policy HS ‐ 5.2 Public Education on Seismic Safety Reinforce the existing public education programs to help residents minimize hazards resulting from earthquakes. City Manager – Emergency Services General Fund Con. Not an action item. Ongoing coordination/ education. GEOLOGIC AND SEISMIC HAZARDS Strategy HS ‐ 5.2.1 Covenant on Seismic Risk Require developers to record a covenant to tell future residents in high–risk areas about the risk and inform them that more information is in City Hall records. This is in addition to the State requirement that information on the geological report is recorded on the face of subdivision maps. Community Development – Planning None Required Con.Not an action item. Reviewed in conjunction with project review. GEOLOGIC AND SEISMIC HAZARDS Strategy HS ‐ 5.2.2 Emergency Preparedness Publish and promote emergency preparedness activities and drills. Use the City social media, and the website to provide safety tips that may include identifying and correcting household hazards, knowing how and when to turn off utilities, helping family members protect themselves during and after an earthquake, recommending neighborhood preparation activities, and advising residents to maintain an emergency supply kit containing first–aid supplies, food, drinking water and battery operated radios and flashlights. City Manager – Emergency Services General Fund Con. Not an action item. Presented in Personal Emergency Preparedness classes offered by the Cityʹs Office of Emergency Services. Distribution of printed materials in the lobby of City Hall and on the City website. GEOLOGIC AND SEISMIC HAZARDS Strategy HS ‐ 5.2.3 Neighborhood Response Groups Encourage participation in CERT training. Train neighborhood groups to care for themselves during disasters. Actively assist in neighborhood drills and safety exercises to increase participation and build community support. City Manager – Emergency Services General Fund Con. Not an action item. The Santa Clara County Fire Department provides CERT training for community members. When requested by neighborhood groups, Cupertinoʹs Office of Emergency Services will present preparedness information and support, including exercises. This would include the Block Leader Program. GEOLOGIC AND SEISMIC HAZARDS Strategy HS ‐ 5.2.4 Dependent Populations As part of community–wide efforts, actively cooperate with State agencies that oversee facilities for persons with disabilities and those with access and functional needs, to ensure that such facilities conform to all health and safety requirements, including emergency planning, training, exercises and employee education. City Manager – Emergency Services General Fund Con. Not an action item. As situations arise, the City cooperates with State agencies overseeing facilities for those with disabilities and access and functional needs. GEOLOGIC AND SEISMIC HAZARDS Strategy HS ‐ 5.2.5 Foreign Language Emergency Information Obtain translated emergency preparedness materials and make them available to appropriate foreign language populations. City Manager – Emergency Services General Fund Con. Not an action item. Foreign language emergency preparedness information is available. During an emergency, the City has the ability to translate materials and can also receive translation support from the County. HAZARDOUS MATERIALS Policy HS ‐ 6.1 Hazardous Materials Storage and Disposal Require the proper storage and disposal of hazardous materials to prevent leakage, potential explosions, fire or the release of harmful fumes. Maintain information channels to the residential and business communities about the illegality and danger of dumping hazardous material and waste in the storm drain system or in creeks. Public Works – Environmental Programs; Santa Clara County Fire General Fund Con. Not an action item. Reviewed in conjunction with project review. Ongoing coordination/ education. HAZARDOUS MATERIALS Policy HS ‐ 6.2 Proximity of Residents to Hazardous Materials Assess future residents’ exposure to hazardous materials when new residential development or sensitive populations are proposed in existing industrial and manufacturing areas. Do not allow residential development or sensitive populations if such hazardous conditions cannot be mitigated to an acceptable level of risk. Community Development – Planning None Required Con. Not an action item. Reviewed in conjunction with project review. HAZARDOUS MATERIALS Policy HS ‐ 6.3 Electromagnetic Fields (EMF) Ensure that projects meet Federal and State standards for EMF emissions through development review.Community Development – Planning None Required Con. Not an action item. Reviewed in conjunction with project review. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 4 PC 2-27-2024 104 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment HAZARDOUS MATERIALS Policy HS ‐ 6.4 Educational Programs Continue to encourage residents and businesses to use non– and less– hazardous products, especially less toxic pest control products, to slow the generation of new hazardous waste requiring disposal through the county–wide program. Public Works – Environmental Programs and Service Center General Fund Con. Not an action item. Ongoing implementation. HAZARDOUS MATERIALS Policy HS ‐ 6.5 Hazardous Waste Disposals Continue to support and facilitate, for residences and businesses, a convenient opportunity to properly dispose of hazardous waste. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing implementation. In January 2019, the Cityʹs door to door Household Hazardous Waste (HHW) Program dissolved and residents were redirected to utilize the Countyʹs HHW drop‐off program. HAZARDOUS MATERIALS Strategy HS ‐ 6.5.1 Partner on Hazardous Waste Collection and Disposal Continue to explore efficient, economical and convenient ways to offer Household Hazardous Waste collection for residents in partnership with the Solid Waste contractor or the County. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing implementation. HAZARDOUS MATERIALS Strategy HS ‐ 6.5.2 Educational Materials Publish educational materials about the program in the Cupertino Scene, City website, and brochures that are distributed throughout the community. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination/ education. FLOODING Policy HS ‐ 7.1 Evacuation Map Prepare and update periodically an evacuation map for the flood hazard areas and distribute it to the general public. Public Works – Development Services and Service Center General Fund Con. Evacuation Map and Street signage has been prepared and installed. Ongoing evaluation is occuring. FLOODING Policy HS ‐ 7.2 Emergency Response to Dam Failure Ensure that Cupertino is prepared to respond to a potential dam failure. City Manager – Emergency Services; Public Works General Fund Con. Implemented through Strategies HS‐7.2.1 and HS‐ 7.2.2. The Stevens Creek Dam Failure Plan was adopted in 2012 and a comprehensive network of flood evacuation signs were placed in late 2014 on streets that would be impacted from a dam failure. FLOODING Strategy HS ‐ 7.2.1 Emergency and Evacuation Plan Maintain and update a Stevens Creek Dam Failure Plan, including alert, warning and notification systems and appropriate signage. City Manager – Emergency Services General Fund IM Action completed. Adopted in 2012. Online at: https://www.cupertino.org/home/showdocument? id=7424. Alert, warning, notification are major components of these plans. FLOODING Strategy HS ‐ 7.2.2 Inter–agency Cooperation Continue to coordinate dam–related evacuation plans and alert/notification systems with the City of Sunnyvale, the SCVWD and Santa Clara County to ensure that traffic management between the agencies facilities life safety. Also work with other neighboring cities to enhance communication and coordination during a dam–related emergency. City Manager – Emergency Services General Fund Con. Not an action item. The Santa Clara Valley Water District is scheduled to revise its Stevens Creek Dam Emergency Plan in 2020. Santa Clara Valley Water District revised the Stevens Creek Dam Emergency Plan and provides annual updates to alert, warning, and notifications processes. This will facilitate updating the Cityʹs Dam Failure Plan, as well as the coordination with SCVWD on dam damage survey efforts. FLOODING Policy HS ‐ 7.3 Existing Non–Residential Uses in the Flood Plain Allow commercial and recreational uses that are now exclusively within the flood plan to remain in their present use or to be used for agriculture, provided it does not conflict with Federal, State and regional requirements. Public Works – Development Services; Community Development – Planning None Required Con. Not an action item. FLOODING Policy HS ‐ 7.4 Construction in Flood Plains Continue to implement land use, zoning and building code regulations limiting new construction in the already urbanized flood hazard areas recognized by the Federal Flood Insurance Administrator. Community Development – Planning General Fund Con. Not an action item. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 5 PC 2-27-2024 105 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment FLOODING Strategy HS ‐ 7.4.1 Dwellings in Flood Plains Discourage new residential development in regulated flood plains. Regulate all types of redevelopment in natural flood plains. This includes discouraging fill materials and obstructions that may increase flood potential or modify the natural riparian corridors. Public Works – Development Services None Required Con. Not an action item. Information provided to property owners/ applicants as needed. FLOODING Strategy HS ‐ 7.4.2 Description of Flood Zone Regulation Continue to maintain and update a map of potential flood hazard areas and a description of flood zone regulations on the City’s website. Public Works – Development Services General Fund Con. Ongoing coordination/ education. FLOODING Strategy HS ‐ 7.4.3 National Flood Insurance Program Community Rating System Continue to participate in the National Flood Insurance Program (NFIP) Community Rating System (CRS). Public Works – Development Services General Fund Con. Ongoing coordination. FLOODING Policy HS ‐ 7.5 Hillside Grading Restrict the extent and timing of hillside grading operations to April through October except as otherwise allowed by the City. Require performance bonds during the remaining time to guarantee the repair of any erosion damage. Require planting of graded slopes as soon as practical after grading is complete. Public Works – Development Services None Required Con. Not an action item. Implemented through the Municipal Code. FLOODING Policy HS ‐ 7.6 Stability of Existing Water Storage Facilities Assure the structural integrity of water storage facilities.Public Works – Capital Improvement Program General Fund Con. Not an action item. FLOODING Strategy HS ‐ 7.6.1 Coordination with other Agencies Work closely with the San Jose Water Company and owners of other water storage facilities to develop and implement a program to monitor the stability of all existing water storage facilities and related improvements, such as: distribution lines, connections and other system components. Public Works – Capital Improvement Program General Fund Con. Not an action item. Ongoing coordination. NOISE Policy HS ‐ 8.1 Land Use Decision Evaluation Use the Land Use Compatibility for Community Noise Environments chart, the Future Noise Contour Map (see Figure D‐1 in Appendix D) and the City Municipal Code to evaluate land use decisions. Community Development – Planning None Required Con. Not an action item. NOISE Policy HS ‐ 8.2 Building and Site Design Minimize noise impacts through appropriate building and site design. Community Development – Planning and Building None Required Con. Not an action item. Implemented through the Municipal Code. NOISE Strategy HS ‐ 8.2.1 Commercial Delivery Areas Locate delivery areas for new commercial and industrial developments away from existing or planned homes. Community Development – Planning and Building None Required Con. Not an action item. Reviewed in conjunction with project review. NOISE Strategy HS ‐ 8.2.2 Noise Control Techniques Require analysis and implementation of techniques to control the effects of noise from industrial equipment and processes for projects new low‐intensity residential uses. Community Development – Planning None Required Con. Not an action item. Reviewed in conjunction with project review. NOISE Strategy HS ‐ 8.2.3 Sound Wall Requirements Exercise discretion in requiring sound walls to be sure that all other measures of noise control have been explored and that the sound wall blends with the neighborhood. Sound walls should be designed and landscaped to fit into the environment. Community Development – Planning None Required Con.Not an action item. Reviewed in conjunction with project review. NOISE Policy HS ‐ 8.3 Construction and Maintenance Activities Regulate construction and maintenance activities. Establish and enforce reasonable allowable periods of the day, during weekdays, weekends and holidays for construction activities. Require construction contractors to use the best available technology to minimize excessive noise and vibration from construction equipment such as pile drivers, jack hammers, and vibratory rollers. Community Development – Planning and Building General Fund Con. Not an action item. Implemented through the Municipal Code. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 6 PC 2-27-2024 106 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment NOISE Policy HS ‐ 8.4 Freeway Design and Neighborhood Noise Ensure that roads and development along Highway 85 and Interstate 280 are designed and improved in a way that minimizes neighborhood noise. Public Works – Transportation and Development Services Capital Improvement Fund; General Fund Con.Not an action item. Reviewed in conjunction with project review. NOISE Policy HS ‐ 8.5 Neighborhoods Review residents’ needs for convenience and safety and prioritize them over the convenient movement of commute or through traffic where practical. Public Works – Transportation Capital Improvement Fund Con.Not an action item. Reviewed with project review/ Capital Improvement Program. NOISE Policy HS ‐ 8.6 Traffic Calming Solutions to Traffic Noise Evaluate solutions to discourage through traffic in neighborhoods through enhanced paving and modified street design. Public Works – Transportation Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. NOISE Strategy HS ‐ 8.6.1 Local Improvement Modify street design to minimize noise impact to neighbors.Public Works – Transportation Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. NOISE Policy HS ‐ 8.7 Reduction of Noise from Trucking Operations Work to carry out noise mitigation measures to diminish noise along Foothill and Stevens Creek Boulevards from the quarry and cement plant trucking operations. These measures include regulation of truck speed, the volume of truck activity, and trucking activity hours to avoid late evening and early morning. Alternatives to truck transport, specifically rail, are strongly encouraged when feasible. Public Works – Transportation General Fund Con. Not an action item. Ongoing coordination/ implementation. NOISE Strategy HS ‐ 8.7.1 Restrictions in the County’s Use Permit Coordinate with the County to restrict the noise of trucks, their speed and noise levels along Foothill and Stevens Creek Boulevards, to the extent allowed in the Use Permit. Ensure that restrictions are monitored and enforced by the County. Public Works – Transportation General Fund Con. Not an action item. Ongoing coordination/ implementation. NOISE Strategy HS ‐ 8.7.2 Road Improvements to Reduce Truck Impacts Consider road improvements such as medians, landscaping, noise attenuating asphalt, and other methods to reduce quarry truck impacts. Public Works – Transportation General Fund con. Not an action item. Ongoing coordination/ implementation. CITYWIDE INFRASTRUCTURE Policy INF ‐ 1.1 Infrastructure Planning Upgrade and enhance the City’s infrastructure through the City’s Capital Improvement Program (CIP) and requirements for development. Public Works – Capital Improvement Program General Fund Con. Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. CITYWIDE INFRASTRUCTURE Strategy INF ‐ 1.1.1 Capital Improvement Program Ensure that CIP projects reflect the goals and policies identified in Community Vision 2040.Public Works – Capital Improvement Program General Fund Con. Not an action item. Planning Commission annually reviews the Capital Imp. Program for conformance with the General Plan. CITYWIDE INFRASTRUCTURE Strategy INF ‐ 1.1.2 Design Capacity Ensure that public infrastructure is designed to meet planned needs and to avoid the need for future upsizing. Maintain a balance between meeting future growth needs and over–sizing of infrastructure to avoid fiscal impacts or impacts to other goals. Public Works – Capital Improvement Program, Development Services and Transportation General Fund, Grants Con. Not an action item. Ongoing coordination/ implementation. CITYWIDE INFRASTRUCTURE Strategy INF ‐ 1.1.3 Coordination Require coordination of construction activity between various providers, particularly in City facilities and rights–of–way, to ensure that the community is not unnecessarily inconvenienced. Require that providers maintain adequate space for all utilities when planning and constructing their infrastructure. Public Works – Development Services General Fund, Grants Con. Not an action item. Ongoing coordination. CITYWIDE INFRASTRUCTURE Policy INF ‐ 1.2 Maintenance Ensure that existing facilities are maintained to meet the commuity’s needs.Public Works – Service Center General Fund, Grants Con. Not an action item. Implemented through the Capital Improvement Program, Engineering and maintenance activities. CITYWIDE INFRASTRUCTURE Policy INF ‐ 1.3 Coordination Coordinate with utility and service providers to ensure that their planning and operations meet the City’s service standards and future growth. Public Works – Development Services None Required con. Not an action item. Ongoing coordination Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 7 PC 2-27-2024 107 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment CITYWIDE INFRASTRUCTURE Policy INF ‐ 1.4 Funding Explore various strategies and opportunities to fund existing and future infrastructure needs. Public Works – Transportation and Capital Improvement Program General Fund Con. Not an action item. Implemented through the Capital Improvement Program. CITYWIDE INFRASTRUCTURE Strategy INF ‐ 1.4.1 Existing Infrastructure Require developers to expand or upgrade existing infrastructure to increase capacity, or pay their fair share, as appropriate. Public Works – Transportation and Development Services None Required Con. Not an action item. Reviewed in conjunction with project review. CITYWIDE INFRASTRUCTURE Strategy INF ‐ 1.4.2 Future Infrastructure Needs For new infrastructure, require new development to pay its fair share of, or to extend or construct, improvements to accommodate growth without impacting service levels. Public Works – Development Services, Transportation and Capital Improvement Program None Required con. Not an action item. Implemented in conjunction with project review. Environmental Services Division staff recommend implementing an ordinance that requires private developers to construct green stormwater infrastructure. CITYWIDE INFRASTRUCTURE Strategy INF ‐ 1.4.3 Economic Development Prioritize funding of infrastructure to stimulate economic development and job creation in order to increase opportunities for municipal revenue. Public Works – Transportation and Capital Improvement Program General Fund; Capital Improvement Fund Con.Not an action item. Implemented through the Capital Improvement Program. RIGHTS–OF–WAY Policy INF ‐ 2.1 Maintenance Maintain the City’s rights–of–way and traffic operations systems. Public Works – Transportation and Capital Improvement Program General Fund; Grants Con. Not an action item. RIGHTS–OF–WAY Policy INF ‐ 2.2 Multi–modal Systems Ensure that City rights–of–way are planned for a variety of transportation alternatives including pedestrian, bicycle, automobile, as well as new technologies such as driverless cars, etc. Public Works – Transportation, Service Center and Capital Improvement Program General Fund; Grants Con.Not an action item. Implemented through the Capital Improvement Program and Bike/Ped Master plans. RIGHTS–OF–WAY Policy INF ‐ 2.3 Green Streets Explore the development of a “green streets” program to minimize stormwater runoff in City rights–of–way. Public Works – Transportation, Environmental Programs and Capital Improvement Program General Fund; Grants LR Attempts have been made to identify a ʺgreen streetsʺ project through the Capital Improvement Program. Ongoing. Municipal Regional Permit requires continued effort to evaluate all projects for Green Stormwater Infrastructure opportunities. RIGHTS–OF–WAY Policy INF ‐ 2.4 Undergrounding Utilities Explore undergrounding of utilities through providers, public projects, private development and agency funding programs and grants. Public Works – Development Services General Fund; Grants Con.Not an action item. Implemeneted through the Capital Improvement Program. RIGHTS–OF–WAY Strategy INF ‐ 2.4.1 Public and Provider Generated Projects Require undergrounding of all new infrastructure projects constructed by public agencies and providers. Work with providers to underground existing overhead lines. Public Works – Development Services General Fund; Grants Con. Not an action item. Ongoing coordination. RIGHTS–OF–WAY Strategy INF ‐ 2.4.2 Development Require undergrounding of all utility lines in new developments and highly encourage undergrounding in remodels or redevelopment of major projects. Public Works – Development Services General Fund; Grants Con.Not an action item. Reviewed in conjunction with project review. RIGHTS–OF–WAY Policy INF ‐ 2.5 Recycled Water Infrastructure Plan for citywide access to recycled water and encourage its use.Public Works – Development Services General Fund Con. Attempts have been made to require development projects to route recycled water to Stevens Creek Blvd. Opportunities to expand the recycled water system into Cupertino are ongoing. RIGHTS–OF–WAY Strategy INF ‐ 2.5.1 Availability Expand the availability of a recycled water system through public infrastructure projects and development review. Public Works – Development Services and Capital Improvement Program, Capital Improvement Fund Con. Attempts have been made to require development projects to route recycled water to Stevens Creek Blvd. Opportunities to expand the recycled water system into Cupertino are ongoing. Feasibility study recommended as a CWP item by Sustainability Commission for FY24‐25. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 8 PC 2-27-2024 108 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment RIGHTS–OF–WAY Strategy INF ‐ 2.5.2 Use Encourage private and public projects to incorporate the use of recycled water for landscaping and other uses. Public Works – Development Services and Capital Improvement Program Con. Attempts have been made to require development projects to route recycled water to Stevens Creek Blvd and also to require dual plumbing to allow use of recycled water. RIGHTS–OF–WAY Strategy INF ‐ 2.5.3 City Facilities Design and retrofit City buildings, facilities and landscaping to use recycled water, to the extent feasible. Public Works – Capital Improvement Program and Service Center Capital Improvement Fund Con.Not an action item. When recycled water services are available, coordination will occur. WATER Policy INF ‐ 3.1 Coordination with Providers Coordinate with water providers and agencies in their planning and infrastructure process to ensure that the City continues to have adequate supply for current needs and future growth. Public Works – Development Services General Fund Con. Not an action item. Ongoing coordination. WATER Strategy INF ‐ 3.1.1 Maintenance Coordinate with providers to ensure that water and recycled water delivery systems are maintained in good condition. Public Works – Development Services General Fund Con. Not an action item. Ongoing coordination. WATER Policy INF ‐ 3.2 Regional Coordination Coordinate with State and regional agencies to ensure that policies and programs related to water provision and conservation meet City goals. Note: additional water conservation policies are discussed in detail in the Environmental Resources and Sustainability Element. Public Works – Environmental Programs; City Manager – Sustainability General Fund Con. Not an action item. Ongoing coordination, including participation in regional water conservation efforts.. STORMWATER Policy INF ‐ 4.1 Planning and Management Create plans and operational policies to develop and maintain an effective and efficient stormwater system. Public Works – Sevice Center and Environmental Programs General Fund Con. Council adopted an updated Storm Drain Master Plan in Jan. 2019. Projects consistent with the Master Plan will be identified for the Councilʹs consideration for inclusion in the CIP in upcoming years. Vac truck puchased in 2022 to enable on‐ demand response and maintenance. In‐pipe rover with camera purchased in 2023 to enable investigation of issues. STORMWATER Strategy INF ‐ 4.1.1 Management Reduce the demand on storm drain capacity through implementation of programs that meet and even exceed on–site drainage requirements. Public Works – Development Services and Environmental Programs General Fund Con. Not an action item. Implemented in conjunction with project review. STORMWATER Strategy INF ‐ 4.1.2 Infrastructure Develop a Capital Improvement Program (CIP) for the City’s storm drain infrastructure that meets the current and future needs of the community. Public Works – Capital Improvement Program Capital Improvement Fund IM/LR Council adopted an updated Storm Drain Master Plan in Jan. 2019. Projects consistent with the Master Plan will be identified for the Councilʹs consideration for inclusion in the CIP in upcoming years STORMWATER Strategy INF ‐ 4.1.3 Maintenance Ensure that City’s storm drain infrastructure is appropriately maintained to reduce flood hazards through implementation of best practices. Public Works – Service Center Capital Improvement Fund Con. Not an action item. Ongoing maintenance . Storm Drain Funding acquired through Clean Water and Storm Protection Parcel Fee ballot measure in July 2019. Vac truck puchased in 2022 to enable on‐demand response and maintenance. In‐ pipe rover with camera purchased in 2023 to enable investigation of issues. STORMWATER Policy INF ‐ 4.2 Funding Develop permanent sources of funding stormwater infrastructure construction and maintenance.Public Works – Environmental Programs General Fund IM Action Completed. Storm Drain Funding acquired through Clean Water and Storm Protection Parcel Fee ballot measure in July 2019. Ongoing ‐ brought to Council annually for renewal of both fees. STORMWATER Strategy INF ‐ 4.2.1 Ongoing Operations Review other funding strategies to pay for the ongoing operations and maintenance of the storm drain system per State and regional requirements. Note: additional policies that meet State and regional runoff reduction are described in the Environmental Resources and Sustainability Element. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con10 9 PC 2-27-2024 109 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment WASTEWATER Policy INF ‐ 5.1 Infrastructure Ensure that the infrastructure plans for Cupertino’s waste water system providers continue to meet the City’s current and future needs. Public Works – Development Services General Fund Con. Not an action item. Ongoing coordination. WASTEWATER Strategy INF ‐ 5.1.1 Coordination Coordination with the Cupertino Sanitary District on their Master Plan and the Sunnyvale Treatment Plant to develop a comprehensive capital improvement program to ensure adequate capacity for future development anticipated with General Plan buildout. Public Works – Development Services General Fund Con. Not an action item. Ongoing coordination. WASTEWATER Strategy INF ‐ 5.1.2 Development Require developers to pay their fair share of costs for, or in some cases construct, infrastructure upgrades to ensure that service levels are met. Public Works – Development Services Con.Not an action item. Implemented in conjunction with project review. WASTEWATER Policy INF ‐ 5.2 Demand Look for ways to reduce demand on the City’s wastewater system through implementation of water conservation measures. Public Works – Development Services General Fund con. Not an action item. Ongoing coordination. TELE‐ COMMUNICATIONS Policy INF ‐ 6.1 Telecommunications Master Plan Maintain and update a Telecommunications Master Plan with regulations and guidelines for wireless and emerging technologies. Information ServicesPublic Works – Development Services; Community Development – Planning; General Fund Wireless and Fiber Optic Master Plan has been prepared. TELE‐ COMMUNICATIONS Policy INF ‐ 6.2 Coordination Coordinate with providers to improve access and delivery of services to businesses and homes. Information Services; Public Works – Development Services; Community Development – Planning General Fund Con. Not an action item. Ongoing coordination. TELE‐ COMMUNICATIONS Strategy INF ‐ 6.2.1 Facility Upgrades When possible, require service providers to upgrade existing facilities as part of permit or lease renewals. Encourage use of newer technologies that allow the facility components to be reduced in size or improve screening or camouflaging. Public Works – Development Services; Community Development – Planning General Fund Con. Not an action item. Ongoing coordination. TELE‐ COMMUNICATIONS Strategy INF ‐ 6.2.2 Improved Access Work with providers to expand service to areas that are not served by telecommunications technologies. Information Services – Communications; Public Works – Development Services; General Fund Con. Not an action item. Ongoing coordination. TELE‐ COMMUNICATIONS Strategy INF ‐ 6.2.3 City Facilities Encourage leasing of City sites to expand access to telecommunications services. Develop standards for the incorporation of telecommunications systems and public use. Information Services; Public Works – Development Services General Fund Con. Not an action item. Ongoing coordination. TELE‐ COMMUNICATIONS Strategy INF ‐ 6.2.4 Agency and Private Facilities Encourage the installation of communications infrastructure in facilities owned by other public agencies and private development. Public Works – Development Services General Fund con. Not an action item. Ongoing coordination. Telecommunications facilities proposed for the Sports Center were requested by Council to be relocated. TELE‐ COMMUNICATIONS Strategy INF ‐ 6.2.5 Communications Infrastructure Support the extension and access to telecommunications infrastructure such as fiber optic cables.Public Works – Development Services General Fund LR Wireless and Fiber Optic Master Plan has been prepared. Planning Commision recommended in the 2020 General Plan Annual Report process that the City establish consistent aesthetic standards for 5G infrastructure for all carriers. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con11 0 PC 2-27-2024 110 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment TELE‐ COMMUNICATIONS Policy INF ‐ 6.3 Emerging Technologies Encourage new and innovative technologies and partner with providers to provide the community with accesss to these services.Information Services General Fund LR The Information Services team has implemented several technologies in the City since adoption of the 2015 General Plan. These include the 311 service software, and Accela for permit review TELE‐ COMMUNICATIONS Strategy INF ‐ 6.3.1 Strategic Technology Plan Create and update a Strategic Technology Plan for the City to improve service efficiency.Information Services – Information Technology General Fund IM Implementation of current three year Strategic Technology Plan began in Oct 2017. All projects in this plan have been completed or will be complete by September 2020. Strategic Technology plans are available online at: www.cupertino.org/home/showdocument?id=169 66. SOLID WASTE Policy INF ‐ 7.1 Providers Coordinate with solid waste system providers to utilize the latest technology and best practices to encourage waste reduction and meet, and even, exceed State targets. Public Works – Environmental Programs General Fund Con. Ongoing coordination and is included as a performance measure in the Cityʹs Waste Hauler Franchise Agreement. In May 2023, Council approved including processing of Municipal Solid Waste for removal of recycable and compostable materials as part of the search for new post‐ collection waste disposition services. SOLID WASTE Policy INF ‐ 7.2 Facilities Ensure that public and private developments build new and on–site facilities and/or retrofit existing on–site facilities to meet the City’s waste diversion requirements. Public Works – Environmental Programs General Fund Con. Not an action item. Implemented in conjunction with project review. SOLID WASTE Policy INF ‐ 7.3 Operations Encourage public agencies and private property owners to design their operations to exceed regulatory waste diversion requirements. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. Implemented in conjunction with project review. SOLID WASTE Strategy INF ‐ 7.3.1 City Facilities and Events Design new City facilities and retrofit existing facilities and event venues with recycling and trash collection bins to facilitate easy disposal of recyclable and compostable waste by staff and the public. Public Works – Environmental Programs and Capital Improvement Program General Fund Con. Not an action item. Implemented in conjunction with project review. Work continued in 2021 to develop a citywide Zero Waste Plan. Waste reduction goals captured in Climate Action Plan 2.0. SOLID WASTE Policy INF ‐ 7.4 Product Stewardship Per the City’s Extended Producer Responsibility (EPR) policy, support statewide and regional EPR initiatives and legislation to reduce waste and toxins in products, processes and packaging. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. REDUCE, REUSE AND RECYCLE Policy INF ‐ 8.1 Reducing Waste Meet or exceed Federal, State and regional requirements for solid waste diversion through implementation of programs. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. Diversion requirements captured in franchised hauling agreement and municipal code. Waste reduction and diversion goals also captured in Climate Action Plan 2.0. REDUCE, REUSE AND RECYCLE Strategy INF ‐ 8.1.1 Outreach Conduct and enhance programs that promote waste reduction through partnerships with schools, institutions, businesses and homes. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. Food waste diversion pilot planning began in 2023 with CUSD. Outreach and coordination with other institutions and large employers ongoing per the requirements of SB1383 and local ordinance. REDUCE, REUSE AND RECYCLE Strategy INF ‐ 8.1.2 Hazardous Waste Work with providers and businesses to provide convenient hazardous and e–waste facilities for the community. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. REDUCE, REUSE AND RECYCLE Strategy INF ‐ 8.1.3 Preferential Purchasing Maintain and update a City preferential purchasing policy to products that reduce packaging waste, greenhouse gas emissions, toxic contaminants and are reusable. Public Works – Environmental Programs and City Manager – Sustainability General Fund Con. Not an action item. Ongoing coordination. REDUCE, REUSE AND RECYCLE Strategy INF ‐ 8.1.4 Reuse Encourage reuse of materials and reusable products. Develop a program for reuse of materials and reusable products in City facilities and outreach programs for community–wide participation by promoting community–wide garage sales and online venues. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con11 1 PC 2-27-2024 111 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment REDUCE, REUSE AND RECYCLE Strategy INF ‐ 8.1.5 Collaboration Collaborate with agencies and large businesses or projects to enhance opportunities for community–wide recycling, reuse and reduction programs. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. REDUCE, REUSE AND RECYCLE Strategy INF ‐ 8.1.6 Construction Waste Encourage recycling and reuse of building materials during demolition and construction of City, agency and private projects. Public Works – Environmental Programs General Fund Con. Not an action item. Ongoing coordination. Current municipal code requires 65% or more of mixed construction and demolition debris be diverted from landfill from qualifying projects. As of 2023, require use of Green Halo material tracking online service for reporting of materials generated and their disposal diversion rates. REDUCE, REUSE AND RECYCLE Strategy INF ‐ 8.1.7 Recycled Materials Encourage the use of recycled materials and sustainably harvested materials in City, agency and private projects. Public Works – Environmental Programs and Capital Improvement Program General Fund Con. Not an action item. Implemented in conjunction with project review. City purchasing of materials is subject to the Environmental Purchasing Policy. Ongoing PARKS AND OPEN SPACE Policy RPC ‐ 1.1 Parks and Recreation Master Plan Prepare a citywide Parks and Recreation Master Plan that outlines policies and strategies to plan for the communities open space and recreational needs. Parks and Recreation – Business Services; Public Works – Park Improvement General Fund IM Completed ‐ Adopted by the City Council on February 18. 2020. PARKS AND OPEN SPACE Strategy RPC ‐ 1.1.1 Stevens Creek Corridor Master Plan Prepare a master plan for the park and open space corridor along Stevens Creek including McClellan Ranch, McClellan Ranch West, Blackberry Farm, the Blackberry Farm golf course, Stocklmeir and Blesch properties and the Nathan Hall Tank House area. Parks and Recreation – Business Services; Public Works – Park Improvement General Fund LR Anticipated to be intiated after 2025 PARKS AND OPEN SPACE Strategy RPC ‐ 1.1.2 Civic Center Master Plan Prepare a master plan that addresses the needs of the elements in the Civic Center area including City Hall, Community Hall, Library Field, Library programming, function and meeting space and community gathering space and parking needs. Public Works – Capital Improvement Program and Park Improvement General Fund IM/LR Civic Center Master Plan provides guidance on capital projects in this node. Library expansion project was included in the Civic Center Master Plan and was constructed in 2021. PARKS AND OPEN SPACE Policy RPC ‐ 1.2 Parkland Standards Continue to implement a parkland acquisition and implementation program that provides a minimum of three acres per 1,000 residents. Public Works – Development Services General Fund; Developer Fees Con. Not an action item. PARKS AND OPEN SPACE Strategy INF ‐ 1.2.1 Park Size Require target for parks based on function and activity supported as part of the Parks and Recreation Master Plan. While the preferred size for most neighborhood parks is about 3.5 acres for flexibility of use, smaller size parks may be considered based on opportunities and circumstances. Parks and Recreation – Business Services; Public Works – Park Improvement General Fund Con. Not an action item. PARKS AND OPEN SPACE Strategy RPC ‐ 1.2.2 Amend Parkland Standard Explore increasing the parkland standard to five acres per 1,000 residents as part of the citywide Parks and Recreation Master Plan. Public Works – Park Improvement General Fund LR No action has been taken with regard to this strategy. This is an aspirational goal. The Parks Master Plan does not propose any change to the current 3 acre/1000 residents standard. PARKS AND OPEN SPACE Policy RPC ‐ 1.3 Capital Improvement Program (CIP) Ensure that CIP projects reflect the goals and policies identified in the Community Vision 2040, establishing a criteria for ranking CIP proposals for the highest and best selection of community projects. Public Works – Capital Improvement Program General Fund Con. Not an action item. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con11 2 PC 2-27-2024 112 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Policy 2.1 Parkland Acquisition The City’s parkland acquisition strategy should be based upon three broad objectives: *Distributing parks equitably throughout the City; *Connecting and providing access by providing paths, improved pedestrian and bike connectivity and signage; and *Obtaining creek lands and restoring creek and other natural open space areas, including strips of land adjacent to creeks that may be utilized in creating buffer areas, trails and trail amenities. Public Works – Park Improvement, Capital Improvement Program and Development Services General Fund; Developer Fees Con. Not an action item. The Parks Master Plan in consideration include Park Equity Heat Maps to indicate park deficient areas ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.1.1 Dedication of Parkland New developments, in areas where parkland deficiencies have been identified, should be required to dedicate parkland rather than paying in–lieu fees. Public Works – Development Services General Fund Con. Not an action item. Reviewed in conjunction with project review. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.1.2 Public Use of School Sites Zone all public school sites for public use to allow for the public to use sites, when not in use by schools, through shared arrangements. Public Works – Service Center General Fund Con. Most school sites have joint use agreements in place to allow use of open spaces. The City looks for additional agreements as the opportunities arise. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.1.3 Acquisition of Surplus Properties Explore acquisition of surplus school and agency properties for parkland. Take advantage of the Naylor Act to purchase surplus school sites. Public Works – Development Services and Park Improvement General Fund Con. Not an action item. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Policy RPC ‐ 2.2 Private Open Space and Recreation Facilities Encourage the continued existence and profitability of private open space and recreation facilities through incentives and development controls. Community Development – Planning General Fund Con. Implemented through Strategies RPC‐2.2.1 and RPC 2.2.2 ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.2.1 Existing Facilities Encourage the continued existence of private recreational facilities through land use zoning and incentives. Community Development – Planning General Fund Con. Not an action item. Existing zoning allows private recreational facilities to be a conforming use. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.2.2 New Facilities *Require major developments to incorporate private open space and recreational facilities, and seek their cooperation in making the spaces publicly accessible. *Where feasible, ensure park space is publicly accessible (as opposed to private space). *Encourage active areas to serve community needs. However, a combination of active and passive areas can be provided based on the setting. *Integrate park facilities into the surroundings. *If public parkland is not dedicated, require park fees based on a formula that considers the extent to which the publicly–accessible facilities meet community need. Community Development – Planning; Public Works – Development Services Con. Not an action item. Implemented through the Municipal Code. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con11 3 PC 2-27-2024 113 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Policy RPC ‐2.3 Parkland Distribution Strive for an equitable distribution of parks and recreational facilities through the City. Park acquisition should be based on the following priority list. Accessibility to parks should be a component of the acquisition plan. High Priority: Parks in neighborhoods or areas that have few or no park and recreational areas. Medium Priority: Parks in neighborhoods that have other agency facilities such school fields and districts facilities, but no City parks. Low Priority: Neighborhoods and areas that have park and recreational areas which may be slightly less than the adopted City’s parkland standard. Private Development: Consider pocket parks in new and renovated projects to provide opportunities for publicly–accessible park areas. Public Works – Development Services and Capital Improvement Program General Fund, Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Policy RPC ‐ 2.4 Connectivity and Access Ensure that each home is within a half–mile walk of a neighborhood park or community park with neighborhood facilites; ensure that walking and biking routes are reasonably free of physical barriers, including streets with heavy traffic; provide pedestrian links between parks, wherever possible; and provide adequate directional and site signage to identify public parks. Public Works – Development Services, Transportation and Capital Improvement Program; Community Development – Planning General Fund, Capital Improvement Fund Con.Not an action iem. Reviewed in conjunction with project review to the extent allowed by State law. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.4.1 Pedestrian and Bicycle Planning Implement recommendations in the Bicycle and Pedestrian Plans to link employment and special areas, and neighborhood to services including parks, schools and neighborhood shopping. Public Works – Transportation and Capital Improvement Program General Fund; Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.4.2 Signage Adopt and maintain a master signage plan for all public parks to ensure adequate and consistent signage is provided to identify public recreational areas. Public Works – Capital Improvement Program General Fund; Capital Improvement Fund Con. Not an action item. Ongoing coordination. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Policy RPC ‐ 2.5 Range of Park Activities Provide parks and recreational facilities for a variety of recreational activities. Public Works – Park Improvement; Parks and Recreation – Business Services General Fund Con. Not an action item. Ongoing coordination and planning. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.5.1 Special Needs Extend recreational opportunities for special needs groups (senior, disabled, visually–challenged, etc.) by making improvements to existing facilities and trails. Parks and Recreation – Business Services; Public Works – Park Improvement General Fund, Capital Improvement Fund Con. Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. Jollyman All Inclusive Play Area to be completed in 2024. ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.5.2 Recreational Facilities Explore the possibility of providing additional access to existing facilities such as gymnasiums, swimming pools and tennis courts. Parks and Recreation – Business Services General Fund LR On March 2, 2021, City Council reviewed the current status of the RRRPD City Work Program item and unanimously carried the motion to delay the consideration of the annexation of the district until RRRPD completed their strategic visioning and outreach process and the RRRPD Board of Directors made a formal recommendation on the subject of City acquisition and annexation. In addition, the delay would allow for community engagement in long‐term planning for aquatics facilities in Cupertino. Memo was send to City Council November 2021 stating RRRPDs and community survey results showing opposition to the City aquisition of RRRPD. No further action taken. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con11 4 PC 2-27-2024 114 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment ACQUISITION, DISTRIBUTION AND RANGE OF SERVICES Strategy RPC ‐ 2.5.3 Community Gardens Encourage community gardens, which provide a more livable environment by controlling physical factors such as temperature, noise and pollution. Parks and Recreation – Outdoor Recreation & Youth Development; Public Works – Park Improvement General Fund Con. Not an action item. Capital Improvement Program completed Community Gardens at McClellan Ranch and Wilson Park and is looking at other opportunities elsewhere in the City. PRESERVATION Policy RPC ‐ 3.1 Preservation of Natural Areas Design parks to utilize natural features and the topography of the site in order to protect natural features and keep maintenance costs low. Public Works – Parks Improvement and Capital Improvement Program Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. PRESERVATION Strategy RPC ‐ 3.1.1 Native Planting Maximize the use of native plants and drought–tolerant planting. Public Work – Capital Improvement Program, Service Center and Park Improvement General Fund Con. Not an action item. Reviewed in conjunction with project review/Capital Improvement Program and ongoing maintenance activities. PRESERVATION Strategy RPC ‐ 3.1.2 Natural Habitat Where possible, restore and provide access to creeks and riparian habitat. Public Work – Capital Improvement Program, Service Center and Park Improvement Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. PRESERVATION Strategy RPC ‐ 3.1.3 Nature Play Areas Where appropriate, consider establishing Nature Play Areas in lieu of the more conventional play equipment. Public Works – Park Improvement Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. INTEGRATION Policy RPC ‐ 4.1 Recreational Intensity Design parks appropriate to address the facility and recreational programming required by each special area and neighborhood based on current and future plans for the areas. Public Works – Capital Improvement Program General Fund Con. Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. INTEGRATION Policy RPC ‐ 4.2 Park Safety Design parks to enhance public safety by providing visibility to the street and access for public safety responders. Public Works – Capital Improvement Program General Fund Con. Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. TRAILS Policy RPC ‐ 5.1 Open Space and Trail Linkages Dedicate or acquire open space land along creeks and utility through regional cooperation, grants and private development review. Public Works – Development Services and Capital Improvement Program; Community Development – Planning General Fund/Grants Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. TRAILS Strategy RPC ‐ 5.1.1 Pedestrian and Bike Planning Implement recommendations in the Bicycle and Pedestrian Plan that link trails and open space to neighborhoods and special areas. Public Works – Transportation Capital Improvement Fund/Grants Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. TRAILS Strategy RPC ‐ 5.1.2 Trail Projects Implement trail projects described in this Element; evaluate any safety, security and privacy impacts and mitigations associated with trail development; and work with affected neighbors in locating trails to ensure that their concerns are appropriately addressed. Public Works – Transportation and Capital Improvement Program Capital Improvement Fund/Grants Con.Not an action item. Implemented through the Bike/Ped Master Plan. E.g. Regnart Creek Trail. TRAILS Strategy RPC ‐ 5.1.3 Dedicated Trail Easements Require dedication or easements for trails, as well as their implementation, as part of the development review process, where appropriate. Public Works – Development Services and Transportation General Fund; Developer fees Con.Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. TRAILS Strategy RPC ‐ 5.1.4 Joint Use Agreement Establish a Joint Use Agreement with the SCVWD that enhances the implementation of a trail program which increases the use of, and sets standards and measures for, creek trails. Public Works – Capital Improvement Program and Transportation General Fund Con. Established on an as‐needed basis. E.g. Regnart Creek Trail. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con11 5 PC 2-27-2024 115 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment TRAILS Policy RPC ‐ 5.2 Pedestrian and Bicycle Paths Develop a citywide network of pedestrian and bicycle pathways to connect employment center, shopping areas and neighborhoods to services including parks, schools, libraries and neighborhood centers. Public Works – Transportation and Capital Improvement Program Capital Improvement Fund/Grants Con.Not an action item. Implmented through the Bike/Ped Master Plans. RECREATION PROGRAMS AND SERVICES Policy RPC ‐ 6.1 Diverse Programs Ensure that the City continues to offer a wide range of programs to serve diverse populations of all ages and abilities. Parks and Recreation – Business Services General Fund Con. Not an action item. RECREATION PROGRAMS AND SERVICES Policy RPC ‐ 6.2 Partnerships Enhance the City’s recreational programs and library service through partnerships with other agencies and non–profit organizations. Maintain and strengthen existing agreements with agencies and non–profit organizations, including the Library District, to ensure progressive excellence in the facilities, programs, and services provided to the diverse and growing Cupertino population. Parks and Recreation – Business Services; City Manager General Fund Con. Not an action item. RECREATION PROGRAMS AND SERVICES Policy RPC ‐ 6.3 Art and Culture Utilize parks as locations of art and culture and to educate the community about the City’s history, and explore the potential to use art in facilities and utilities when located in parks. Public Works – Capital Improvement Program and Development Services; Parks and Recreation – Business Services General Fund Con. Not an action item. Reviewed in conjunction with project review/ Capital Improvement Program. RECREATION PROGRAMS AND SERVICES Policy RPC ‐ 6.4 Library Service Encourage the library to continue to improve service levels by incorporating new technology and expanding the library collections and services. City Manager General Fund Con. Not an action item. Ongoing coordination. The Library expansion was completed in 2022. SUSTAINABLE AND FLEXIBLE Policy RPC ‐ 7.1 Sustainable Design Ensure that City facilities are sustainably designed to minimize impacts on the environment.Public Works – Capital Improvement Program Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with Capital Improvement Program. SUSTAINABLE AND FLEXIBLE Policy RPC ‐ 7.2 Flexibility Design facilities to be flexible to address changing community needs.Public Works – Capital Improvement Program Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with Capital Improvement Program. SUSTAINABLE AND FLEXIBLE Policy RPC ‐ 7.3 Maintenance Design facilities to reduce maintenance, and ensure that facilities are maintained and upgraded adequately. Public Works – Capital Improvement Program Capital Improvement Fund Con.Not an action item. Reviewed in conjunction with Capital Improvement Program. COMMUNITY SERVICES Policy RPC ‐ 8.1 School Districts Partner with school districts to allow community use of their sports fields and facilities. Public Works – Service Center; Parks and Recreation – Business Services General Fund Con. Not an action item. Ongoing coordination. COMMUNITY SERVICES Strategy RPC ‐ 8.1.1 Shared Facilities Maintain and enhance arrangements with schools for the use of sports fields, theaters, meeting spaces and other facilities through maintenance agreements and other partnerships. Parks and Recreation – Business Services; Public Works – Service Center General Fund Con. Not an action item. Ongoing coordination. COMMUNITY SERVICES Strategy RPC ‐ 8.1.2 School Expansion Encourage schools to meet their expansion needs without reducing the size of their sports fields. Public Works – Service Center; Parks and Recreation – Business Services General Fund Con. Not an action item. Ongoing coordination. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con11 6 PC 2-27-2024 116 of 163 Topic Policy/ Strategy No.Policy/Strategy Title General Plan Policy/Strategy Text Responsible Department(s) Funding Source(s)Timeframe Comment COMMUNITY SERVICES Strategy RPC ‐ 8.1.3 School Facility Needs Collaborate with schools on their facility needs through sharing of development information and partnerships through major development projects. Community Development – Planning; City Manager General Fund Con. Not an action item. Ongoing coordination. Ongoing = Grey, Completed = Green, In-Progress = Yellow , Pending = Orange Timeframe: Immediate (2019-2022) = IM, Long Range (2022-2040) = LR, Continual = Con11 7 PC 2-27-2024 117 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2023 (Jan. 1 - Dec. 31)Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031 Date Application Submitted Total Approved Units by Project Total Disapproved Units by Project Streamlining Application Status Project Type Notes 2 34 6 7 8 9 11 12 13 Prior APN+Current APN Street Address Project Name+Local Jurisdiction Tracking ID Unit Category (SFA,SFD,2 to 4,5+,ADU,MH) Tenure R=Renter O=Owner Date Application Submitted (see instructions) Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low-Income Deed Restricted Low-Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Total PROPOSED Units by Project Total APPROVED Units by project Total DISAPPROVED Units by Project Please select streamlining provision/s the application was submitted pursuant to. Did the housing development application seek incentives or concessions pursuant to Government Code section 65915? Were incentives or concessions reqested pursuant to Government Code section 65915 approved? Please indicate the status of the application. Is the project considered a ministerial project or discretionary project? Notes+ Summary Row: Start Data Entry Below 3 6 2 5 2 6 72 96 89 0 362 06 036 362 06 036 11226 BUBB RD R-2022-011 SFD O 1/17/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence on a previously subdivided lot 1:3 375 35 054 375 35 054 19040 MEIGGS LN R-2022-030 SFD O 1/18/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 359 32 036 359 32 036 7439 STANFORD PL R-2022-034 SFD O 2/2/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 359 13 137 359 13 136 10476/10478 S STELLING RD R-2022-035 SFD O 3/14/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU on a previously subdivided lot 1:2 ABAG 30/30/30/10 359 13 137 359 13 137 10400/10468 S STELLING RD R-2022-036 SFD O 3/14/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU on a previously subdivided lot 1:2 ABAG 30/30/30/10 375 37 038 375 37 038 19040 BARNHART AVE R-2022-043 SFD O 3/6/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 326 28 066 326 28 066 21076 GRENOLA DR R-2022-046 SFD O 4/20/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 342 14 095 342 14 095 10116 PRADO VISTA DR R-2022-051 SFD O 10/18/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 326 28 088 326 28 088 10481 N STELLING RD R-2023-006 SFD O 9/5/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 375 07 042 375 07 042 10080 S TANTAU AVE R-2023-010 SFD O 8/22/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 375 16 053 375 16 053 18831 BARNHART AVE R-2023-011 SFD O 8/22/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 375 04 010 375 04 010 19375 CALLE DE BARCELONA R-2023-012 SFD O 8/15/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADUABAG 30/30/30/10 342 14 040 342 14 040 10222 LOCKWOOD DR R-2023-014 SFD O 10/3/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 375 18 044 375 18 044 10409 JOHNSON AVE R-2023-019 SFD O 9/21/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 375 11 011 375 11 011 10080 Judy Ave R-2022-055 SFD O 4/7/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 326 31 005 326 31 005 20966 Alves Drive R-2022-017 SFD O 5/24/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 366 17 057 366 17 057 7632 Normandy Way R-2022-031 SFD O 6/8/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 375 35 055 375 35 055 19030 Meiggs Lane R-2023-013 SFD O 7/19/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 375 29 034 375 29 034 18751 NEWSOM AVE R-2023-015 SFD O 7/27/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 356 14 024 356 14 024 21900 RUCKER DR R-2023-003 SFD O 8/11/2023 1 1 1 0 NONE No N/A Approved Discretionary Second Story Addition with proposed JADU ABAG 30/30/30/10 375 28 011 375 28 011 10589 Gascoigne Dr R-2023-023 SFD O 10/19/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 375 11 031 375 11 031 10205 Bret Ave R-2023-018 SFD O 10/26/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 Table A Cells in grey contain auto-calculation formulas 51 Project Identifier Unit Types Proposed Units - Affordability by Household Incomes Density Bonus Law Applications 10 Housing Development Applications Submitted 11 8 PC 2-27-2024 118 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2023 (Jan. 1 - Dec. 31)Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031 Date Application Submitted Total Approved Units by Project Total Disapproved Units by Project Streamlining Application Status Project Type Notes 2 34 6 7 8 9 11 12 13 Prior APN+Current APN Street Address Project Name+Local Jurisdiction Tracking ID Unit Category (SFA,SFD,2 to 4,5+,ADU,MH) Tenure R=Renter O=Owner Date Application Submitted (see instructions) Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low-Income Deed Restricted Low-Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Total PROPOSED Units by Project Total APPROVED Units by project Total DISAPPROVED Units by Project Please select streamlining provision/s the application was submitted pursuant to. Did the housing development application seek incentives or concessions pursuant to Government Code section 65915? Were incentives or concessions reqested pursuant to Government Code section 65915 approved? Please indicate the status of the application. Is the project considered a ministerial project or discretionary project? Notes+ Table A Cells in grey contain auto-calculation formulas 51 Project Identifier Unit Types Proposed Units - Affordability by Household Incomes Density Bonus Law Applications 10 Housing Development Applications Submitted 375 26 058 375 26 058 18630 CRABTREE AVE R-2023-008 SFD O 11/2/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 375 37 020 375 37 020 10524 S. Tantau Ave R-2023-007 SFD O 11/21/2023 1 1 1 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence 375 07 008 375 07 008 10081 S. Tantau R-2023-036 SFD O 12/14/2023 1 1 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 375 35 050 375 35 050 19080 Meiggs Ln R-2022-020 SFD O 12/21/2023 2 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU ABAG 30/30/30/10 362 18 008 362 18 008 7752 Orion Lane R-2021-014 SFD O 2/23/2023 2 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU on a previously subdivided lot 1:2 ABAG 30/30/30/10 362 18 008 362 18 008 7752 Orion Lane R-2021-015 SFD O 2/23/2023 2 2 2 0 NONE No N/A Approved Discretionary Construction of a new two-story single-family residence & ADU on a previously subdivided lot 1:2 ABAG 30/30/30/10 366 10 061 366-10-061, -126 1655 S De Anza Blvd Coach House DP-2021-002 5+ O 6/21/2023 1 10 11 11 0 NONE Yes Yes Approved Discretionary Base Density 25 Units, new density 34. Desnity bonus of 9 market rate units. Project Provided 1 BMR median income ownership unit, 3 BMR very low incom rentall 366 10 061 366-10-061, -126 1655 S De Anza Blvd Coach House DP-2021-002 5+ R 6/21/2023 3 1 19 23 23 0 NONE Yes Yes Approved Discretionary Base Density 25 Units, new density 34. Desnity bonus of 9 market rate units. Project Provided 1 BMR median income ownership unit, 3 BMR very low incom rental 316 30 055 316 30 055 10572 CYPRESS BLD-2023-1494 ADU O 12/4/2023 1 1 1 0 NONE No No Approved Ministerial New ADU Building permit Issued 2023 ABAG 30/30/30/10 375 07 042 375 07 042 10078 S TANTAU BLD-2023-1894 ADU O 12/5/2023 1 1 1 0 NONE No No Approved Ministerial New ADU Building permit Issued 2023 ABAG 30/30/30/10 375 19 023 375 19 023 10140 CALVERT DR BLD-2023-0022 SFD O 6/5/2023 1 1 2 2 0 NONE No No Approved Ministerial New SFR & ADU Building permit Issued 2023. Involves demolition of existing home ABAG 30/30/30/10 375 07 042 375 07 042 10080 S TANTAU AVE BLD-2023-1891 SFD O 12/5/2023 1 1 1 0 NONE No No Approved Ministerial Construction of a new two-story single-family residence 359 19 043 359 19 043 7540 MCCLELLAN RD BLD-2023-0402 SFD O 11/21/2023 1 1 1 0 NONE No No Approved Ministerial Construction of a new two-story single-family residence 326 02 021 326 02 021 22091 HIBISCUS CT BLD-2023-0247 SFD O 7/20/2023 1 1 1 0 NONE No No Approved Ministerial Construction of a new two-story single-family residence 369 09 046 369 09 046 19721 BIXBY DR BLD-2023-1043 SFD O 9/7/2023 1 1 1 0 NONE No No Approved Ministerial Construction of a new two-story single-family residence 375 28 026 375 28 026 10624 JOHNSON AVE BLD-2023-0164 SFD O 1/25/2023 2 2 2 0 NONE No No Approved Ministerial New SFR & ADU Building permit Issued 2023. Involves demolition of existing home ABAG 30/30/30/10 359 07 021 359 07 021 10046 BIANCHI WAY DP-2023-001 SFA O 2/1/2023 1 6 7 0 0 NONE Yes N/A Pending Discretionary 7 Townhomes (including 1 moderate income unit) to replace 4 existing units 11 9 PC 2-27-2024 119 of 163 Table A2 23 56 Prior APN+Current APN Street Address Project Name+Local Jurisdiction Tracking ID Unit Category (SFA,SFD,2 to 4,5+,ADU,MH) Tenure R=Renter O=Owner Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low- Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Entitlement Date Approved # of Units issued Entitlements Summary Row: Start Data Entry Below 3 5 0 5 1 5 59 78 326 28 031 326 28 031 10345 Ann Arbor Ave BLD-2020-1720 ADU O 0 326 28 031 326 28 031 10345 Ann Arbor Ave BLD-2020-1720 SFD O 0 357 16 162 357 16 162 10104 Byrne Ave 15110051 SFD O 0 357 16 162 357 16 162 10104 Byrne Ave 15110052 ADU O 0 359 11 019 359 11 019 20600 Rodrigues Ave BLD-2019-0910 SFD O 0 359 11 019 359 11 019 20600 Rodrigues Ave BLD-2019-0910 ADU O 0 326 47 049 326 47 049 10396 Noel BLD-2019-1046 ADU O 0 369 23 051 369 23 051 10810 S Blaney Ave BLD-2020-0479 ADU O 0 362 13 014 362 13 014 7929 Festival BLD-2020-1038 ADU O 0 362 13 014 362 13 014 7929 Festival BLD-2020-1038 SFD O 0 342 14 040 342 14 040 10228 Lockwood BLD-2020-1056 ADU O 0 359 10 058 359 10 058 20713 Rodrigues Ave BLD-2020-1690 SFD O 0 359 10 058 359 10 058 20713 Rodrigues Ave BLD-2020-1690 ADU O 0 375 29 046 375 29 046 18782 Hanna BLD-2020-1714 SFD O 0 375 29 046 375 29 046 18782 Hanna BLD-2020-1714 ADU O 0 369 29 040 369 29 040 10397 Las Ondas Way BLD-2020-1774 ADU O 0 366 18 043 366 18 043 1318 Flower BLD-2020-1831 SFD O 0 366 18 043 366 18 043 1318 Flower BLD-2020-1831 ADU O 0 375 24 005 375 24 005 10408 Sterling Blvd BLD-2020-1855 SFD O 0 375 24 005 375 24 005 10408 Sterling Blvd BLD-2020-1855 ADU O 0 357 04 029 357 04 029 10485 Scenic BLD-2020-2144 SFD O 0 357 04 029 357 04 029 10485 Scenic BLD-2020-2144 ADU O 0 375 11 004 375 11 004 10176 Judy Ave BLD-2021-0169 SFD O 0 375 11 004 375 11 004 10176 Judy Ave BLD-2021-0169 ADU O 0 375 35 035 375 35 035 5905 Sutton Park BLD-2021-0186 ADU O 0 375 14 003 375 14 003 10285 Moretti Dr BLD-2021-0393 ADU O 0 375 28 015 375 28 015 10621 Gascoigne Dr BLD-2021-0541 SFD O 0 375 28 015 375 28 015 10621 Gascoigne Dr BLD-2021-0541 ADU O 0 375 13 021 375 13 021 18811 Loree Ave BLD-2021-0613 SFD O 0 375 13 021 375 13 021 18811 Loree Ave BLD-2021-0613 ADU O 0 326 19 081 326 19 081 21852 Monte Ct BLD-2021-0739 ADU O 0 326 30 103 326 30 103 10511 Glencoe Dr BLD-2021-0780 ADU O 0 375 22 024 375 22 024 10618 Gascoigne Dr BLD-2021-1040 SFD O 0 375 22 024 375 22 024 10618 Gascoigne Dr BLD-2021-1040 ADU O 0 375 11 045 375 11 045 10054 Bret BLD-2021-1566 ADU O 0 342 14 001 342 14 001 22782 Stevens Creek BLD-2021-1591 ADU O 0 316 33 025 316 33 025 10355 Plum Tree Ln BLD-2021-1693 ADU O 0 375 14 004 375 14 004 10295 Moretti Dr BLD-2021-2163 SFD O 0 375 14 004 375 14 004 10295 Moretti Dr BLD-2021-2163 ADU O 0 316 34 019 316 34 019 10573 Cedar Tree BLD-2021-2229 ADU O 0 316 26 062 316 26 062 10234 Parlett BLD-2021-2238 ADU O 0 375 10 007 375 10 007 10348 Judy Ave BLD-2021-2333 ADU O 0 357 19 096 357 19 096 10380 Imperial Ave BLD-2021-2383 ADU O 0 342 61 022 342 61 022 10547 Manzanita Ct BLD-2021-2520 ADU O 0 1 4 Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units Project Identifier Unit Types Affordability by Household Incomes - Completed Entitlement 12 0 PC 2-27-2024 120 of 163 375 25 007 375 25 007 18645 Ralya Ct BLD-2022-0007 SFD O 0 375 25 007 375 25 007 18645 Ralya Ct BLD-2022-0007 ADU O 0 362 24 054 362 24 054 1197 Candlelight Way BLD-2022-0530 ADU O 0 342 58 012 342 58 012 22179 Hammond Way BLD-2022-0544 ADU O 0 375 27 042 375 27 042 18750 Barnhart Ave BLD-2022-0605 SFD O 0 375 27 042 375 27 042 18750 Barnhart Ave BLD-2022-0605 ADU O 0 359 26 037 359 26 037 7480 De La Farge Dr BLD-2022-0623 SFD O 0 359 26 037 359 26 037 7480 De La Farge Dr BLD-2022-0623 ADU O 0 357 02 046 357 02 046 10419 Mira Vista BLD-2022-1257 ADU O 0 326 41 019 326 41 019 21308 Rumford BLD-2022-1310 ADU O 0 326 41 059 326 41 059 10468 Anson BLD-2022-1380 ADU O 0 362 25 016 362 25 016 7675 Shadowhill Ln BLD-2022-1385 ADU O 0 316 28 023 316 28 023 10185 Denison BLD-2022-1493 ADU O 0 375 19 017 375 19 017 18745 Loree Ave BLD-2022-1624 SFD O 0 375 19 017 375 19 017 18745 Loree Ave BLD-2022-1624 ADU O 0 375 19 021 375 19 021 10160 Calvert BLD-2023-0380 ADU O 0 342 29 011 342 29 011 10472 Lockwood Dr BLD-2023-1023 ADU O 0 375 14 013 375 14 013 10385 Moretti Dr B-2019-1266 SFD O 0 326 28 094 326 28 094 10395 N Stelling Rd B-2019-0310 SFD O 0 375 19 008 375 19 008 18655 Loree Ave B-2017-0038 SFD O 0 357 14 020 357 14 020 10455 Orange Ave B-2019-0240 SFD O 0 375 11 026 375 11 026 10135 Bret Ave BLD-2021-0920 SFD O 0 359 13 016 359 13 016 10459 Bonny Dr BLD-2022-1303 SFD O 0 369 21 027 369 21 027 10826 Brookwell BLD-2021-0315 SFD O 0 375 11 043 375 11 043 10080 Bret Ave BLD-2021-1308 SFD O 0 375 17 047 375 17 047 10481 Johnson BLD-2020-2021 SFD O 0 375 08 053 375 08 053 10395 Judy Ave BLD-2022-0610 SFD O 0 375 33 028 375 33 028 18881 Pendergast Ave BLD-2021-1299 SFD O 0 359 18 047 359 18 047 20565 Kirwin Ln BLD-2021-1195 SFD O 0 369 27 032 369 27 032 858 Betlin Ave BLD-2020-1836 SFD O 0 362 11 018 362 11 018 1202 Stafford Dr BLD-2021-0147 SFD O 0 375 17 001 375 17 001 10430 Wunderlich Dr BLD-2021-1249 SFD O 0 369 27 050 369 27 050 879 Bette Ave BLD-2019-1402 SFD O 0 357 15 083 357 15 083 21841 Alcazar Ave BLD-2020-0859 SFD O 0 362 18 008 362 18 008 7752 Orion Lane R-2021-014 SFD O 1 2/23/2023 1 362 18 008 362 18 008 7752 Orion Lane R-2021-014 ADU O 1 2/23/2023 1 362 18 008 362 18 008 7752 Orion Lane R-2021-015 SFD O 1 2/23/2023 1 362 18 008 362 18 008 7752 Orion Lane R-2021-015 ADU O 1 2/23/2023 1 366 10 061 366-10-061, -126 1655 S De Anza Blvd Coach House DP-2021-002 5+ O 1 10 6/21/2023 11 366 10 061 366-10-061, -126 1655 S De Anza Blvd Coach House DP-2021-002 5+ R 3 19 6/21/2023 22 326 27 035 326 27 043 21563 POINT REYES TER Westport BLD-2022-1052 SFA O 0 327 27 035 326 27 043 21561 POINT REYES TER Westport BLD-2022-1053 SFA O 0 328 27 035 326 27 043 21559 POINT REYES TER Westport BLD-2022-1054 SFA O 0 329 27 035 326 27 043 21557 POINT REYES TER Westport BLD-2022-1055 SFA O 0 330 27 035 326 27 043 21553 POINT REYES TER Westport BLD-2022-1056 SFA O 0 331 27 035 326 27 043 21551 POINT REYES TER Westport BLD-2022-1057 SFA O 0 332 27 035 326 27 043 21511 DANA POINT LN Westport BLD-2022-1060 SFA O 0 333 27 035 326 27 043 21509 DANA POINT LN Westport BLD-2022-1061 SFA O 0 334 27 035 326 27 043 21507 DANA POINT LN Westport BLD-2022-1062 SFA O 0 335 27 035 326 27 043 21505 DANA POINT LN Westport BLD-2022-1063 SFA O 0 336 27 035 326 27 043 21503 DANA POINT LN Westport BLD-2022-1064 SFA O 0 337 27 035 326 27 043 21501 DANA POINT LN Westport BLD-2022-1065 SFA O 0 362 06 036 362 06 036 11226 BUBB RD R-2022-011 SFD O 1 1/17/2023 1 375 35 054 375 35 054 19040 MEIGGS LN R-2022-030 SFD O 1 1 1/18/2023 2 359 32 036 359 32 036 7439 STANFORD PL R-2022-034 SFD O 1 1 2/2/2023 2 12 1 PC 2-27-2024 121 of 163 359 13 137 359 13 136 10476/10478 S STELLING RD R-2022-035 SFD O 1 1 3/14/2023 2 359 13 137 359 13 137 10400/10468 S STELLING RD R-2022-036 SFD O 1 1 3/14/2023 2 375 37 038 375 37 038 19040 BARNHART AVE R-2022-043 SFD O 1 3/6/2023 1 326 28 066 326 28 066 21076 GRENOLA DR R-2022-046 SFD O 1 4/20/2023 1 342 14 095 342 14 095 10116 PRADO VISTA DR R-2022-051 SFD O 1 10/18/2023 1 326 28 088 326 28 088 10481 N STELLING RD R-2023-006 SFD O 1 9/5/2023 1 375 07 042 375 07 042 10080 S TANTAU AVE R-2023-010 SFD O 1 1 8/22/2023 2 375 16 053 375 16 053 18831 BARNHART AVE R-2023-011 SFD O 1 8/22/2023 1 375 04 010 375 04 010 19375 CALLE DE BARCELONA R-2023-012 SFD O 1 1 8/15/2023 2 342 14 040 342 14 040 10222 LOCKWOOD DR R-2023-014 SFD O 1 10/3/2023 1 375 18 044 375 18 044 10409 JOHNSON AVE R-2023-019 SFD O 1 1 9/21/2023 2 375 11 011 375 11 011 10080 Judy Ave R-2022-055 SFD O 1 4/7/2023 1 326 31 005 326 31 005 20966 Alves Drive R-2022-017 SFD O 1 1 5/24/2023 2 366 17 057 366 17 057 7632 Normandy Way R-2022-031 SFD O 1 1 6/8/2023 2 375 35 055 375 35 055 19030 Meiggs Lane R-2023-013 SFD O 1 1 7/19/2023 2 375 29 034 375 29 034 18751 NEWSOM AVE R-2023-015 SFD O 1 7/27/2023 1 356 14 024 356 14 024 21900 RUCKER DR R-2023-003 SFD O 1 8/11/2023 1 375 28 011 375 28 011 10589 Gascoigne Dr R-2023-023 SFD O 1 1 10/19/2023 2 375 11 031 375 11 031 10205 Bret Ave R-2023-018 SFD O 1110/26/2023 2 375 26 058 375 26 058 18630 CRABTREE AVE R-2023-008 SFD O 1 1 11/2/2023 2 375 37 020 375 37 020 10524 S. Tantau Ave R-2023-007 SFD O 1 11/21/2023 1 375 07 008 375 07 008 10081 S. Tantau R-2023-036 SFD O 1112/14/2023 2 375 35 050 375 35 050 19080 Meiggs Ln R-2022-020 SFD O 2 12/21/2023 2 326 43 042 326 43 042 10692 PEBBLE BLD-2022-0652 ADU O 0 369 05 022 369 05 022 10153 DEEPROSE BLD-2022-0931 ADU O 0 369 21 027 369 21 027 10828 BROOKWELL BLD-2022-2397 ADU O 0 375 11 022 375 11 022 10083 BRET Ave BLD-2022-2183 ADU O 0 369 11 004 369 11 004 10395 LANSDALE BLD-2022-1977 ADU O 0 375 25 049 375 25 049 18689 CRABTREE BLD-2022-1632 ADU O 0 375 25 049 375 25 049 18689 CRABTREE BLD-2022-1632 ADU O 0 316 24 016 316 24 016 10201 RANDY BLD-2022-1115 ADU O 0 326 49 015 326 49 015 10633 STOKES BLD-2022-2181 ADU O 0 326 49 015 326 49 015 10633 STOKES BLD-2022-2181 ADU O 0 369 16 024 369 16 024 10569 MILLER AVE BLD-2022-1899 ADU O 0 316 30 055 316 30 055 10572 CYPRESS BLD-2023-1494 ADU O 0 342 14 094 342 14 094 10134 PRADO VISTA BLD-2022-2513 ADU O 0 375 07 042 375 07 042 10078 S TANTAU BLD-2023-1894 ADU O 0 342 29 054 342 29 054 10463 MERRIMAN BLD-2022-0558 ADU O 0 369 24 024 369 24 024 6611 JOHN DR BLD-2022-0785 SFD O 0 375 07 044 375 07 044 10052 S TANTAU AVE BLD-2022-0436 SFD O 0 375 14 034 375 14 034 10300 STERN AVE BLD-2022-2469 SFD O 0 316 24 016 316 24 016 10199 RANDY BLD-2022-1114 SFD O 0 362 27 036 362 27 036 1080 S STELLING RD BLD-2022-0375 SFD O 0 375 08 010 375 08 010 19161 MURIEL LN BLD-2022-2438 SFD O 0 375 23 007 375 23 007 10552 GASCOIGNE DR BLD-2022-2454 SFD O 0 375 32 049 375 32 049 10755 MINETTE DR BLD-2022-2471 SFD O 0 375 24 021 375 24 021 10270 STERLING BLVD BLD-2022-1655 SFD O 0 375 24 021 375 24 021 10270 STERLING BLVD BLD-2022-1655 SFD O 0 375 28 026 375 28 026 10624 JOHNSON AVE BLD-2023-0164 SFD O 0 375 33 051 375 33 051 18816 PENDERGAST AVE BLD-2022-2236 SFD O 0 12 2 PC 2-27-2024 122 of 163 375 25 005 375 25 005 18625 RALYA CT BLD-2022-2045 SFD O 0 375 40 042 375 40 042 19181 PHIL LN BLD-2022-2499 SFD O 0 375 29 052 375 29 052 18720 HANNA DR BLD-2022-2491 SFD O 0 375 23 034 375 23 034 10526 STERLING BLVD BLD-2022-2332 SFD O 0 375 33 063 375 33 063 18901 TUGGLE AVE BLD-2021-2452 SFD O 0 326 49 015 326 49 015 10631 STOKES AVE BLD-2022-2180 SFD O 0 375 19 023 375 19 023 10140 CALVERT DR BLD-2023-0022 SFD O 0 375 07 042 375 07 042 10080 S TANTAU AVE BLD-2023-1891 SFD O 0 362 04 047 362 04 047 7922 WOODLARK WAY BLD-2021-0379 SFD O 0 375 08 029 375 08 029 19161 TILSON AVE BLD-2022-2076 SFD O 0 375 32 040 375 32 040 10683 MINETTE PL BLD-2022-1748 SFD O 0 326 30 005 326 30 005 20941 ALVES DR BLD-2021-2506 SFD O 0 359 19 043 359 19 043 7540 MCCLELLAN RD BLD-2023-0402 SFD O 0 326 08 042 326 08 042 10682 FLORA VISTA AVE BLD-2022-2258 SFD O 0 316 35 003 316 35 003 19651 MERRITT DR BLD-2022-2150 SFD O 0 359 19 005 359 19 005 10567 JOHN WA BLD-2022-2111 SFD O 0 375 17 012 375 17 012 10320 WUNDERLICH DR BLD-2022-0396 SFD O 0 326 02 021 326 02 021 22091 HIBISCUS CT BLD-2023-0247 SFD O 0 359 06 014 359 06 014 902 SAGE CT BLD-2022-2349 SFD O 0 369 09 046 369 09 046 19721 BIXBY DR BLD-2023-1043 SFD O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 3 PC 2-27-2024 123 of 163 Table A2 Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 89 Current APN Street Address Project Name+ Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low- Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Building Permits Date Issued # of Units Issued Building Permits 0 10 0 10 0 10 38 68 326 28 031 10345 Ann Arbor Ave 0 326 28 031 10345 Ann Arbor Ave 0 357 16 162 10104 Byrne Ave 0 357 16 162 10104 Byrne Ave 0 359 11 019 20600 Rodrigues Ave 0 359 11 019 20600 Rodrigues Ave 0 326 47 049 10396 Noel 0 369 23 051 10810 S Blaney Ave 0 362 13 014 7929 Festival 0 362 13 014 7929 Festival 0 342 14 040 10228 Lockwood 0 359 10 058 20713 Rodrigues Ave 0 359 10 058 20713 Rodrigues Ave 0 375 29 046 18782 Hanna 0 375 29 046 18782 Hanna 0 369 29 040 10397 Las Ondas Way 0 366 18 043 1318 Flower 0 366 18 043 1318 Flower 0 375 24 005 10408 Sterling Blvd 0 375 24 005 10408 Sterling Blvd 0 357 04 029 10485 Scenic 0 357 04 029 10485 Scenic 0 375 11 004 10176 Judy Ave 0 375 11 004 10176 Judy Ave 0 375 35 035 5905 Sutton Park 0 375 14 003 10285 Moretti Dr 0 375 28 015 10621 Gascoigne Dr 0 375 28 015 10621 Gascoigne Dr 0 375 13 021 18811 Loree Ave 0 375 13 021 18811 Loree Ave 0 326 19 081 21852 Monte Ct 0 7 Project Identifier Affordability by Household Incomes - Building Permits 12 4 PC 2-27-2024 124 of 163 326 30 103 10511 Glencoe Dr 0 375 22 024 10618 Gascoigne Dr 0 375 22 024 10618 Gascoigne Dr 0 375 11 045 10054 Bret 0 342 14 001 22782 Stevens Creek 0 316 33 025 10355 Plum Tree Ln 0 375 14 004 10295 Moretti Dr 0 375 14 004 10295 Moretti Dr 0 316 34 019 10573 Cedar Tree 0 316 26 062 10234 Parlett 0 375 10 007 10348 Judy Ave 0 357 19 096 10380 Imperial Ave 0 342 61 022 10547 Manzanita Ct 0 375 25 007 18645 Ralya Ct 0 375 25 007 18645 Ralya Ct 0 362 24 054 1197 Candlelight Way 0 342 58 012 22179 Hammond Way 0 375 27 042 18750 Barnhart Ave 0 375 27 042 18750 Barnhart Ave 0 359 26 037 7480 De La Farge Dr 0 359 26 037 7480 De La Farge Dr 0 357 02 046 10419 Mira Vista 0 326 41 019 21308 Rumford 0 326 41 059 10468 Anson 0 362 25 016 7675 Shadowhill Ln 0 316 28 023 10185 Denison 0 375 19 017 18745 Loree Ave 0 375 19 017 18745 Loree Ave 0 375 19 021 10160 Calvert 1 7/21/2023 1 342 29 011 10472 Lockwood Dr 1 11/8/2023 1 375 14 013 10385 Moretti Dr 0 326 28 094 10395 N Stelling Rd 0 375 19 008 18655 Loree Ave 0 357 14 020 10455 Orange Ave 0 375 11 026 10135 Bret Ave 0 359 13 016 10459 Bonny Dr 0 369 21 027 10826 Brookwell 0 375 11 043 10080 Bret Ave 0 375 17 047 10481 Johnson Ave 0 375 08 053 10395 Judy Ave 0 375 33 028 18881 Pendergast Ave 0 359 18 047 20565 Kirwin Ln 0 369 27 032 858 Betlin Ave 0 362 11 018 1202 Stafford Dr 0 375 17 001 10430 Wunderlich Dr 0 369 27 050 879 Bette Ave 0 12 5 PC 2-27-2024 125 of 163 357 15 083 21841 Alcazar Ave 0 362 18 008 7752 Orion Lane 0 362 18 008 7752 Orion Lane 0 362 18 008 7752 Orion Lane 0 362 18 008 7752 Orion Lane 0 366-10-061, -126 1655 S De Anza Blvd Coach House 0 366-10-061, -126 1655 S De Anza Blvd Coach House 0 326 27 043 21563 POINT REYES TER Westport 0 326 27 043 21561 POINT REYES TER Westport 0 326 27 043 21559 POINT REYES TER Westport 0 326 27 043 21557 POINT REYES TER Westport 0 326 27 043 21553 POINT REYES TER Westport 0 326 27 043 21551 POINT REYES TER Westport 0 326 27 043 21511 DANA POINT LN Westport 0 326 27 043 21509 DANA POINT LN Westport 0 326 27 043 21507 DANA POINT LN Westport 0 326 27 043 21505 DANA POINT LN Westport 0 326 27 043 21503 DANA POINT LN Westport 0 326 27 043 21501 DANA POINT LN Westport 0 362 06 036 11226 BUBB RD 0 375 35 054 19040 MEIGGS LN 0 359 32 036 7439 STANFORD PL 0 359 13 136 10476/10478 S STELLING RD 0 359 13 137 10400/10468 S STELLING RD 0 375 37 038 19040 BARNHART AVE 0 326 28 066 21076 GRENOLA DR 0 342 14 095 10116 PRADO VISTA DR 0 326 28 088 10481 N STELLING RD 0 375 07 042 10080 S TANTAU AVE 0 375 16 053 18831 BARNHART AVE 0 375 04 010 19375 CALLE DE BARCELONA 0 342 14 040 10222 LOCKWOOD DR 0 375 18 044 10409 JOHNSON AVE 0 375 11 011 10080 Judy Ave 0 326 31 005 20966 Alves Drive 0 12 6 PC 2-27-2024 126 of 163 366 17 057 7632 Normandy Way 0 375 35 055 19030 Meiggs Lane 0 375 29 034 18751 NEWSOM AVE 0 356 14 024 21900 RUCKER DR 0 375 28 011 10589 Gascoigne Dr 0 375 11 031 10205 Bret Ave 0 375 26 058 18630 CRABTREE AVE 0 375 37 020 10524 S. Tantau Ave 0 375 07 008 10081 S. Tantau 0 375 35 050 19080 Meiggs Ln 0 326 43 042 10692 PEBBLE 1 6/28/2023 1 369 05 022 10153 DEEPROSE 1 5/2/2023 1 369 21 027 10828 BROOKWELL 1 8/6/2023 1 375 11 022 10083 BRET Ave 1 10/9/2023 1 369 11 004 10395 LANSDALE 1 7/31/2023 1 375 25 049 18689 CRABTREE 1 10/23/2023 1 375 25 049 18689 CRABTREE 1 10/23/2023 1 316 24 016 10201 RANDY 1 5/3/2023 1 326 49 015 10633 STOKES 1 7/18/2023 1 326 49 015 10633 STOKES 1 7/18/2023 1 369 16 024 10569 MILLER AVE 1 9/5/2023 1 316 30 055 10572 CYPRESS 1 12/4/2023 1 342 14 094 10134 PRADO VISTA 1 5/25/2023 1 375 07 042 10078 S TANTAU 1 12/5/2023 1 342 29 054 10463 MERRIMAN 1 1/27/2023 1 369 24 024 6611 JOHN DR 1 1 6/27/2023 2 375 07 044 10052 S TANTAU AVE 1 1 1/30/2023 2 375 14 034 10300 STERN AVE 1 1 3/30/2023 2 316 24 016 10199 RANDY 1 1 5/3/2023 2 362 27 036 1080 S STELLING RD 1 1 3/1/2023 2 375 08 010 19161 MURIEL LN 1 1 10/18/2023 2 375 23 007 10552 GASCOIGNE DR 1 1 5/25/2023 2 375 32 049 10755 MINETTE DR 1 1 4/24/2023 2 375 24 021 10270 STERLING BLVD 1 1 5/3/2023 2 375 24 021 10270 STERLING BLVD 1 1 5/3/2023 2 375 28 026 10624 JOHNSON AVE 1 1 1/25/2023 2 375 33 051 18816 PENDERGAST AVE 1 1 5/30/2023 2 375 25 005 18625 RALYA CT 1 1 7/18/2023 2 375 40 042 19181 PHIL LN 1 1 5/2/2023 2 375 29 052 18720 HANNA DR 1 1 8/28/2023 2 12 7 PC 2-27-2024 127 of 163 375 23 034 10526 STERLING BLVD 2 4/28/2023 2 375 33 063 18901 TUGGLE AVE 2 9/25/2023 2 326 49 015 10631 STOKES AVE 2 6/26/2023 2 375 19 023 10140 CALVERT DR 2 6/5/2023 2 375 07 042 10080 S TANTAU AVE 1 12/5/2023 1 362 04 047 7922 WOODLARK WAY 1 4/26/2023 1 375 08 029 19161 TILSON AVE 1 3/16/2023 1 375 32 040 10683 MINETTE PL 1 4/26/2023 1 326 30 005 20941 ALVES DR 1 5/10/2023 1 359 19 043 7540 MCCLELLAN RD 1 11/21/2023 1 326 08 042 10682 FLORA VISTA AVE 1 3/15/2023 1 316 35 003 19651 MERRITT DR 1 6/20/2023 1 359 19 005 10567 JOHN WA 1 3/22/2023 1 375 17 012 10320 WUNDERLICH DR 1 10/5/2023 1 326 02 021 22091 HIBISCUS CT 1 7/20/2023 1 359 06 014 902 SAGE CT 1 11/30/2023 1 369 09 046 19721 BIXBY DR 1 9/7/2023 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 8 PC 2-27-2024 128 of 163 Table A2 Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 11 12 Current APN Street Address Project Name+ Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low- Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Certificates of Occupancy or other forms of readiness (see instructions) Date Issued # of Units issued Certificates of Occupancy or other forms of readiness 0 13 0 13 0 13 51 90 326 28 031 10345 Ann Arbor Ave 1 7/3/2023 1 326 28 031 10345 Ann Arbor Ave 1 7/3/2023 1 357 16 162 10104 Byrne Ave 1 3/17/2023 1 357 16 162 10104 Byrne Ave 1 3/17/2023 1 359 11 019 20600 Rodrigues Ave 1 5/16/2023 1 359 11 019 20600 Rodrigues Ave 1 5/16/2023 1 326 47 049 10396 Noel 1 3/31/2023 1 369 23 051 10810 S Blaney Ave 1 7/7/2023 1 362 13 014 7929 Festival 1 6/1/2023 1 362 13 014 7929 Festival 1 6/1/2023 1 342 14 040 10228 Lockwood 1 11/8/2023 1 359 10 058 20713 Rodrigues Ave 1 7/5/2023 1 359 10 058 20713 Rodrigues Ave 1 7/2/2023 1 375 29 046 18782 Hanna 1 5/18/2023 1 375 29 046 18782 Hanna 1 5/18/2023 1 369 29 040 10397 Las Ondas Way 1 5/18/2023 1 366 18 043 1318 Flower 1 5/30/2023 1 366 18 043 1318 Flower 1 5/30/2023 1 375 24 005 10408 Sterling Blvd 1 10/16/2023 1 375 24 005 10408 Sterling Blvd 1 10/16/2023 1 357 04 029 10485 Scenic 1 8/7/2023 1 357 04 029 10485 Scenic 1 8/7/2023 1 375 11 004 10176 Judy Ave 1 6/15/2023 1 375 11 004 10176 Judy Ave 1 6/15/2023 1 375 35 035 5905 Sutton Park 1 2/3/2023 1 375 14 003 10285 Moretti Dr 1 6/12/2023 1 375 28 015 10621 Gascoigne Dr 1 12/5/2023 1 375 28 015 10621 Gascoigne Dr 1 12/5/2023 1 375 13 021 18811 Loree Ave 1 11/7/2023 1 375 13 021 18811 Loree Ave 1 11/7/2023 1 326 19 081 21852 Monte Ct 1 11/15/2023 1 Affordability by Household Incomes - Certificates of Occupancy 10 Project Identifier 12 9 PC 2-27-2024 129 of 163 326 30 103 10511 Glencoe Dr 1 11/1/2023 1 375 22 024 10618 Gascoigne Dr 1 7/11/2023 1 375 22 024 10618 Gascoigne Dr 1 7/11/2023 1 375 11 045 10054 Bret 1 10/30/2023 1 342 14 001 22782 Stevens Creek 1 7/31/2023 1 316 33 025 10355 Plum Tree Ln 1 3/15/2023 1 375 14 004 10295 Moretti Dr 1 7/22/2023 1 375 14 004 10295 Moretti Dr 1 7/22/2023 1 316 34 019 10573 Cedar Tree 1 1/26/2023 1 316 26 062 10234 Parlett 1 6/12/2023 1 375 10 007 10348 Judy Ave 1 11/29/2023 1 357 19 096 10380 Imperial Ave 1 12/21/2023 1 342 61 022 10547 Manzanita Ct 1 3/14/2023 1 375 25 007 18645 Ralya Ct 1 3/8/2023 1 375 25 007 18645 Ralya Ct 1 3/8/2023 1 362 24 054 1197 Candlelight Way 1 3/17/2023 1 342 58 012 22179 Hammond Way 1 6/27/2023 1 375 27 042 18750 Barnhart Ave 1 11/7/2023 1 375 27 042 18750 Barnhart Ave 1 11/7/2023 1 359 26 037 7480 De La Farge Dr 1 6/27/2023 1 359 26 037 7480 De La Farge Dr 1 6/27/2023 1 357 02 046 10419 Mira Vista 1 6/16/2023 1 326 41 019 21308 Rumford 1 10/25/2023 1 326 41 059 10468 Anson 1 11/9/2023 1 362 25 016 7675 Shadowhill Ln 1 7/12/2023 1 316 28 023 10185 Denison 1 10/19/2023 1 375 19 017 18745 Loree Ave 1 12/20/2023 1 375 19 017 18745 Loree Ave 1 12/20/2023 1 375 19 021 10160 Calvert 1 8/22/2023 1 342 29 011 10472 Lockwood Dr 1 12/14/2023 1 375 14 013 10385 Moretti Dr 1 9/8/2023 1 326 28 094 10395 N Stelling Rd 1 7/13/2023 1 375 19 008 18655 Loree Ave 1 4/10/2023 1 357 14 020 10455 Orange Ave 1 3/27/2023 1 375 11 026 10135 Bret Ave 1 12/14/2023 1 359 13 016 10459 Bonny Dr 1 12/13/2023 1 369 21 027 10826 Brookwell 1 11/26/2023 1 375 11 043 10080 Bret Ave 1 10/30/2023 1 375 17 047 10481 Johnson 1 10/17/2023 1 375 08 053 10395 Judy Ave 1 8/24/2023 1 375 33 028 18881 Pendergast Ave 1 7/13/2023 1 359 18 047 20565 Kirwin Ln 1 7/6/2023 1 369 27 032 858 Betlin Ave 1 5/23/2023 1 362 11 018 1202 Stafford Dr 1 5/3/2023 1 375 17 001 10430 Wunderlich Dr 1 2/24/2023 1 369 27 050 879 Bette Ave 1 2/23/2023 1 13 0 PC 2-27-2024 130 of 163 357 15 083 21841 Alcazar Ave 1 1/4/2023 1 362 18 008 7752 Orion Lane 0 362 18 008 7752 Orion Lane 0 362 18 008 7752 Orion Lane 0 362 18 008 7752 Orion Lane 0 366-10-061, -126 1655 S De Anza Blvd Coach House 0 366-10-061, -126 1655 S De Anza Blvd Coach House 0 326 27 043 21563 POINT REYES TER Westport 1 12/20/2023 1 326 27 043 21561 POINT REYES TER Westport 1 12/20/2023 1 326 27 043 21559 POINT REYES TER Westport 1 12/20/2023 1 326 27 043 21557 POINT REYES TER Westport 1 12/20/2023 1 326 27 043 21553 POINT REYES TER Westport 1 12/20/2023 1 326 27 043 21551 POINT REYES TER Westport 1 12/20/2023 1 326 27 043 21511 DANA POINT LN Westport 1 12/20/2023 1 326 27 043 21509 DANA POINT LN Westport 1 12/20/2023 1 326 27 043 21507 DANA POINT LN Westport 1 12/20/2023 1 326 27 043 21505 DANA POINT LN Westport 1 12/20/2023 1 326 27 043 21503 DANA POINT LN Westport 1 12/20/2023 1 326 27 043 21501 DANA POINT LN Westport 1 12/20/2023 1 362 06 036 11226 BUBB RD 0 375 35 054 19040 MEIGGS LN 0 359 32 036 7439 STANFORD PL 0 359 13 136 10476/10478 S STELLING RD 0 359 13 137 10400/10468 S STELLING RD 0 375 37 038 19040 BARNHART AVE 0 326 28 066 21076 GRENOLA DR 0 342 14 095 10116 PRADO VISTA DR 0 326 28 088 10481 N STELLING RD 0 375 07 042 10080 S TANTAU AVE 0 375 16 053 18831 BARNHART AVE 0 375 04 010 19375 CALLE DE BARCELONA 0 342 14 040 10222 LOCKWOOD DR 0 375 18 044 10409 JOHNSON AVE 0 375 11 011 10080 Judy Ave 0 326 31 005 20966 Alves Drive 0 13 1 PC 2-27-2024 131 of 163 366 17 057 7632 Normandy Way 0 375 35 055 19030 Meiggs Lane 0 375 29 034 18751 NEWSOM AVE 0 356 14 024 21900 RUCKER DR 0 375 28 011 10589 Gascoigne Dr 0 375 11 031 10205 Bret Ave 0 375 26 058 18630 CRABTREE AVE 0 375 37 020 10524 S. Tantau Ave 0 375 07 008 10081 S. Tantau 0 375 35 050 19080 Meiggs Ln 0 326 43 042 10692 PEBBLE 0 369 05 022 10153 DEEPROSE 0 369 21 027 10828 BROOKWELL 0 375 11 022 10083 BRET Ave 0 369 11 004 10395 LANSDALE 0 375 25 049 18689 CRABTREE 0 375 25 049 18689 CRABTREE 0 316 24 016 10201 RANDY 0 326 49 015 10633 STOKES 0 326 49 015 10633 STOKES 0 369 16 024 10569 MILLER AVE 0 316 30 055 10572 CYPRESS 0 342 14 094 10134 PRADO VISTA 0 375 07 042 10078 S TANTAU 0 342 29 054 10463 MERRIMAN 0 369 24 024 6611 JOHN DR 0 375 07 044 10052 S TANTAU AVE 0 375 14 034 10300 STERN AVE 0 316 24 016 10199 RANDY 0 362 27 036 1080 S STELLING RD 0 375 08 010 19161 MURIEL LN 0 375 23 007 10552 GASCOIGNE DR 0 375 32 049 10755 MINETTE DR 0 375 24 021 10270 STERLING BLVD 0 375 24 021 10270 STERLING BLVD 0 375 28 026 10624 JOHNSON AVE 0 375 33 051 18816 PENDERGAST AVE 0 375 25 005 18625 RALYA CT 0 375 40 042 19181 PHIL LN 0 375 29 052 18720 HANNA DR 0 13 2 PC 2-27-2024 132 of 163 375 23 034 10526 STERLING BLVD 0 375 33 063 18901 TUGGLE AVE 0 326 49 015 10631 STOKES AVE 0 375 19 023 10140 CALVERT DR 0 375 07 042 10080 S TANTAU AVE 0 362 04 047 7922 WOODLARK WAY 0 375 08 029 19161 TILSON AVE 0 375 32 040 10683 MINETTE PL 0 326 30 005 20941 ALVES DR 0 359 19 043 7540 MCCLELLAN RD 0 326 08 042 10682 FLORA VISTA AVE 0 316 35 003 19651 MERRITT DR 0 359 19 005 10567 JOHN WA 0 375 17 012 10320 WUNDERLICH DR 0 326 02 021 22091 HIBISCUS CT 0 359 06 014 902 SAGE CT 0 369 09 046 19721 BIXBY DR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 3 PC 2-27-2024 133 of 163 Table A2 Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units Streamlining Infill Housing without Financial Assistance or Deed Restrictions Term of Affordability or Deed Restriction 13 14 15 16 17 18 19 20 21 22 23 24 Current APN Street Address Project Name+ How many of the units were Extremely Low Income? Please select the streamlining provision the project was APPROVED pursuant to. (may select multiple) Infill Units? Y/N+ Assistance Programs for Each Development (may select multiple - see instructions) Deed Restriction Type (may select multiple - see instructions) For units affordable without financial assistance or deed restrictions, explain how the locality determined the units were affordable (see instructions) Term of Affordability or Deed Restriction (years) (if affordable in perpetuity enter 1000)+ Number of Demolished/Destroyed Units Demolished or Destroyed Units Demolished/De stroyed Units Owner or Renter Total Density Bonus Applied to the Project (Percentage Increase in Total Allowable Units or Total Maximum Allowable Residential Gross Floor Area) Number of Other Incentives, Concessions, Waivers, or Other Modifications Given to the Project (Excluding Parking Waivers or Parking Reductions) List the incentives, concessions, waivers, and modifications (Excluding Parking Waivers or Parking Modifications) Did the project receive a reduction or waiver of parking standards? (Y/N) 3 92 326 28 031 10345 Ann Arbor Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 326 28 031 10345 Ann Arbor Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 Demolished O 357 16 162 10104 Byrne Ave 0NONE Y 1 Demolished O 357 16 162 10104 Byrne Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 359 11 019 20600 Rodrigues Ave 0NONE Y 1 Demolished O 359 11 019 20600 Rodrigues Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 326 47 049 10396 Noel 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 369 23 051 10810 S Blaney Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 362 13 014 7929 Festival 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 362 13 014 7929 Festival 0NONE Y 1 Demolished O 342 14 040 10228 Lockwood 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 359 10 058 20713 Rodrigues Ave 0NONE Y 1 Demolished O 359 10 058 20713 Rodrigues Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 29 046 18782 Hanna 0NONE Y 1 Demolished O 375 29 046 18782 Hanna 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 Housing with Financial Assistance and/or Deed Restrictions Demolished/Destroyed Units Density BonusProject Identifier 13 4 PC 2-27-2024 134 of 163 369 29 040 10397 Las Ondas Way 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 366 18 043 1318 Flower 0NONE Y 1 Demolished O 366 18 043 1318 Flower 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 24 005 10408 Sterling Blvd 0NONE Y 1 Demolished O 375 24 005 10408 Sterling Blvd 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 357 04 029 10485 Scenic 0NONE Y 1 Demolished O 357 04 029 10485 Scenic 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 11 004 10176 Judy Ave 0NONE Y 1 Demolished O 375 11 004 10176 Judy Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 35 035 5905 Sutton Park 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 14 003 10285 Moretti Dr 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 28 015 10621 Gascoigne Dr 0NONE Y 1 Demolished O 375 28 015 10621 Gascoigne Dr 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 13 021 18811 Loree Ave 0NONE Y 1 Demolished O 375 13 021 18811 Loree Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 326 19 081 21852 Monte Ct 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 326 30 103 10511 Glencoe Dr 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 22 024 10618 Gascoigne Dr 0NONE Y 1 Demolished O 375 22 024 10618 Gascoigne Dr 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 11 045 10054 Bret 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 13 5 PC 2-27-2024 135 of 163 342 14 001 22782 Stevens Creek 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 316 33 025 10355 Plum Tree Ln 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 14 004 10295 Moretti Dr 0NONE Y 1 Demolished O 375 14 004 10295 Moretti Dr 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 316 34 019 10573 Cedar Tree 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 316 26 062 10234 Parlett 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 10 007 10348 Judy Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 357 19 096 10380 Imperial Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 342 61 022 10547 Manzanita Ct 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 25 007 18645 Ralya Ct 0NONE Y 1 Demolished O 375 25 007 18645 Ralya Ct 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 362 24 054 1197 Candlelight Way 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 342 58 012 22179 Hammond Way 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 27 042 18750 Barnhart Ave 0NONE Y 1 Demolished O 375 27 042 18750 Barnhart Ave 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 359 26 037 7480 De La Farge Dr 0NONE Y 1 Demolished O 359 26 037 7480 De La Farge Dr 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 357 02 046 10419 Mira Vista 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 13 6 PC 2-27-2024 136 of 163 326 41 019 21308 Rumford 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 326 41 059 10468 Anson 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 362 25 016 7675 Shadowhill Ln 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 ans 2024 30/30/30/10 0 316 28 023 10185 Denison 0NONE Y 0 375 19 017 18745 Loree Ave 0 NONE Y 1 Demolished O 375 19 017 18745 Loree Ave 0 NONE Y 0 375 19 021 10160 Calvert 0 NONE Y 0 342 29 011 10472 Lockwood Dr 0NONE Y 0 375 14 013 10385 Moretti Dr 0 NONE Y 1 Demolished O 326 28 094 10395 N Stelling Rd 0NONE Y 1 Demolished O 375 19 008 18655 Loree Ave 0 NONE Y 1 Demolished O 357 14 020 10455 Orange Ave 0 NONE Y 1 Demolished O 375 11 026 10135 Bret Ave 0 NONE Y 1 Demolished O 359 13 016 10459 Bonny Dr 0 NONE Y 1 Demolished O 369 21 027 10826 Brookwell 0 NONE Y 1 Demolished O 375 11 043 10080 Bret Ave 0 NONE Y 1 Demolished O 375 17 047 10481 Johnson 0NONE Y 1 Demolished O 375 08 053 10395 Judy Ave 0 NONE Y 1 Demolished O 375 33 028 18881 Pendergast Ave 0NONE Y 1 Demolished O 359 18 047 20565 Kirwin Ln 0 NONE Y 1 Demolished O 369 27 032 858 Betlin Ave 0 NONE Y 1 Demolished O 362 11 018 1202 Stafford Dr 0 NONE Y 1 Demolished O 375 17 001 10430 Wunderlich Dr 0NONE Y 1 Demolished O 369 27 050 879 Bette Ave 0 NONE Y 1 Demolished O 357 15 083 21841 Alcazar Ave 0NONE Y 1 Demolished O 362 18 008 7752 Orion Lane 0 NONE Y 1 Demolished O 362 18 008 7752 Orion Lane 0 NONE Y 0 362 18 008 7752 Orion Lane 0 NONE Y 0 362 18 008 7752 Orion Lane 0 NONE Y 0 366-10-061, -126 1655 S De Anza Blvd Coach House 0 NONE Y DB 99 years 0 36.0%2 Development Standards Modification Yes 366-10-061, -126 1655 S De Anza Blvd Coach House 3 NONE Y DB 99 years 0 36.0%2 Development Standards Modification Yes 326 27 043 21563 POINT REYES TER Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21561 POINT REYES TER Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21559 POINT REYES TER Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21557 POINT REYES TER Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21553 POINT REYES TER Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21551 POINT REYES TER Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21511 DANA POINT LN Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21509 DANA POINT LN Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21507 DANA POINT LN Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21505 DANA POINT LN Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 326 27 043 21503 DANA POINT LN Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 13 7 PC 2-27-2024 137 of 163 326 27 043 21501 DANA POINT LN Westport 0 NONE Y DB 99 years 0 9.2%3 Development Standards Modification Yes 362 06 036 11226 BUBB RD 0 NONE Y 1 Demolished O 375 35 054 19040 MEIGGS LN 0 NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 359 32 036 7439 STANFORD PL 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 359 13 136 10476/10478 S STELLING RD 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 359 13 137 10400/10468 S STELLING RD 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 375 37 038 19040 BARNHART AVE 0NONE Y 1 Demolished O 326 28 066 21076 GRENOLA DR 0NONE Y 1 Demolished O 342 14 095 10116 PRADO VISTA DR 0NONE Y 1 Demolished O 326 28 088 10481 N STELLING RD 0NONE Y 1 Demolished O 375 07 042 10080 S TANTAU AVE 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 375 16 053 18831 BARNHART AVE 0NONE Y 1 Demolished O 375 04 010 19375 CALLE DE BARCELONA 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 342 14 040 10222 LOCKWOOD DR 0NONE Y 1 Demolished O 375 18 044 10409 JOHNSON AVE 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 375 11 011 10080 Judy Ave 0 NONE Y 1 Demolished O 326 31 005 20966 Alves Drive 0 NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 366 17 057 7632 Normandy Way 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 375 35 055 19030 Meiggs Lane 0 NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 375 29 034 18751 NEWSOM AVE 0NONE Y 1 Demolished O 356 14 024 21900 RUCKER DR 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 0 375 28 011 10589 Gascoigne Dr 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 1 Demolished O 13 8 PC 2-27-2024 138 of 163 375 11 031 10205 Bret Ave 0 NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 375 26 058 18630 CRABTREE AVE 0NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 375 37 020 10524 S. Tantau Ave 0NONE Y 1 Demolished O 375 07 008 10081 S. Tantau 0 NONE Y ADU affordability assumptions from ABAG’s ADU affordability methodology for the Annual Progress Reports covering calendar year 2023 and 2024 30/30/30/10 1 Demolished O 375 35 050 19080 Meiggs Ln 0 NONE Y 1 Demolished O 326 43 042 10692 PEBBLE 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 369 05 022 10153 DEEPROSE 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 369 21 027 10828 BROOKWELL 0NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 375 11 022 10083 BRET Ave 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 369 11 004 10395 LANSDALE 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 375 25 049 18689 CRABTREE 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 375 25 049 18689 CRABTREE 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 316 24 016 10201 RANDY 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 326 49 015 10633 STOKES 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 326 49 015 10633 STOKES 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 369 16 024 10569 MILLER AVE 0NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 316 30 055 10572 CYPRESS 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 342 14 094 10134 PRADO VISTA 0NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 375 07 042 10078 S TANTAU 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 342 29 054 10463 MERRIMAN 0 NONE Y New ADU Building permit Issued 2023 ABAG 30/30/30/10 369 24 024 6611 JOHN DR 0 NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 07 044 10052 S TANTAU AVE 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 14 034 10300 STERN AVE 0 NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 316 24 016 10199 RANDY 0 NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 362 27 036 1080 S STELLING RD 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 08 010 19161 MURIEL LN 0 NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 23 007 10552 GASCOIGNE DR 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 32 049 10755 MINETTE DR 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 13 9 PC 2-27-2024 139 of 163 375 24 021 10270 STERLING BLVD 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 24 021 10270 STERLING BLVD 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 28 026 10624 JOHNSON AVE 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 33 051 18816 PENDERGAST AVE 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 25 005 18625 RALYA CT 0 NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 40 042 19181 PHIL LN 0 NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 29 052 18720 HANNA DR 0 NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 23 034 10526 STERLING BLVD 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 33 063 18901 TUGGLE AVE 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 326 49 015 10631 STOKES AVE 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 19 023 10140 CALVERT DR 0NONE Y New SFD & ADU Bldg. permit Issued 2023 ABAG 30/30/30/10 1 Demolished O 375 07 042 10080 S TANTAU AVE 0NONE Y 1 Demolished O 362 04 047 7922 WOODLARK WAY 0NONE Y 1 Demolished O 375 08 029 19161 TILSON AVE 0NONE Y 1 Demolished O 375 32 040 10683 MINETTE PL 0NONE Y 1 Demolished O 326 30 005 20941 ALVES DR 0 NONE Y 1 Demolished O 359 19 043 7540 MCCLELLAN RD 0NONE Y 1 Demolished O 326 08 042 10682 FLORA VISTA AVE 0NONE Y 1 Demolished O 316 35 003 19651 MERRITT DR 0NONE Y 1 Demolished O 359 19 005 10567 JOHN WA 0 NONE Y 1 Demolished O 375 17 012 10320 WUNDERLICH DR 0NONE Y 1 Demolished O 326 02 021 22091 HIBISCUS CT 0NONE Y 1 Demolished O 359 06 014 902 SAGE CT 0 NONE Y 1 Demolished O 369 09 046 19721 BIXBY DR 0 NONE Y 1 Demolished O 14 0 PC 2-27-2024 140 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2023 (Jan. 1 - Dec. 31)Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031 1 Projection Period 34 RHNA Allocation by Income Level Projection Period - 06/30/2022- 01/30/2023 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Units to Date (all years) Total Remaining RHNA by Income Level Deed Restricted - - - - - - - - - - Non-Deed Restricted - 10 - - - - - - - - Deed Restricted - - - - - - - - - - Non-Deed Restricted 2 8 - - - - - - - - Deed Restricted 1 - - - - - - - - - Non-Deed Restricted 19 9 - - - - - - - - Above Moderate 1,953 92 36 - - - - - - - - 128 1,825 4,588 114 63 - - - - - - - - 177 4,411 5 67 Extremely low-Income Need 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Units to Date Total Units Remaining 597 - - - - - - - - - - 597 677 Total RHNA Total Units Income Level Very Low Low Extremely Low-Income Units* Progress toward extremely low-income housing need, as determined pursuant to Government Code 65583(a)(1). 726 10 This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs. 29 Moderate 1,193 687 755 Please contact HCD if your data is different than the material supplied here 10 2 Table B Regional Housing Needs Allocation Progress Permitted Units Issued by Affordability 1,183 14 1 PC 2-27-2024 141 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2023 (Jan. 1 - Dec. 31)Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031 Date of Rezone Rezone Type 2 4567 9 10 11 APN Street Address Project Name+ Local Jurisdiction Tracking ID+ Date of Rezone Very Low- Income Low-Income Moderate-Income Above Moderate- Income Rezone Type Parcel Size (Acres) General Plan Designation Zoning Minimum Density Allowed Maximum Density Allowed Realistic Capacity Vacant/Nonvacant Description of Existing Uses Note: "+" indicates an optional field Cells in grey contain auto-calculation formulas Summary Row: Start Data Entry Below 83 Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C 14 2 PC 2-27-2024 142 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation Land Use Policy and Zoning Provisions Accommodate the Regional Housing Needs Allocation (RHNA). Ongoing: 2014-2022 The City continued to provide adequate capacity through the Land Use Element and Zoning Ordinance to accommodate the RHNA allocation, monitor development standards, monitor sites inventory, and monitor development activity on Housing Opportunity Sites. City is currently working on the 6th Cycle of the Housing Element. Second Dwelling Units Continue to implement the Accessory Dwelling Unit (ADU) Ordinance (or Second Dwelling Unit Ordinance) and encourage the production of second units. Ongoing: 2014-2022 The City annually updated the Ordinance to comply with State law and established a program to streamline the ADU review and production process as part of the City 2020-21 work program. In 2021, the City created a pre- approved ADU program to further incentivize the creation of ADUs. In 2023, the City issued 50 building permits for ADUs. Lot Consolidation Facilitate residential and mixed used developments.Ongoing: 2014-2022 In 2023, the City continued to encourage lot consolidation when contiguous smaller, underutilized parcels are to be redeveloped, and provided technical assistance to property owners of adjacent parcels to coordinate redevelopment where appropriate. Encourage master plans for such sites with coordinated access and circulation. Provide technical assistance to property owners of adjacent parcels to facilitate coordinated redevelopment where appropriate. Encourage intra- and inter-agency cooperation in working with applicants. ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 14 3 PC 2-27-2024 143 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Flexible Development Standards Encourage a range of housing options in the community.Ongoing: 2014-2022 The City continued to offer flexible residential development standards in planned residential zoning districts and consider granting reductions in off- street parking for senior housing. The Westport Project (2020) and Marina Plaza project (2022) were approved with waivers, an incentive to development standards, and a reduction in parking standards. Both projects are located within the Heart of the City Specific Plan and on a Housing Element site. In 2022, Canyon Crossing, with 18 townhome and apartments, and Alan Row with 9 townhomes and a JADU, were both approved using density bonus. In 2023, the City approved one project (Coachhouse) and reviewed another (Bianchi Lane) both of which utilized state density bonus law, specifically the waivers section of the law. Heart of the City Specific Plan Reduce constraints to housing development and ensure that the designated sites can obtain the realistic capacity shown in the Housing Element. Ongoing: 2014-2022 The Heart of the City Specific Plan was completed in May 2015. Office and Industrial Housing Mitigation Program Continue to implement the Office and Industrial Housing Mitigation Program which requires that developers of office, commercial, and industrial space pay a mitigation fee which will then be used to support affordable housing in the City. Ongoing: 2014-2022 To help offset the loss of land, the City continued to implement the Office and Industrial Housing Mitigation Program. The City requires developers of office, commercial, and industrial space to pay a mitigation fee to support affordable housing. Mitigated fees are collected and deposited into the City's BMR Affordable Housing Fund (AHF) for the following fiscal years (FY) the following mitigation fees were collected and deposited and in the BMR AFH fund. In 2023, there was $175,873.48 in BMR AHF funds collected. 14 4 PC 2-27-2024 144 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Residential Housing Mitigation Program Continue to implement the Residential Housing Mitigation Program to mitigate the need for affordable housing created by new market-rate residential development. Ongoing: 2014-2022 The City continued to implement the Residential Housing Mitigation Program. The program applies to new residential development and includes the provision of BMR units or the payment of the "Housing Mitigation" fee. The BMR Linkage Fees Update study was completed and adopted by City Council on May 19, 2020, which included an increased requirement of 15%-20% for inclusionary ownership projects. In 2023, the BMR AHF provided funding to the following affordable housing projects, strategies, and services: •BMR Program Administration - 4 BMR ownership resales and 13 BMR rental turnovers •Fair housing services - $50,000 to Project Sentinel •$126,397.42 to the Homeless Jobs Program Below Market Rate (BMR) Affordable Housing Fund (AHF) Continue to support affordable housing projects, strategies, and services, including but not limited to: BMR program administration, substantial rehabilitation, land acquisition, acquisition of buildings for permanent affordability, new construction, preserving "at-risk" BMR units, rental operating subsidies, down payment assistance, land write-downs, direct gap financing, and fair housing. Ongoing: 2014-2022 The City continued to maintain the BMR AHF, and provided ongoing technical assistance to nonprofits/developers, including providing data and information on properties for sale to nonprofit partners and developers for their consideration. The City's FY 23-24 BMR AHF Request for Proposal (RFP) was open November 2022-February 2023. In 2023, the BMR AHF provided funding to the following affordable housing projects, strategies, and services: •BMR Program Administration - 4 BMR ownership resales and 13 BMR rental turnovers •Fair housing services - $50,000 to Project Sentinel •$126,397.42 to the Homeless Jobs Program 14 5 PC 2-27-2024 145 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Housing Resources Provide information on housing resources and services offered by the County and other outside agencies to Cupertino residents and developers interested in providing affordable housing. Ongoing: 2014-2022 In 2023, the City provided information on housing resources and services to: •County Measure A Affordable Housing Bond •County Mortgage Credit Certificate •Housing Trust Silicon Valley First-Time Homebuyer Assistance and Developer Loans •Project Sentinel Fair Housing Services •Housing Authority Section 8 Vouchers •West Valley Community Services In addition, the City worked with nonprofit organizations in providing programs and services for low-income households and private industry, in particular financial and development groups, to encourage the development of affordable housing opportunities regionally and in the city (see Program HE-2.3.3). The City provided technical assistance to the public service agencies it funded. The City coordinated with a number of groups to engage in discussions about grant funding opportunities, regional housing needs, and efforts to address homelessness. The City participated in the following groups: Santa Clara County PLHA Consortium, Regional CDBG/Housing Coordinators Group, and West Valley Collaboration group. The participants in these groups, including the City, work together to pool their knowledge and share expertise. The County’s Office of Supportive Housing helps to coordinate these efforts and provides the participants with invaluable technical assistance. Through the SCC PLHA Consortium, the City was awarded an allocation of PLHA funding and is currently working towards implementing the funding for projects in Cupertino The City continued to support the WVCS Homeless Jobs Program14 6 PC 2-27-2024 146 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Surplus Properties for Housing Explore opportunities on surplus properties.Ongoing: 2014-2022 The City worked with local public agencies, school districts, and churches to identify surplus properties that have the potential for residential development. There were no surplus properties available from any school districts or churches for the City to pursue. The City continued to support the Rotating Safe Car Park (RSCP) program on church property. 14 7 PC 2-27-2024 147 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Incentives for Affordable Housing Development Continue to offer a range of incentives to facilitate the development of affordable housing. Ongoing: 2014-2022 In 2023, the City offered a range of financial assistance through the City’s BMR AHF, by partnering with CDBG. $88,966 in CDBG funds was provided to Rebuilding Together Silicon Valley, a low-income housing repair and rehabilitation program. To incentivize affordable housing development, the City supported the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, density bonus incentives, flexible development standards, technical assistance, waiver of park dedication fees and construction tax, parking ordinance waivers, and expedited permit processing. The City coordinated with a number of groups to engage in discussions about grant funding opportunities, regional housing needs, and efforts to address homelessness. The City participated in the following groups: Santa Clara County PLHA Consortium, Regional CDBG/Housing Coordinators Group, and West Valley Collaboration group. The participants in these groups, including the City, work together to pool their knowledge and share expertise. The County’s Office of Supportive Housing helps to coordinate these efforts and provides the participants with invaluable technical assistance. Through the SCC PLHA Consortium, the City was awarded an allocation of PLHA funding and is currently working towards implementing the funding for projects in Cupertino. 14 8 PC 2-27-2024 148 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Density Bonus Ordinance Encourage the use of density bonuses and incentives for housing developments. Ongoing: 2014-2022 All the sites listed in the 5th cycle table with the exception of (APNs: 316-06- 059, 316-06-060, and 316-06 -058) have been awarded density bonuses, incentives, waivers, and/or reduction in parking standards. They were approved by the City between 2016 and 2022. Extremely Low-Income Housing and Housing for Persons with Special Needs Continue to encourage the development of adequate housing to meet the needs of extremely low- income households and person with special needs. Ongoing: 2014-2022 The City continued to provide financing assistance using the BMR AHF and CDBG funds. The City coordinated with a number of groups to engage in discussions about grant funding opportunities, regional housing needs, and efforts to address homelessness. The City participated in the following groups: Santa Clara County PLHA Consortium, Regional CDBG/Housing Coordinators Group. The participants in these groups, including the City, work together to pool their knowledge and share expertise. The County’s Office of Supportive Housing helps to coordinate these efforts and provides the participants with invaluable technical assistance. Through the SCC PLHA Consortium, the City was awarded an allocation of PLHA funding and is currently working towards implementing the funding for projects in Cupertino. In addition, the City provides technical assistance to the public service agencies it funds. The City also participates in the Santa Clara County HOME Consortium. The City worked with nonprofits and developers to review the feasibility of residential uses on two potential affordable housing sites (Mary Avenue). The City issued an RFP (request for proposals) for the site and received interest from one developer. 14 9 PC 2-27-2024 149 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Employee Housing Permit employee housing in multiple zoning districts.Ongoing: 2014-2022 The City amended the zoning code in 2014 to allow employee housing in multiple zoning districts. In 2023, the City continued to implement the City's zoning code to allow employee housing in multiple zoning districts. The Zoning Ordinance is regularly updated to comply with state law. Residential Rehabilitation Continue to utilize BMR AHF and CDBG funds to support residential rehabilitation efforts in the community. Ongoing: 2014-2022 The City utilized CDBG funds to rehabilitate owner-occupied housing. In 2023, the following CDBG funds were provided to the following rehabilitation efforts: • $88,966 in CDBG funds were provided to Rebuilding Together Silicon Valley for a low-income housing repair and rehabilitation program that assisted 4 low- income Cupertino households. Preservation of At-Risk Housing Units Proactively contact the property owner of Beardon Drive, a housing project considered at risk of converting to market-rate housing, regarding its intent to remain or opt out of the affordable program. Ongoing: 2014-2022 In the event the project becomes at risk of converting to market-rate housing, the City will work with the property owner or other interested nonprofit housing providers to preserve the eight units. In 2019, as part of the BMR AHF program, the owner of Beardon Drive paid off the City's CDBG loan and indicated that the 8 units making up the property would continue to operate as affordable housing. Condominium Conversion Regulate the conversion of rental units in multi-family housing development in order to preserve the rental housing stock. Ongoing: 2014-2022 The City continued to monitor the effectiveness of this ordinance by providing opportunities for homeownership while preserving a balanced housing stock with rental housing. 15 0 PC 2-27-2024 150 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Housing Preservation Program Grant approval of proposed developments or redevelopments on if the project will comply with the City's BMR program, the number of units provided on site is at least equal to the number of existing units, and adverse impacts on displaced tenants (four or more units) are mitigated. Ongoing: 2014-2022 The City continued to participate in studies of regional housing need and displacement, and consider policies or programs to address the indirect displacement of low-income residents as appropriate. Neighborhood and Community Clean-Up Campaigns Continue to encourage and sponsor neighborhood and community clean-up campaigns for both public and private properties. Ongoing: 2014-2022 The City continued to encourage and sponsor neighborhood and community clean-up campaigns for both public and private properties. The City promotes and staffs the following events available to the community: •Recology provides quarterly drop-off events for bulky items, construction waste, landscape waste, and hazardous waste (due to COVID, the quarterly events were cancelled and resumed in mid-2021). •The City staffs two annual creek clean ups- National River Clean Up Day and Coastal Clean Up Day. Enforcement of Title 24 Continue to enforce Title 24 requirements for energy conservation and evaluate utilizing some of the other suggestions as identified in the Environmental Resources/Sustainability element. Ongoing: 2014-2022 The City continued to enforce Title 24 requirements for energy conservation and evaluate using some of the other suggestions as identified in the Environmental Resources/Sustainability element. In 2020, the City adopted REACH codes, which were further amended in 2022, that will assist in achieving the City's sustainability goals. The City has Chapter 16.58, Green Building Standards Code, that requires certain projects to achieve LEED certification or similar. 15 1 PC 2-27-2024 151 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Sustainable Practices Continue to implement the Landscape Ordinance for water conservation and the Green Building Ordinance that applies primarily to new residential and nonresidential development, additions, renovations, and tenant improvements of ten or more units. Ongoing: 2014-2022 The City continued to the implement the Landscape Ordinance, Green Building Ordinance, and the City's Climate Action Plan, including evaluating the potential to provide incentives for energy conservation improvements at affordable housing projects (e.g. waiving or reducing fees,) and continue to implement the policies in the climate action plan. Continue to implement the Energy efficiency reach codes that include requirements for electrification for certain types of buildings, water efficiency, and green materials to reduce energy use and lower greenhouse gas emissions. These codes include reach codes which are a component of the California Energy and California Green Building Codes and include requirements for water efficiency, green materials, and other items designed to encourage building electrification for certain types of buildings. 15 2 PC 2-27-2024 152 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Emergency Shelters Continue to facilitate housing opportunities for special needs persons by allowing emergency shelters as a permitted use in the "BQ" Quasi-Public zoning district. Ongoing: 2014-2022 The City continued to facilitate housing opportunities for special-needs groups by allowing emergency shelters as a permitted use in the "BQ" Quasi-Public Building zoning district. In 2021, the City established the City Unhoused Task Force to address the needs of unhoused residents through resource referral and partnered with the West Valley Rotating Safe Car Park (RSCP) program. The RSCP program is an emergency homeless program made up of a network of local city governments, service organizations, and volunteer faith-based host sites that provide temporary overnight parking for homeless individuals/families living out of their cars. The RSCP program is still active, and there is a maximum of 30 people at a time per safe parking site. The same year, the City created a pilot Homeless Jobs Program with two Cupertino unhoused residents participating in the program. The RSCP, Unhoused Task Force, and Homeless Jobs Program continued in 2023. The City Work Program is renewed on an annual basis by the City Council, and contains a variety of different projects, one of which being the City Plan To End Homelessness. The City Council did not prioritize the Plan To End Homelessness for the FY 2023-25 City Work Program. This item was concluded, and no final version of the Plan was created. Unused funds will be returned to the General Fund. 15 3 PC 2-27-2024 153 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Supportive Services for Lower-Income Households and Persons with Special Needs Continue to utilize the BMR AHF, CDBG, and General Fund Human Services Grants (HSG) funds to provide for a range of supportive services for lower-income households and persons with special needs. Ongoing: 2014-2022 In 2023, the City took various steps to provide supportive services for lower- income households and persons with special needs, including: •Continuing the City Unhoused Task Force to address the needs of unhoused residents. •CDBG $21,405.76 to Live Oak Adult Day Services, a senior adult day care. •CDBG $38,054.69 to West Valley Community Services (WVCS) CARE Program, a community access to resource and education program. •HSG $10,000 to Catholic Charities of Santa Clara County, a long-term care ombudsman program. •HSG $25,000 to Maitri, a transitional housing direct client services program. •HSG $15,000 to Senior Adult Legal Assistance, a legal assistance to elders program. •HSG $65,780 to WVCS Haven to Home program, a supportive services and housing resources program for the homeless. •The City continued to oversee the WVCS Homeless Jobs Program which provides up to eight months of employment and job training for two unhoused residents in Cupertino. Rotating Homeless Shelter Continue to support the operation of a rotating homeless shelter.Ongoing: 2014-2022 In 2023, the City continued partnering with the Rotating Safe Car Park (RSCP) program. The RSCP program is an emergency homeless program made up of a network of local city governments, service organizations, and volunteer faith- based host sites that provide temporary overnight parking for homeless individuals/families living out of their cars. In addition, through $65,780 in CDBG funding to the WVCS Haven To Home Program, the City assisted 79 households by providing services to prevent homelessness. 15 4 PC 2-27-2024 154 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) 123 4 Name of Program Objective Timeframe in H.E Status of Program Implementation ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Housing Programs Progress Report Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element. Table D Program Implementation Status pursuant to GC Section 65583 Fair Housing Services Continue to provide fair housing services, retain a fair housing service provider, coordinate efforts with the County Fair Housing Consortium, and distribute fair housing materials at public counters/events. Ongoing: 2014-2022 The City continued to provide fair housing services including outreach, education, counseling, and investigation of fair housing complaints. In 2023, BMR AHF funds were provided to the following fair housing services: •$50,000 to Project Sentinel, a landlord/tenant rental mediation program and fair housing program. Coordination with Outside Agencies and Organizations Partner with outside agencies and organizations in addressing local and regional housing needs. Ongoing: 2014-2022 The City coordinated with these groups to engage in discussions about grant funding opportunities, regional housing needs, and efforts to address homelessness. The City participated in the following groups: Santa Clara County PLHA Consortium, Regional CDBG/Housing Coordinators Group, and the US Department of Housing and Urban Development, among others. The participants in these groups, including the City, work together to pool their knowledge and share expertise. The County’s Office of Supportive Housing helps to coordinate these efforts and provides the participants with invaluable technical assistance. Through the SCC PLHA Consortium, the City was awarded an allocation of PLHA funding and is currently working towards implementing the funding for projects in Cupertino. The City Council did not prioritize the Plan To End Homelessness for the Fiscal Year 2023-25 City Work Program. This item was concluded, and no final version of the Plan was created. The unused funds will be returned to the General Fund. 15 5 PC 2-27-2024 155 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2023 (Jan. 1 - Dec. 31)Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031 Description of Commercial Development Bonus Commercial Development Bonus Date Approved 34 APN Street Address Project Name+Local Jurisdiction Tracking ID+ Very Low Income Low Income Moderate Income Above Moderate Income Description of Commercial Development Bonus Commercial Development Bonus Date Approved Summary Row: Start Data Entry Below Units Constructed as Part of Agreement Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E Note: "+" indicates an optional field Project Identifier 1 2 Cells in grey contain auto-calculation formulas (CCR Title 25 §6202) Annual Progress Report January 202015 6 PC 2-27-2024 156 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2023 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031 The description should adequately document how each unit complies with subsection (c) of Government Code Section 65583.1+. For detailed reporting requirements, see the chcklist here: Extremely Low- Income+Very Low-Income+Low-Income+TOTAL UNITS+ Extremely Low- Income+ Very Low- Income+Low-Income+TOTAL UNITS+ https://www.hcd.ca.gov/community- development/docs/adequate-sites-checklist.pdf Rehabilitation Activity Preservation of Units At-Risk Acquisition of Units Mobilehome Park Preservation Total Units by Income Table F Please note this table is optional: The jurisdiction can use this table to report units that have been substantially rehabilitated, converted from non-affordable to affordable by acquisition, and preserved, including mobilehome park preservation, consistent with the standards set forth in Government Code section 65583.1, subdivision (c). Please note, motel, hotel, hostel rooms or other structures that are converted from non-residential to residential units pursuant to Government Code section 65583.1(c)(1)(D) are considered net-new housing units and must be reported in Table A2 and not reported in Table F. Activity Type Units that Do Not Count Towards RHNA+ Listed for Informational Purposes Only Units that Count Towards RHNA + Note - Because the statutory requirements severely limit what can be counted, please contact HCD at apr@hcd.ca.gov and we will unlock the form which enable you to populate these fields. Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c) Annual Progress Report January 202015 7 PC 2-27-2024 157 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2023 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031 Notes 23 6 Prior APN+Current APN Street Address Project Name+ Local Jurisdiction Tracking ID Unit Category (2 to 4,5+) Tenure R=Renter Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low- Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Total Moderate Income Units Converted from Above Moderate Date Converted Notes Summary Row: Start Data Entry Below 00 0 0 0 00 0 Table F2 Above Moderate Income Units Converted to Moderate Income Pursuant to Government Code section 65400.2 For up to 25 percent of a jurisdiction’s moderate-income regional housing need allocation, the planning agency may include the number of units in an existing multifamily building that were converted to deed-restricted rental housing for moderate-income households by the imposition of affordability covenants and restrictions for the unit. Before adding information to this table, please ensure housing developments meet the requirements described in Government Code 65400.2(b). 5 Project Identifier Unit Types 1 4 Affordability by Household Incomes After Conversion Units credited toward Moderate Income RHNA 15 8 PC 2-27-2024 158 of 163 Jurisdiction Cupertino Reporting Period 2023 (Jan. 1 - Dec. 31) Planning Period 6th Cycle 01/31/2023 - 01/31/2031 ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation 23 4 APN Street Address Project Name+Local Jurisdiction Tracking ID+ Realistic Capacity Identified in the Housing Element Entity to whom the site transferred Intended Use for Site 1 Summary Row: Start Data Entry Below Note: "+" indicates an optional field Cells in grey contain auto-calculation formulas Table G Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of Project Identifier NOTE: This table must only be filled out if the housing element sites inventory contains a site which is or was owned by the reporting jurisdiction, and has been sold, leased, or otherwise disposed of during the reporting year. 15 9 PC 2-27-2024 159 of 163 Jurisdiction Cupertino Note: "+" indicates an optional field Reporting Period 2023 (Jan. 1 - Dec. 31) Cells in grey contain auto-calculation formulas Designation Size Notes 1234567 APN Street Address/Intersection Existing Use Number of Units Surplus Designation Parcel Size (in acres)Notes 357-11-030 10301 Byrne Avenue Residential 1 Surplus Land 0.3 Property surplused 7/7/2023. City Manager due diligence in process NOTE: This table must contain an invenory of ALL surplus/excess lands the reporting jurisdiction owns Summary Row: Start Data Entry Below Parcel Identifier ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Table H Locally Owned Surplus Sites For Santa Clara County jurisdictions, please format the APN's as follows:999-99-999 16 0 PC 2-27-2024 160 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2023 (Jan. 1 - Dec. 31)Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031 Project Type Date Units (Beds/Student Capacity) Granted Density Bonus Notes 23 5 6 APN Street Address Project Name+Local Jurisdiction Tracking ID+ Unit Category (SH - Student Housing)Date Very Low- Income Deed Restricted Very Low- Income Non Deed Restricted Low- Income Deed Restricted Low- Income Non Deed Restricted Moderate- Income Deed Restricted Moderate- Income Non Deed Restricted Above Moderate- Income Total Additional Beds Created Due to Density Bonus Notes Summary Row: Start Data Entry Below Note: "+" indicates an optional field Cells in grey contain auto-calculation formulas Table J Student housing development for lower income students for which was granted a density bonus pursuant to subparagraph (F) of paragraph (1) of subdivision (b) of Section 65915 Project Identifier Units (Beds/Student Capacity) Approved 1 4 NOTE: STUDENT HOUSING WITH DENSITY BONUS ONLY. This table only needs to be completed if there were student housing projects WITH a density bonus approved pursuant to Government Code65915(b)(1)(F) Annual Progress Report January 202016 1 PC 2-27-2024 161 of 163 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2023 (Jan. 1 - Dec. 31) Planning Period 6th Cycle 01/31/2023 - 01/31/2031 YesDoes the Jurisdiction have a local tenant preference policy? If the jurisdiction has a local tenant preference policy, provide a link to the jurisdiction's webpage on their internet website containing authorizing local ordinance and supporting materials. Notes Table K Tenent Preference Policy Local governments are required to inform HCD about any local tenant preference ordinance the local government maintains when the jurisdiction submits their annual progress report on housing approvals and production, per Government Code 7061 (SB 649, 2022, Cortese). Effective January 1, 2023, local governments adopting a tenant preference are required to create a webpage on their internet website containing authorizing local ordinance and supporting materials, no more than 90 days after the ordinance becomes operational. https://www.cupertino.org/home/showpublisheddocument/19535/636578260399770000 16 2 PC 2-27-2024 162 of 163 Jurisdiction Cupertino Reporting Year 2023 (Jan. 1 - Dec. 31) Total Award Amount Total award amount is auto-populated based on amounts entered in rows 15-26. Task $ Amount Awarded $ Cumulative Reimbursement Requested Other Funding Notes Housing Element Update $300,000.00 $0.00 REAP Summary of entitlements, building permits, and certificates of occupancy (auto-populated from Table A2) Current Year Deed Restricted 3 Non-Deed Restricted 5 Deed Restricted 0 Non-Deed Restricted 5 Deed Restricted 1 Non-Deed Restricted 5 59 78 Current Year Deed Restricted 0 Non-Deed Restricted 10 Deed Restricted 0 Non-Deed Restricted 10 Deed Restricted 0 Non-Deed Restricted 10 38 68 Current Year Deed Restricted 0 Non-Deed Restricted 13 Deed Restricted 0 Non-Deed Restricted 13 Deed Restricted 0 Non-Deed Restricted 13 51 90 Moderate Above Moderate Total Units Completed Entitlement Issued by Affordability Summary Income Level Very Low Low Moderate Above Moderate Total Units Building Permits Issued by Affordability Summary Income Level Very Low Low Total Units Certificate of Occupancy Issued by Affordability Summary Income Level Very Low Low Moderate Above Moderate ANNUAL ELEMENT PROGRESS REPORT Local Early Action Planning (LEAP) Reporting (CCR Title 25 §6202) Please update the status of the proposed uses listed in the entity’s application for funding and the corresponding impact on housing within the region or jurisdiction, as applicable, categorized based on the eligible uses specified in Section 50515.02 or 50515.03, as applicable. 300,000.00$ Task Status In Progress 163 PC 2-27-2024 163 of 163