Loading...
BLD-2022-0450_Inspection RecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21110 WHITE FIR CT Cupertino APN: 359 05 083 PERMIT NO: BLD-2022-0450 OWNER'S NAME: LIU SHUPING AND TONG WENNI OWNER'S PHONE: 213-281-1257 CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE: DATE ISSUED 10/19/2023 12:19:10 PM ISSUED BY:VALUATION: $7500 JOB DESCRIPTION CONVERT WATER HEATER ROOM TO BATHROOM (36 SF); RELOCATE (E) WATER HEATER (WASHROOM); (N) CLOSET PRIMARY ROOM (22 SF); REPLACE/RELOCATE FURNACE/AC TO ATTIC AND RELOCATE OUTDOOR CONDENSER. REVISION #1 - REVISE BATH LAYOUT; RELOCATE WATER HEATER; CHANGE BRAND OF HVAC EQUIPMENT APPROVED 06/06/2023 REVISION #2 - REPLACE LIGHT FIXTURES TO LED LIGHTS (14) - APPROVED 10/9/2023 INSPECTION TYPE DATE STATUS INSPECTOR ROUGH PLUMBING 2023-07-10 Passed Bob Sabich ROUGH ELECTRICAL 2023-07-10 Conditional Bob Sabich ROUGH MECHANICAL 2023-07-10 Conditional Bob Sabich ROUGH MECHANICAL 2023-07-31 Rescheduled   ROUGH ELECTRICAL 2023-07-31 Rescheduled   ROUGH ELECTRICAL 2023-08-02 Passed Bob Sabich ROUGH MECHANICAL 2023-08-02 Passed Bob Sabich ROUGH FRAME 2023-08-08 Passed Bob Sabich INSULATION 2023-08-08 Passed Bob Sabich SHEETROCK 2023-08-08 Passed Bob Sabich FINAL BUILDING 2023-09-28 Failed Rodney Weathers FINAL ELECTRICAL 2023-09-28 Failed Rodney Weathers FINAL MECHANICAL 2023-09-28 Failed Rodney Weathers FINAL PLUMBING 2023-09-28 Failed Rodney Weathers FINAL BUILDING 2023-10-04 Failed Rodney Weathers FINAL ELECTRICAL 2023-10-04 Failed Rodney Weathers FINAL MECHANICAL 2023-10-04 Passed Rodney Weathers FINAL PLUMBING 2023-10-04 Passed Rodney Weathers FINAL ELECTRICAL 2023-10-16 Failed Rodney Weathers FINAL BUILDING 2023-10-16 Failed Rodney Weathers FINAL BUILDING 2023-10-24 Cancelled   FINAL ELECTRICAL 2023-10-19 Passed Rodney Weathers FINAL BUILDING 2023-10-19 Passed Rodney Weathers EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.