BLD-2022-0450_Inspection RecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 21110 WHITE FIR CT Cupertino APN: 359 05 083 PERMIT NO: BLD-2022-0450
OWNER'S NAME: LIU SHUPING AND TONG WENNI OWNER'S PHONE: 213-281-1257
CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE:
DATE ISSUED 10/19/2023 12:19:10 PM ISSUED BY:VALUATION: $7500
JOB DESCRIPTION
CONVERT WATER HEATER ROOM TO BATHROOM (36 SF); RELOCATE (E) WATER HEATER (WASHROOM); (N) CLOSET PRIMARY ROOM (22 SF); REPLACE/RELOCATE FURNACE/AC TO
ATTIC AND RELOCATE OUTDOOR CONDENSER. REVISION #1 - REVISE BATH LAYOUT; RELOCATE WATER HEATER; CHANGE BRAND OF HVAC EQUIPMENT APPROVED 06/06/2023
REVISION #2 - REPLACE LIGHT FIXTURES TO LED LIGHTS (14) - APPROVED 10/9/2023
INSPECTION TYPE DATE STATUS INSPECTOR
ROUGH PLUMBING 2023-07-10 Passed Bob Sabich
ROUGH ELECTRICAL 2023-07-10 Conditional Bob Sabich
ROUGH MECHANICAL 2023-07-10 Conditional Bob Sabich
ROUGH MECHANICAL 2023-07-31 Rescheduled
ROUGH ELECTRICAL 2023-07-31 Rescheduled
ROUGH ELECTRICAL 2023-08-02 Passed Bob Sabich
ROUGH MECHANICAL 2023-08-02 Passed Bob Sabich
ROUGH FRAME 2023-08-08 Passed Bob Sabich
INSULATION 2023-08-08 Passed Bob Sabich
SHEETROCK 2023-08-08 Passed Bob Sabich
FINAL BUILDING 2023-09-28 Failed Rodney Weathers
FINAL ELECTRICAL 2023-09-28 Failed Rodney Weathers
FINAL MECHANICAL 2023-09-28 Failed Rodney Weathers
FINAL PLUMBING 2023-09-28 Failed Rodney Weathers
FINAL BUILDING 2023-10-04 Failed Rodney Weathers
FINAL ELECTRICAL 2023-10-04 Failed Rodney Weathers
FINAL MECHANICAL 2023-10-04 Passed Rodney Weathers
FINAL PLUMBING 2023-10-04 Passed Rodney Weathers
FINAL ELECTRICAL 2023-10-16 Failed Rodney Weathers
FINAL BUILDING 2023-10-16 Failed Rodney Weathers
FINAL BUILDING 2023-10-24 Cancelled
FINAL ELECTRICAL 2023-10-19 Passed Rodney Weathers
FINAL BUILDING 2023-10-19 Passed Rodney Weathers
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.