Loading...
PC Reso 6951RESOLUTION NO 6951  OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO  APPROVING A CONDITIONAL USE PERMIT (U‐2022‐001) TO ALLOW  THE RENEWAL OF AN EXISTING MONO‐EUCALYPTUS WIRELESS  COMMUNICATIONS FACILITY (U‐2011‐10)   LOCATED AT 23600 VIA ESPLENDOR     SECTION I: PROJECT DESCRIPTION    Application No.: U‐2022‐001  Applicant: Kathryn Leal (Epic Wireless Group LLC)  Location: 23600 Via Esplendor (APN: 342‐54‐016)    SECTION II: FINDINGS FOR A USE PERMIT:    WHEREAS, the Planning Commission of the City of Cupertino received an application  for a Conditional Use Permit (U‐2022‐001) to consider renewal of an existing mono‐  eucalyptus wireless communications facility;    WHEREAS, the necessary public notices have been given as required by the Procedural  Ordinance of the City of Cupertino, and the Planning Commission has held at least one  public hearing in regard to the application; and    WHEREAS, pursuant to the provisions of the California Environmental Quality Act of  1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State  CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)  (hereinafter, ʺCEQA Guidelinesʺ), the City staff has independently studied the proposed  Project and has determined that the Project is exempt from environmental review  pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons  set forth in the staff report dated June 14, 2022 and incorporated herein; and    WHEREAS, the applicant has met the burden of proof required to support said  application; and    WHEREAS, the Planning Commission finds that:  Resolution No. 6951 Page 2 U-2022-001 June 14, 2022   1. The proposed development qualifies as an eligible facilities request pursuant to 47  CFR 1.6100(b)(4).    2. The proposed development to does not substantially change the dimensions of an  existing support structure at the project location, as defined in 47 CFR 1.6100.    WHEREAS, the Planning Commission is the approval authority for this project and is  granted the authority by the Municipal Code to exercise its independent judgment, based  on the record before it, for purposes of the California Environmental Quality Act; and    NOW, THEREFORE, BE IT RESOLVED that the Planning Commission takes the  following actions:    1. Exercises its independent judgment and determines that the Project is exempt  from CEQA pursuant to CEQA Guidelines section 15301. The Class 1 exemption  applies to existing facilities that involve negligible or no expansion of existing or  former use. The proposed project does not include alterations of modifications to  the existing wireless communication facility or associated equipment. Therefore,  the proposed project would not involve the expansion of the former use (Section  15301, Class 1), will not significantly expand the use beyond the current use that  already exists or previously existed, and will not have a significant effect on the  environment.    2. Approves the application for a Conditional Use Permit, Application no. U‐2022‐  001 subject to conditions which are enumerated in this Resolution beginning on  PAGE 3 thereof. The conclusions and sub conclusions upon which the findings  and conditions specified in this resolution are based, including those contained in  the Public Hearing record concerning Application no. U‐2022‐001 as set forth in  the Minutes of Planning Commission Meeting of June 14, 2022, are hereby  incorporated by reference as though fully set forth herein.    SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY  DEVELOPMENT DEPARTMENT    1. APPROVED EXHIBITS  Approval is based on the plan set and documentation entitled “Site Number:  CCL4019/CNU4019” prepared by AT&T and NUWAVE Communications,  consisting of 14 sheets showing the existing site plan and elevations and “Radio  Frequency Emissions Compliance Report for AT&T Mobility” prepared by  Resolution No. 6951 Page 3 U-2022-001 June 14, 2022   Waterford, consisting of 5 sheets, except as may be amended by conditions in this  resolution.    2. ANNOTATION OF THE CONDITIONS OF APPROVAL  The conditions of approval set forth shall be incorporated into and annotated on  the first page of the building plans.    3. ACCURACY OF PROJECT PLANS  The applicant/property owner is responsible to verify all pertinent property data  including but not limited to property boundary locations, building setbacks,  property size, building square footage, any relevant easements and/or  construction records. Any misrepresentation of any property data may invalidate  this approval and may require additional review.    4. PREVIOUS CONDITIONS OF APPROVAL  All previous conditions of approval, in accordance with U‐2011‐10 shall remain in  effect except as may be amended by conditions contained in this resolution.    5. EXPIRATION DATE  This use permit shall expire ten (10) years after the effective date of the permit.  The applicant may apply for a renewal of the use permit at which time the  Planning Commission may review the state of wireless communication  technologies, camouflage techniques and maintenance to determine if the visual  impact of the aerial facility can be reduced.    6. TREE POLE APPEARANCE AND MAINTENANCE  The applicant shall use a sufficient number of artificial branches to obscure the  appearance of the panel antennas and any associated mounting framework. Panel  antennas mounted away from the mast shall be covered with leaf socks to blend  with the mottled foliage of the artificial branches. Any antenna mounted close to  the mast shall be painted to mimic the tree trunk. The foliage shall have a mottled  green/brown coloration.    The building permit shall be reviewed and approved to the satisfaction of the  Community Development Director to ensure the above condition is met. The  applicant shall perform regular maintenance of the tree pole to maintain its  appearance and obscure the panel antennas from public view.    7. NOISE CONTROL  Base equipment stations are subject the Community Noise Control Ordinance,  Chapter 10.48. Noise levels shall not exceed those as listed in the Community  Resolution No. 6951 Page 4 U-2022-001 June 14, 2022   Nosie Control Ordinance, Cupertino Municipal Code Chapter 10.48. If there are  documented violations of the Community Noise Control Ordinance, the Director  of Community Development has the discretion to require noise attenuation  measures to comply with the ordinance.    8. CONSULTATION WITH OTHER DEPARTMENTS  The applicant is responsible to consult with other departments and/or agencies  with regard to the proposed project for additional conditions and requirements.  Any misrepresentation of any submitted data may invalidate an approval by the  Community Development Department.    9. INDEMNIFICATION AND LIMITATION OF LIABILITY  As part of the application, to the fullest extent permitted by law, the applicant shall  agree to indemnify, defend with the attorneys of the City’s choice, and hold  harmless the City, its City Council, and its officers, employees, and agents  (collectively, the “indemnified parties”) from and against any liability, claim,  action, cause of action, suit, damages, judgment, lien, levy, or proceeding  (collectively referred to as “proceeding”) brought by a third party against one or  more of the indemnified parties or one or more of the indemnified parties and the  applicant related to any Ordinance, Resolution, or action approving the project,  the related entitlements, environmental review documents, finding or  determinations, or any other permit or approval authorized for the project. The  indemnification shall include but not be limited to damages, fees, and costs  awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs,  liabilities, and expenses incurred in connection with such proceeding whether  incurred by the Applicant, the City, or the parties initiating or bringing such  proceeding.    The applicant shall agree to (without limitation) reimburse the City its actual  attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees  and costs shall include amounts paid to the City’s outside counsel and shall  include City Attorney time and overhead costs and other City staff overhead costs  and any costs directly related to the litigation reasonably incurred by City. The  applicant shall likewise agree to indemnify, defend, and hold harmless the  indemnified parties from and against any damages, attorneys’ fees, or costs  awards, including attorneys’ fees awarded under Code of Civil Procedure section  1021.5, assessed or awarded against the indemnified parties. The Applicant shall  Resolution No. 6951 Page 5 U-2022-001 June 14, 2022   cooperate with the City to enter a Reimbursement Agreement to govern any such  reimbursement.    The Applicant shall agree to (without limitation) reimburse the City for all costs  incurred in additional investigation or study of, or for supplementing, redrafting,  revising, or amending, any document (such as an Environmental Impact Report,  negative declaration, specific plan, or general plan amendment) if made necessary  by proceedings challenging the project approvals and related environmental  review, if the applicant desires to continue to pursue the project.    The Applicant shall agree that the City shall have no liability to the Applicant for  business interruption, punitive, speculative, or consequential damages.    10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS  The Conditions of Project Approval set forth herein may include certain fees,  dedication requirements, reservation requirements, and other exactions.      PASSED AND ADOPTED this 14th day of June, 2022 at a noticed Public Hearing of the  Planning Commission of the City of Cupertino, State of California, held by the Director  of Community Development, or his or her designee, pursuant to Cupertino Municipal  Code Section 19.12.120.    AYES: COMMISSIONERS:  Scharf, Madhdhipatla, Kapil, Saxena  NOES: COMMISSIONERS: None  ABSTAIN: COMMISSIONERS: None  ABSENT: COMISSIONERS: Wang  ATTEST: APPROVED:        Piu Ghosh Steven Scharf  Planning Manager Chair, Planning Commission